Key Performance Indicators of Building Project (건축 프로젝트의 경영성과지표 선정 연구)

  • Choi, Jae-Hwi;Sohn, Hyo-Won;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.61-72
    • /
    • 2011
  • Management performance of a construction company can be the sum of management performance of each different project. Therefore, the measurement of management performance following construction projects is essential for securing the competitiveness of a company. However, most research has been related to the performance measurement of the construction industry and companies and little has been conducted on individual project's performance. In particular, building projects have various characteristics depending on construction orderer, type and commissioning entity but no performance indicators have been selected based on this classification. This study aims to select performance indicators for subdivided areas based on project characteristics as well as those which can be commonly used to measure management performance at construction and trial run stages of building projects. In the future, those indicators proposed in this study can be used for developing methodology to evaluate them and later applied to actual building projects to generate quantitative data. In addition, they are expected to be used as reference for selecting indicators to measure management performance of plant and civil engineering projects.

Developing an Execution Strategy for FPSO

  • Kang, Jae-Sung;Kang, Ho-Keun;Park, Jae-Hong;Ha, Tae-Bum
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2012.06a
    • /
    • pp.43-46
    • /
    • 2012
  • 2011년 IMA의 자료[1]에 의하면, 현재 251척의 부유식 생산설비가 운영되고 있으며, 이중 FPSO가 차지하는 비율은 64%에 이른다. 또한, 가장 각광을 받고 있는 부유식 생산설비의 유형인 FPSO는 현재 40여척을 건조 (New building) 및 개조(Conversion)를 하고 있다. 전체적인 FPSO의 개발 및 건조 프로젝트는 일반 선박 프로 젝트와는 다르게 환경적, 정치적, 상업적인 영향을 많이 받는다. 예를 들면, 같은 구역에 석유/가스 채굴을 위한 프로젝트를 승인받은 기업들은 각자의 기술력, 재정상태, 채굴구역의 정치적인 영향력에 따라서 프로젝트의 초기 개념설계부터 전혀 다른 방향으로 구축할 수 있다. 이러한 변수가 많은 프로젝트를 성공적으로 수행하기 위해서는 각 단계별 세부 계획도 동시에 이루어져야 한다. 본 연구에서는 이러한 세계적인 해양구조물의 대표 격인 FPSO의 특성을 보고하고 이와 관련되는 프로젝트의 다양한 수행 절차 및 시스템/장비에 대해 설명한다.

  • PDF

Design of Commissioning System for Building Energy Management using Facility Working Database (설비 작동 정보 데이터베이스에 기반한 건물 에너지 커미셔닝 시스템 디자인)

  • Choi, Jongwoo;Jeong, Youn Kwae;Lee, Il Woo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2015.04a
    • /
    • pp.574-576
    • /
    • 2015
  • 커미셔닝은 건물의 에너지 사용량을 줄이기 위한 일련의 과정을 의미한다. 본 논문에서는 건물 에너지 관리를 수행하기 위한 커미셔닝 시스템의 디자인에 대해 서술한다. 건물 내에 존재하는 각 설비에 센서를 설치하는 것에 더하여 센서의 정보를 저장하기 위한 설비 작동 정보 데이터베이스가 구축되어야 한다. 설비 작동 정보 데이터베이스 및 기상 정보 데이터베이스 등을 활용하여 커미셔닝 시스템은 전체 건물의 에너지 사용 환경을 분석한다. 커미셔닝 시스템 엔진의 분석결과는 건물 관리자에게 제공되어 더 나은 건물 에너지 관리를 가능케 한다.

Practical Experience with Full-scale Performance Verification of Dynamic Vibration Absorbers installed in Tall Buildings

  • Love, J.S.;Morava, B.
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.2
    • /
    • pp.85-92
    • /
    • 2021
  • Dynamic vibration absorbers (DVAs) in the form of tuned sloshing dampers (TSDs) and tuned mass dampers (TMDs) are commonly used to reduce the wind-induced motion of high-rise buildings. Full-scale performance of structure-DVA systems must be evaluated during the DVA commissioning process using structural monitoring data. While the random decrement technique (RDT) is sometimes employed to evaluate the DVA performance, it is shown to have no theoretical justification for application to structure-DVA systems, and to produce erroneous results. Subsequently, several practical methods with a sound theoretical basis are presented and illustrated using simulated and real-world data. By monitoring the responses of the structure and DVA simultaneously, it is possible to directly measure the effective damping of the system or perform system identification from which the DVA performance can be evaluated.

A Study on the Feasibility of COBie to the Wastewater Treatment Plant (COBie 기반 하수처리시설 유지관리시스템 구축)

  • Choi, Jae-Ho;Um, Dong-Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.273-283
    • /
    • 2014
  • With the introduction of COBie (Construction Operation Building Exchange) in BIM technology enabling an automatic transfer of design and construction information to operation and management (O&M) phase, the BIM centric O&M management system development process has been tested on the subject of architectural types of building. However, for now, there is a need to investigate the technical feasibility of COBie application to civil structures including industrial facilities. This study takes both "O&M Guideline for Public Wastewater Treatment Plant" and a real wastewater treatment plant into account for the purpose, in which the latter is intended to supplement the result of the first. The findings are three-folds: (1) COBie, as an asset modeling, is not sufficient enough to encompass commissioning data, (2) more relevant IFC development and family library build-up useful to modeling wastewater treatment plant is imperative, and (3) well-planned coordination and organization of COBie data-set in line with O&M practice will enhance the feasibility of the COBie in industrial facilities. The result could be used for a basis study for COBie application, particularly in industrial facilities.

Risk Factors Analysis and Quantitative Risk Assessment Model for Plant Construction Project (플랜트 건설 리스크 분석 및 리스크 정량화 모델 개발에 관한 연구)

  • Ahn, Sung-Jin;Kim, Tae-Hui;Nam, Kyung-Yong;Kim, Ji-Myong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.1
    • /
    • pp.77-86
    • /
    • 2019
  • Due to the increasing demand for and complexity of plant construction projects, unpredictable risk factors are on the consequent increase. For that reason, the quantitative risk analysis is being called for, in order for the development of a risk assessment model using risk indicators for the plant construction projects. This study used the claim payout data collected at a global insurance company to reflect the actual financial losses in plant construction projects as dependent variables in the risk assessment model. In terms of independent variables, the geographic information, i. e., landform, and the construction information including test-run, schedule rate, total cost and duration are adopted. In addition, this study suggests that the regression model containing such independent variables that are statistically significant can be applied to as a foundational guideline for the plant construction project risk analysis during the phase of construction and commissioning.

Software-In-the-Loop based Power Management System Modeling & Simulation for a Liquefied Natural Gas Carrier (SIL 기반 액화천연가스운반선 전력관리시스템의 모델링 및 시뮬레이션)

  • Lee, Kwangkook
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.21 no.6
    • /
    • pp.1218-1224
    • /
    • 2017
  • With the increasing risk in building liquefied natural gas carriers (LNGC), pre-simulation of various scenarios is required for system integration and safe operation. In particular, the power management system (PMS) is an important part of the LNGC; it works in tight integration with the power control systems to achieve the desired performance and safety. To verify and improve unpredicted errors, we implemented a simulation model of power generation and consumption for testing PMS based on software-in-the-loop (SIL) method. To control and verify the PMS, numeric and physical simulation modeling was undertaken utilizing MATLAB/Simulink. In addition, the simulation model was verified with a load sharing test scenario for a sea trial. This simulation allows shipbuilders to participate in new value-added markets such as commissioning, installation, operation, and maintenance.

Introduction to CM Experience from Incheon International Airport (IIA) Construction Project (인천국제공항건설 사업관리 경험)

  • Park, Dae-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.20-25
    • /
    • 2004
  • On July $18^{th}$, 2003, Incheon International Airport Corporation(lIAC) signed the Construction Management Service Contract with KIDS consortium (composed of Kun-Won Eng., ITM Corp, Do-Hwa Eng, Space Croup) for the $2^{nd}$ phase construction protect consists of landfill, $\#3$ runway, remote Concourse, IAT, BHS, cargo terminal, etc scheduled to be finished by the end of 2008. KIDS dispatched qualified engineers to the Construction Management Division of IIAC for providing technical assistance to IIAC members to pursue project goals in tulle. within budget with appropriate quality level to build one of leading hul] airports for the Northeast Asia legion in the $21^{st}$ century. The work scope covers upgrading various project procedures and related computer programs, cost and schedule control, design supervision for building design including support systerns such as HVAC, fire protection, elevators and escalators, boarding bridges, electrical and communication systems, and technical support for IAT/BHS, QA/QC, field test and inspection, start-up and commissioning, etc. The purpose of this paper is to introduce the major activities of the Construction Management Services performing at the IIA project for your reference.