• Title/Summary/Keyword: Blasting vibration

Search Result 432, Processing Time 0.025 seconds

A new bridge-vehicle system part I: Formulation and validation

  • Chan, Tommy H.T.;Yu, Ling;Yung, T.H.;Chan, Jeffrey H.F.
    • Structural Engineering and Mechanics
    • /
    • v.15 no.1
    • /
    • pp.1-19
    • /
    • 2003
  • This paper presents the formulation of a new bridge-vehicle system with validation using the field data. Both pitching and twisting modes of the vehicle are considered in the contribution of the dynamic effects in the bridge responses. A heavy vehicle was hired as a control vehicle with known axle weight, axle spacing and spring coefficients. The measured responses were generated from the control vehicle running at a particular speed at a test span at Ma Tau Wai Flyover. The measured responses were acquired using strain gauges installed beneath the girder beams of the test bridge. The simulated responses were generated using BRVEAN that is a self-developed program based on the proposed bridge-vehicle system. The validation shows that the bridge model is valid for representing the test bridge and the governing equations are valid for representing the motion of moving vehicles.

A Study on Experimental and Numerical Analysis for Behavior of Multi-layerd Pipeline Subjected to Blasting Vibration (지중 다중 관의 발파 진동 특성 분석을 위한 실험 및 수치해석적 연구)

  • Kim, Moon-Kyum;Won, Jong-Hwa;Noh, Gi-Seok;Cho, Seok-Ho;Kim, Kyung-Min
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.417-420
    • /
    • 2010
  • 지중매설관은 경우에 따라 긴 수송거리를 보이기 때문에 부식 및 충격에 의한 파손 등에 대한 모니터링이 어려운 실정이다. 이러한 조건을 극복하기 위하여 복합관 및 다중관을 설치하고 있으나, 이에 대한 연구는 아직 미비한 실정이다. 본 연구에서는 발파진동원에서 고정된 이격거리, 매설심도에서 배관 상단에 특정 진동속도를 발생시키는 발파 하중을 고려하여, 이격거리에 대한 수치해석을 수행하였으며 장약량에 따른 이격거리와 발파효율을 측정하였다. 실험값과 수치해석 값의 오차는 발파지점에서 가까울수록 크게 나타났으며 발파지점과 마주보는 방향이 반대방향보다 크게 나타났다.

  • PDF

A Case of Shell Structure Demolition Using Explosives (Shell 구조물의 발파해체 사례)

  • Song, Young-Suk;Jeong, Min-Su
    • Explosives and Blasting
    • /
    • v.29 no.2
    • /
    • pp.67-80
    • /
    • 2011
  • Recently, the number of structure demolitions has increased in both civil and architecture fields due to various reasons such as redevelopment of a city, utilization of sites and restoration of deteriorated structures. In the past, domestic shell structures had been constructed with brick masonry and they were not high. Therefore, their demolition had been executed with ease. Recently, however, taller reinforced concrete shell structures have become a target for the destruction. Under these circumstances, how to efficiently demolish a structure and how to minimize effects of the destruction on environment including vibration and noise have become a main issue. One of the possible solutions is the explosive demolition. In this study, a case of explosives demolition of the stack, which is located in Jeju Thermal Power Plant in Republic of Korea and is 70 m tall, is addressed. In order to fall down the structure against the desired direction, 13.5 kg dynamite and 100 electric detonators were used.

A Evaluation of Standard Support Pattern for Two-Arch Road Tunnel (2-Arch 도로터널에 적용된 표준지보패턴의 적정성 검토)

  • Chun, Byungsik;Choi, Kwangbo;Kim, Hyeyang;Yoo, Junhee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.9 no.7
    • /
    • pp.25-35
    • /
    • 2008
  • In domestic cases, the standard support pattern of 2-lanes road tunnels is presented because construction experience and high degree various data was abundant. But, it is not desirable to apply standard for 2-Arch tunnels that the precedent and measuring data is insufficient existing support pattern blasting plan and interpretation of separate way concerning specific terrain and rock quality. In this study, behavior according to load distribution ratio and Unsymmetrical Pressure about standard support pattern which is applied in design and construction of 2-arch tunnels was analysed and the examination of blasting vibration has influence on the center wall is conducted as a consequence reasonableness of support whether or not with presumed support pressure and ground reaction curve method. In result appropriateness of standard support pattern, support quantity is proper but considers specific terrain and rock quality condition when design and construction of further step 2-arch tunnel standard support pattern must be decided by considering terrains, soil properties and construction condition of the objective tunnel.

  • PDF

Dynamic performance of girder bridges with explosion-proof and aseismic system

  • Wang, Jingyu;Yuan, Wancheng;Wu, Xun;Wei, Kai
    • Structural Engineering and Mechanics
    • /
    • v.61 no.3
    • /
    • pp.419-426
    • /
    • 2017
  • Recently, the transportation of dangerous explosive goods is increasing, which makes vehicle blasting accidents a potential threat for the safety of bridge structures. In addition, blasting accidents happen more easily when earthquake occurs. Excessive dynamic response of bridges under extreme loads may cause local member damage, serviceability issues, or even failure of the whole structure. In this paper, a new explosion-proof and aseismic system is proposed including cable support damping bearing and steel-fiber reinforced concrete based on the existing researches. Then, considering one 40m-span simply supported concrete T-bridge as the prototype, through scale model test and numerical simulation, the dynamic response of the bridge under three conditions including only earthquake, only blast load and the combination of the two extreme loads is obtained and the applicability of this explosion-proof and aseismic system is explored. Results of the study show that this explosion-proof and aseismic system has good adaptability to seism and blast load at different level. The reducing vibration isolation efficiency of cable support damping bearing is pretty high. Increasing cables does not affect the good shock-absorption performance of the original bearing. The new system is good at shock absorption and displacement limitation. It works well in reducing the vertical dynamic response of beam body, and could limit the relative displacement between main girder and capping beam in different orientation so as to solve the problem of beam falling. The study also shows that the enhancement of steel fibers in concrete could significantly improve the blast resistance of main beam. Results of this paper can be used in the process of antiknock design, and provide strong theoretical basis for comprehensive protection and support of girder bridges.

A manual for the revised TBM tunnel specification (개정 TBM 터널 표준시방서 해설 연구)

  • Sagong, Myung;Jung, Chi Kwang;Moon, Joon Bai;Kim, Jeayoung;Yun, Do Sik;Yu, Myeong Han
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.4
    • /
    • pp.415-428
    • /
    • 2015
  • With increase of the extension of long tunnels and urban tunnelling, demands on the new tunnelling technologies are raised. Currently, drilling and blasting tunnel construction method is mostly used, however, because of sever blast vibration for some occasions, complaints from local residents and rock damages are inevitable. Accordingly, TBM tunnelling is more efficient and effective for such conditions. Nevertheless, tunnel construction costs of TBM cannot compete that of the drill and blasting method in Korea. To overcome such limitations, various TBM equipments and construction technologies are required. In addition, continuous revision of the design standard and specification are required. In this study, a detailed explanation regarding the revised version of TBM section in the tunnel standard specification at 2015 is shown.

Comparison of Hoek-Brown and Mohr-Coulomb failure criterion for deep open coal mine slope stability

  • Aksoy, Cemalettin O.;Uyar, Guzin G.;Ozcelik, Yilmaz
    • Structural Engineering and Mechanics
    • /
    • v.60 no.5
    • /
    • pp.809-828
    • /
    • 2016
  • In deep open pit mines, slope stability is very important. Particularly, increasing the depths increase the risks in mines having weak rock mass. Blasting operations in this type of open pits may have a negative impact on slope stability. Several or combination of methods can be used in order to enable better analysis in this type of deep open-pit mines. Numerical modeling is one of these options. Many complex problems can be integrated into numerical methods at the same time and analysis, solutions can be performed on a single model. Rock failure criterions and rock models are used in numerical modeling. Hoek-Brown and Mohr-Coulomb terms are the two most commonly used rock failure conditions. In this study, mine planning and discontinuity conditions of a lignite mine facing two big landslides previously, has been investigated. Moreover, the presence of some damage before starting the study was identified in surrounding structures. The primary research of this study is on slope study. In slope stability analysis, numerical modeling methods with Hoek-Brown and Mohr-Coulomb failure criterions were used separately. Preparing the input data to the numerical model, the outcomes of patented-blast vibration minimization method, developed by co-author was used. The analysis showed that, the model prepared by applying Hoek-Brown failure criterion, failed in the stage of 10. However, the model prepared by using Mohr-Coulomb failure criterion did not fail even in the stage 17. Examining the full research field, there has been ongoing production in this mine without any failure and damage to surface structures.

Case Study on the Explosive Demolition of the KOGAS Office Building in Bundang District (한국가스공사 분당사옥 발파해체 시공사례)

  • Kim, Sang-min;Park, Keun-sun;Son, Byung-min;Kim, Ho-jun;Kim, Hee-do;Kim, Gab-soo
    • Explosives and Blasting
    • /
    • v.36 no.4
    • /
    • pp.48-61
    • /
    • 2018
  • This case study is concerned with the project of the explosive demolition for the KOGAS office building located in Bundang district in Seongnam city. Since the office building was a kind of long-span beam structures, a mechanical demolition method using jacking support systems was considered in the beginning of the project. With consideration of the excessive reinforcement cost, uncertainty of safety, and prolonged construction period, however, the original plan was later changed to use an explosive demolition method. For the purpose of protecting nearby buildings and facilities during the collapse process, the explosive initiation sequence was elaborately designed to bring down the building structure towards its front left corner. A total of over 550 electronic detonators (Unitronic 600) was used to sequentially initiate the explosives installed at appropriate columns in the first, second, and fifth floors. To diminish dust production, water bags of small and large sizes were respectively installed at each column and on the floors to be blasted. As such, every effort was exercised to mitigate overall noise, dust, and shock vibrations that could be generated during the explosive demolition process for the office building.

Public Nuisance and Aggregate Assessments of the Dangri Crushed Stone Quarry Busan, Korea. (부산직할시 산양사리 당리석산의 채석공해 및 쇄석골재 평가연구)

  • 김항묵
    • Journal of the Korean Professional Engineers Association
    • /
    • v.16 no.3
    • /
    • pp.41-53
    • /
    • 1983
  • The Dangri Crushed Stone Quarry is located in Dangridong, Busan City, and around the estuary of the Nagdong River. The quarry is considered to be a very promised one in the urban area from the standpoints of the assessment of the aggregate rank, the environmental impacts and the transportation distance. The crushed stones for aggregate of the quarry marks the higher rank in the gravity, the absorption ratio, the abrasion ratio, and the stability in comparison with the JISA 5005. The basement vibrations of the residential section in the vicinity of the quarry, which are arised by the millisecond blasting at the quarry site using the gelatin dynamites less than 39kg in weight, are measured to assess the vibration nuisance. The values of acceleration and the magnitudes are less than eight gals and O on the Richter scale respectively, the vibration nuisance thus can be ignored in such scales of the experiments. The traffic vibrations of the residential section are slightly susceptible. In the experiments, the traffic vibrations appears to be sensibler to the basement than the explosion vibration. The explosion noises in the experiments are not checked not only on the RION Sound Level Meter but also to our ears. The values of traffic noises also are in the safety values of the noise nuisance. The crush dust suspends in the air toward the upper valley in the opposite side of the residential area because of the influences of the sea breeze and the valley wind in the daytime, and the monsoon and the topographic disposition. the dust nuisance thus would not be remained in problem. The quarry is operated in the daytime only. The traffic dust in the residential area will be reduced by the faultless pavement and the careful driving. The elaborate survey on the ridges and peaks surrounded the quarry is recommended to prevent in advance the accidents of the rock slide. Moreover, it is required to make an advisory committee to develop the industry and to save the techniques. The most important matter is the accomodation between the attitude of the enterprising man for the social responsibility to the public nuisance and the cooperative spirit of the inhabitants for the industry.

  • PDF

Safety Evaluation Method for Ground Ammunition and Explosive Storage Facilities due to Underground Tunnel Blast (지하시설 굴착공사에 따른 탄약저장시설 안전성 평가방법 연구)

  • Park, Sangwoo;Kim, Kuk-Joo;Park, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.4
    • /
    • pp.331-339
    • /
    • 2019
  • Recently, expansion of urban and social infrastructures is planned to go through the transfer of military facilities or crossing the infrastructures via underground tunnels. However, when crossing facilities such as ammunition and explosive storages, a high level of safety assessment is required to prevent an accidental explosion of ground ammunition. In this study, a case study was conducted to evaluate the effect of blasting for the construction of tunnel on the ground ammunition facilities. The design section of Sinansan train operated by the Korea Railroad Authority with agreement of the Ministry of National Defense was selected. For the purpose of this study, the vibration velocity due to explosion was predicted by using GTS-NX, a numerical analysis program. Through literature review, it was confirmed that the vibration velocity of 0.2cm/sec can be a safety evaluation standard. These safety evaluation indicators and procedures used in this study can be utilized as an index of safety evaluation in the planning of social infrastructures that cross the ammunition facilities in the future.