• 제목/요약/키워드: Bridge erection method

검색결과 21건 처리시간 0.02초

케이블과 비대칭 구조를 이용한 사장교 주두부 시공 방법 (The Erection Method of Starter Segment for Cable Stayed Bridge using Asymmetric System and Cable)

  • 조서경;윤태섭;정승욱;이재찬;어준
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.1031-1038
    • /
    • 2002
  • In this paper the erection method of the Seohae Bridge starter is presented. The erection method of starter for cable stayed bridge was changed from conventional bracket supported erection to heavy lifting supported directly by stays. There was the need to reduce the erection time drastically. The cost saving was obtained as a bonus.

  • PDF

영종대교 복층 Warren Truss 해상구간 가설공법 (Erection Method for Marine Section of Double Deck Warren Truss in Young Jong Grand Bridge)

  • 김정웅;서재화;양무석;육일동
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.232-239
    • /
    • 2001
  • 동북아 지역의 중추 공항 기능을 담당할 인천국제공항의 접근 교통 수단인 영종대교는 총 연장 $4,420{\cal}m$의 연육교로서 주경간부는 10,000ton급 이상의 선박운항이 가능한 세계 최초의 도로 및 철도 병용 복층 자정식 현수교와 접속 구간은 주경간부와의 연속성을 고려하여 복층 Truss교와 강상형교로 구성되어 있다. (주)한진중공업에서는 $2,250{\cal}m$의 복층 Truss 형식 중 해상구간 $1,375{\cal}m$(60,000tons)를 가설하였으며, 본 교량은 상로 6차선 도로, 하로 4차선 도로 및 철도복선으로 구성된 대규모 강교이다. 당초 가설공법은 교각사이에 Temporary Bent를 시공하여 교량을 $75{\cal}m$ 단위의 중블럭으로 제작하여 Floating Crane을 이용하여 가설하는 공법으로 계획되었다. 그러나 본 공법은 10개소 이상의 해상 가벤트를 설치하여 공사를 수행해야 하므로 공사기간이 길어지고 과다한 공사비 소요가 예상되며 해상공사 특성상 고품질 확보가 불확실하였다. 그러므로 당사에서는 $120{\cal}m$ 대블럭 Truss 교량을 일괄 육상/해상운송 및 육상과 동일한 조건에서 설치할 수 있는 공법을 개발함으로써 공사기간을 단축하고 현장 이음개소를 줄여 고품질을 확보함과 아울러 경제적인 공사수행이 가능했다. 본고에서는 영종대교 가설공사 수행을 위해 개발 적용한 운송 및 설치공법에 관한 기술자료를 소개함으로서 국내 교량가설 기술발전에 일조 하고자 한다.

  • PDF

보강형의 시공방법을 고려한 타정식 현수교의 초기형상해석 모델 (A Structural Analysis Model for the Initial Configuration of a Suspension Bridge Considering the Erection Method of Stiffening Girders)

  • 고성석;강성후;박선준;정재호
    • 대한토목학회논문집
    • /
    • 제29권4A호
    • /
    • pp.337-346
    • /
    • 2009
  • 타정식 현수교의 보강형 가설중의 경계조건과 하중조건의 변화를 고려하여 초기형상을 결정하기 위한 구조해석 모델링 방법 및 해석 알고리즘을 제안하였다. 타정식 현수교의 가설단계를 보강형의 가설시점을 기준으로 보강형 가설단계인 1단계와 완공단계의 2단계로 구분하였으며 이러한 가설단계를 고려하여 초기형상해석 단계를 1차 형상해석과 2차 형상보정해석의 2단계로 구분하였다. 각 해석단계에 대한 보강형의 경계조건과 작용하중의 모델링 방법 및 반복해석 알고리즘을 제안하였으며 실 교량에 대해 수치해석을 수행하여 기존 해석방법에 의한 초기형상해석결과와 비교, 분석하였다. 실 교량에 대한 수치해석 결과 기존 초기형상해석방법의 문제점을 파악할 수 있었으며 본 연구에서 제안된 방법을 적용할 경우 기존 방법의 문제점을 해결할 수 있음을 확인하였다.

현수교 PPWS 가설중 형상관리를 위한 PPWS 새그 및 장력민감도 산정법 개발 (Development of Sag and Tension Sensitivity Estimation Method for Configuration Control under PPWS Erection in a Suspension Bridge)

  • 정운;서주원;이원표
    • 대한토목학회논문집
    • /
    • 제32권5A호
    • /
    • pp.255-266
    • /
    • 2012
  • 현수교 주케이블은 완성시 교량의 구조적 건전성을 나타내는 중요한 지표이다. 주케이블은 가설완료시 자유 매달림(free hanging) 상태의 형상이 되며 교량완성시 행어, 보강형 등의 고정하중을 지지하여 가설완료시 형상과는 차이가 발생한다. 따라서, 주케이블의 가설완료시 형상이 교량완성시 형상에 직접적인 영향을 미치므로 가설중 형상관리가 매우 중요하다. 주케이블의 가설중 형상관리는 중앙 및 측경간은 새그조정으로, 정착경간은 장력조정으로 수행된다. 새그조정은 새그조절량에 대한 스트랜드 길이 조절량을 나타내는 산정값인 새그민감도가 필요하며 장력조정은 온도변화에 대한 장력변화량을 나타내는 장력민감도가 필요하다. 이에 본 연구에서는 케이블 형상가정에 따라 유도된 기본식과 이로부터 도출된 미분 관계식으로부터 새그 및 장력민감도를 산정하는 방법을 제안하였다. 그리고, 다양한 새그변화 요인에 대해 현수선 기본식을 사용한 비선형 수치해석 새그민감도 계산 흐름도를 제안하여 미분관계식을 적용한 새그민감도 결과와 비교하였다. 또한, 각 새그변화 요인이 복합적으로 발생함으로 이를 고려하여 케이블의 최종 새그변화량을 산정하는 방법을 제안하였다. PPWS 공법으로 시공중인 실교량을 대상으로 PPWS의 길이변화 및 온도변화, 경간장변화 등의 다양한 시공여건의 변화에 따른 새그 및 장력민감도를 산정하였다. 본 연구내용이 주케이블 가설중 형상관리 방법에 대한 체계적인 지침이 되기를 바라며, 향후 실교 현장적용 및 실증에 의해 완성도를 높일 것이다.

강 사장교 가설 중 임시 제진방법에 대한 풍동실험 연구 (Wind Tunnel Aeroelastic Studies of Steel Cable-stayed Bridge with Wind Cable and Temporary Support)

  • 조재영;심종한;이학은;권오훈
    • 한국강구조학회 논문집
    • /
    • 제18권1호
    • /
    • pp.33-45
    • /
    • 2006
  • 일반적으로 사장교와 같은 장대교량은 완성 후에 비하여 시공 중 바람에 흔들리기 쉬어 내풍 안정성 문제가 발생하는 경우가 많다. 완공상태에서 충분한 내풍안정성을 확보하고 있더라도 시공단계에서는 설계풍속 이하에서 플러터 등의 공기역학적 진동현상 이 발생하는 경우가 많기 때문에 가설공법이 결정되면 반드시 풍동실험을 능한 적절한 제진 대책 안을 입안해 두어야 한다. 본 연구에서는 가설단계를 고려한 3차원 전교모형실험을 통하여 주경간이 500m인 사장교의 공기역학적 거동을 살펴보았다. 작업 중에 안정성 확보가 중요한 밸런스드 캔틸레버 상태인 가설단계 50% 에서 내풍케이블 및 가설벤트를 이용한 4가지 제진 대책방안을 수립하여 각각에 대하여 내풍 안정성을 검토하였다. 각 설치방안 별 제진효과를 서로 비교 분석하여 검토 범위 내에서 사장교 시공 중 가장 효율적인 임시 제진방안을 제시하였다. 추가적으로 밸런스드 캔틸레버 상태와의 내풍안정성을 비교하기 위하여 완성계와 제진 대책이 없는 주경간 폐합전의 프리캔틸레버 상태에 대하여 살펴보았다.

Unbalanced wind buffeting effects on bridges during double cantilever erection stages

  • Mendes, Pedro A.;Branco, Fernando A.
    • Wind and Structures
    • /
    • 제4권1호
    • /
    • pp.45-62
    • /
    • 2001
  • This paper is focused on the torsional effects that are induced on bridge piers by unbalanced wind buffeting on the deck during double cantilever erection stages. The case of decks with variable cross section is considered in particular as this characteristic is typical of most frame bridges that are built by the cantilever method. The procedure outlined in the paper is basically an application of the method that Dyrbye and Hansen (1996) have illustrated for decks with constant cross section. This format was chosen because it is suitable for design purposes and may easily be implemented in structural codes. As a complement, the correspondence with the format that is adopted in the Canadian code (NBCC 1990) for the gust factor is established, which might be useful to bridge designers used to the North-American approach to the gust effects on structures. Only alongwind turbulence and horizontal movements of the deck are considered. The combination of torsional and bending effects is also discussed and it is illustrated with an example of application.

Investigation on flutter stability of three-tower suspension bridges under skew wind

  • Xinjun Zhang;Xuan-Rui Pan;Yuhan Leng;Bingze Chen
    • Wind and Structures
    • /
    • 제38권1호
    • /
    • pp.43-58
    • /
    • 2024
  • To ensure the flutter stability of three-tower suspension bridges under skew wind, by using the computational procedure of 3D refined flutter analysis of long-span bridges under skew wind, in which structural nonlinearity, the static wind action(also known as the aerostatic effect) and the full-mode coupling effect etc., are fully considered, the flutter stability of a three-tower suspension bridge-the Taizhou Bridge over the Yangtze River in completion and during the deck erection is numerically investigated under the constant uniform skew wind, and the influences of skew wind and aerostatic effects on the flutter stability of the bridge under the service and construction conditions are assessed. The results show that the flutter critical wind speeds of three-tower suspension bridge under service and construction conditions fluctuate with the increase of wind yaw angle instead of a monotonous cosine rule as the decomposition method proposed, and reach the minimum mostly in the case of skew wind. Both the skew wind and aerostatic effects significantly reduce the flutter stability of three-tower suspension bridge under the service and construction conditions, and the combined skew wind and aerostatic effects further deteriorate the flutter stability. Both the skew wind and aerostatic effects do not change the evolution of flutter stability of the bridge during the deck erection, and compared to the service condition, they lead to a greater decrease of flutter critical wind speed of the bridge during deck erection, and the influence of the combined skew wind and aerostatic effects is more prominent. Therefore, the skew wind and aerostatic effects must be considered accurately in the flutter analysis of three-tower suspension bridges.

Concrete arch bridges built by lattice cantilevers

  • Granata, Michele Fabio;Margiotta, Piercarlo;Recupero, Antonino;Arici, Marcello
    • Structural Engineering and Mechanics
    • /
    • 제45권5호
    • /
    • pp.703-722
    • /
    • 2013
  • In this paper a study about concrete arch bridges built by lattice cantilevers is presented. Lattice cantilevers are partial structures composed of deck, arch, piers and provisional steel diagonals, organized as reticular cantilever girders, in order to build arch bridges without the use of centrings, supports or temporary towers. Characteristics of this construction methodology with its variants are explained together with their implications in the erection sequence. Partial elastic scheme method is implemented in order to find initial forces of temporary cables and a forward analysis is carried out to follow the actual sequence of construction, by extending a procedure already applied to concrete cable-stayed bridges and to arches built by the classical suspended cantilever method. A numerical application on a case-study of a concrete arch bridge is performed together with a comparison between different methodologies followed for its construction sequence. Differences between erection by lattice cantilevers and cable-stayed cantilevers, are discussed. Results can be useful for designers in conceptual design of concrete arch bridges.

선형 적응적 가중 응답면기법에 의한 현수교의 위험도 분석 (Risk Analysis of Suspension Bridge by a Linear Adaptive Weighted Response Surface Method)

  • 조태준;김이현;조효남
    • 한국강구조학회 논문집
    • /
    • 제20권1호
    • /
    • pp.93-104
    • /
    • 2008
  • 국내 시공 중인 현수교의 시공단계에 대한 신뢰성 해석을 통한 위험성 평가를 실시하였다. 본 논문의 주요 연구목표는 (1) 현수교주케이블 소선의 파단에 대한 신뢰성 해석, (2) 보강형 거더 가설 28단계에 대한 위험단계 결정, (3) 보강형 거더 가설중 시공관리에 대한 한계상태의 신뢰성 평가이다. 기존의 현수교에 대한 연구와 설계는 주로 경험적인 데이터에 의존해 왔으나 최근 조사된 자료에 의하면 교량의 완공 전에 발생하는 사고의 원인의 80%는 인간의 오류, 계획, 설계, 재료 및 하중의 불확실성과 관련되어 있다. 교량의 완성계에 대해서는 많은 연구가 수행되어왔으나 시공중의 불확실성에 대해서는 시방서나 지침 등으로 정리되어 있지 않은 부분이 많다. 개선된 선형 적 용적 응답면기법을 사용하여 예제교량의 시공단계에 대한 위험성 평가를 하였다.