• Title/Summary/Keyword: Build

Search Result 9,066, Processing Time 0.031 seconds

Output Behavior of Build-Up Force Measuring System (BUILD-UP 힘측정 시스템의 출력거동)

  • 강대임;송후근;홍창선
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.19 no.9
    • /
    • pp.2194-2205
    • /
    • 1995
  • In order to reduce the systematic error of a build-up system, we have proposed a new test procedure in which all force transducers in a build-up system are rotated by 90.deg. with a base platen fixed on a force standard machine. The setting positions of force transducers on the output of a build-up system were investigated using an orthogonal array. The effects of the parallelism of a build-up system and of the bending moment sensitivity of a force transducer were considered. The experimental results show that the setting position of the base platen hardly affects the output of the build-up system, but the setting positions of force transducers affects it strongly. It reveals that the new test procedure reduces effectively the systematic error of a build-up system.

The Automatic Determination of the Optimal Build-Direction in Rapid Prototyping (고속적층조형법에서 최적 적층방향의 자동결정)

  • 채희창
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 1997.04a
    • /
    • pp.150-155
    • /
    • 1997
  • Rapid Prototyping(RP) is the technique which is used to make prototypes or functional parts directly using the 3-D solid data. Before building the prototype, several processes such as transfering 3D data from CAD system(STL) determination of build-direction, adding support structure and slicing are required. Among the above processes. determination of build-direction is the target of this study. The build direction is determined by many factors according to the objective of the user, like part accuracy, number of support structure, build time, amount of trapped volume, etc, But it is not easy to determine the build-direction because there are many factors and some factors have dependent properties with one another. So, in this study the part accuracy, the number of support structures and build time are considered as the main factor to determine the optimal build-direction. To determine the optimal build-direction for increasing part accuracy, sum of projected area which caused stairstepping effect was considered. The less the projected area is the better part accuracy is About the optimal build-direction to minimize the amount of support structure, sum of projected area of facets that require support structures was considered. About the build time, we considered the minimum height of part we intended. About the build time, we considered the minimun height of part we intended to make.

  • PDF

The Direction of Capability-based Military Build-up (국가능력에 기초한한 군사력 건설방향)

  • 이필중
    • Journal of the military operations research society of Korea
    • /
    • v.27 no.2
    • /
    • pp.88-109
    • /
    • 2001
  • Defense minister of the ROK, Kim Bong-sin suggested that the ROK′s military build-up policy will change from "scenario-based" to "capability-based". Entering the 1990s the ROK′s military build-up policy met difficulties to accomplish its goal, modernizing and strengthening of its force structure and weapon systems because of limited budget. The concept of capability-based military build-up could commit a fault in estimating total amount of defense resources required for force planing. This is because that the total amount of defense resources related to force plan for the 15 years is fixed to embody military strategy. The concept of capability-based military build-up plays a role as a constraint in choosing a military strategy. This has no connection with military build-up. Therefore the resources of mid-term military build-up program and scale of annual defense budget could be affected by the situations of its national economy. In this respect, the scale of annual defense budget and resources could be changed in accordance with national economic condition, however, the total amount of resources required to build-up military force for 15 years, namely resources of military force planing requirement for 15 years, is given already for the accomplishment of military strategy. The purpose of this study is to seek a direction of the ROK′s military build-up policy in a viewpoint of capability-based military build-up.

  • PDF

Large Force Measuring System Using Build-up Technique; (Build-up 기법을 이용한 대용량 힘 측정 시스템 개발)

  • Kang, Dae-Im;Song, Hou-Keun
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.21 no.3
    • /
    • pp.477-484
    • /
    • 1997
  • This paper describes the build-up force measuring system of 9.9 MN capacity which consists of nine force transducers of each having 1.1 MN capacity. We have specially designed a force transducer for a build-up force measuring system to reduce the uncertainty of a build-up system and to accomodate the new test procedure for a build-up system. It reveals that the relative uncertainty of the force measuring system is less than 1.5*10$^{-4}$ in the ran9e of 1-4.5 MN irrespective of loading direction. The force measuring system may be used to calibrate a 10 MN force standard machine to be used as a large force standard in Korea.

A Process Model for Project Management of Design-Build System and Method for Constitution of Database (건축 프로젝트의 설계시공일괄 수행방식 관리를 위한 프로세스 모델 개발 및 데이터 베이스 구축 방안)

  • Kim Eui-Suk;Kim Chang-Gyo;Lee Kyung-Kook;Park Sang-Jun;Son Bo-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.242-245
    • /
    • 2004
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alterative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather than single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial know-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigated throughly the function and information flows all over the design-build project. In this research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to Improve the consistency of functional process and minimize incoherent activities in each phase of design-build project.

  • PDF

The Process Model for Project Management of Design-Build System and Constitution of Database (설계시공일괄 방식의 건축 프로젝트 관리를 위한 프로세스 모델 및 데이터베이스 구축)

  • Chun Jae-youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.109-116
    • /
    • 2005
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alternative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather din single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial t31ow-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigate throughly the function and information flows all over the design-build project. This research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to improve the consistency of functional process and minimize incoherent activities of the design-build projects.

An Approach to Recommending of Solutions for Resolving Gradle Build Error (Gradle 빌드 오류 해결을 위한 솔루션 추천 방안)

  • Kang, Mingu;Kim, Taeyoung;Kim, Suntae;Ryu, Duksan
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.6
    • /
    • pp.33-39
    • /
    • 2020
  • Developers spend considerable time manually repairing code that was not built during project construction. If the build fails, it is necessary to understand the failed execution, identify the cause of the failure, and then implement the solution. Build tools such as Gradle have been developed to reduce this effort and automate project construction. However, build tools still do not solve many errors, requiring developers to try to solve build errors. In this study, we propose a solution recommendation method to increase the success rate of Gradle build and reduce the effort required to resolve errors. We provide a way to collect build errors and a way to transition from build error messages to successful builds. In particular, 296 build error messages collected from Github's Java project are classified as solutions, and 89% show that the solution can be applied.

BUILD-UP 원리를 이용한 힘센서 제작 및 특성평가에 관한 연구

  • ;Force Lab
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2001.10a
    • /
    • pp.154-158
    • /
    • 2001
  • 산업이 고도화, 대형화됨에 따라 조선, 건설, 기계산업문야에서 대용량 힘 측정의 필요성이 날로 증가하고 있다. 힘 측정에 사용되는 힘 센서는 국가 힘 표준인 힘 표준기로부터 교정을 받아 사용함으로써 힘 측정 결과에 대해 국제적으로 인정받을 수 있다. 본 연구에서는 build-up 힘 표준기에 사용되는 build-up 힘센서를 설계 및 제작하고 힘 센서 각각의 특성과 build-up 시스템 전체의 특성을 실험하여 build-up 힘 센서의 오차를 평가하였다.

Reduction of Surface Roughness and Build Time with Model Splitting Method for Multi-Jet Modeling 3D Printer Parts (Multi-Jet Modeling 3차원 프린트를 위한 표면거칠기와 제작시간의 저감을 위한 모델 분할제작)

  • Kim, Ho-Chan;Lee, In-Tak;Lee, Kyung-Chang;Lee, Suk;Lee, Seok-Hee
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.27 no.5
    • /
    • pp.807-814
    • /
    • 2003
  • 3D printers are widely used to verify the designs in the early stage of product development, and are required to have short build time. However, the build time is still too long for a quick design review for engineers. This research focuses on how to split the prototype in order to reduce the build time and improve surface roughness. In order to verify the feasibility of prototype splitting, the build time and the roughness have been experimentally measured for various parts and build orientations. Based on the experimental results an expert system was developed for splitting the original CAD mod el by using an efficient splitting method. It can recommend a splitting plane based on build time, surface roughness and the number of divided parts. It is shown that the model splitting reduces the build time significantly and improves surface quality wit bout rough surfaces where the support was removed.

An Analysis on the Problems of General Conditions for Domestic Design-Build Construction Projects (국내 설계${\cdot}$시공일괄발주방식을 위한 공사계약 일반조건의 문제점 분석)

  • Seo Young-Min;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.303-306
    • /
    • 2003
  • Although design-build construction projects have recently increased. general conditions of construction contract are not reflecting the characteristic of design-build construction projects neither performing its fundamental roles as implying many claim elements. So. this study aims to propose the basis for improving the general conditions of the domestic design-build construction projects. This study reviews literatures associated with design-build construction contract and analyses domestic general conditions into foreign standard forms of general conditions. Additionally, it is examined the problems of design-build construction contracts and performed questionnaire survey to the practitioner in the construction contract field. In doing so, this study suggests the direction for improving general conditions of domestic design-build construction projects.

  • PDF