• Title/Summary/Keyword: Blackout start

Search Result 19, Processing Time 0.031 seconds

Characteristics on Stand-alone Operation of a Doubly-fed Induction Generator Applied to Adjustable Speed Gas Engine Cogeneration System

  • Daido, Tetsuji;Miura, Yushi;Ise, Toshifumi;Sato, Yuki
    • Journal of Power Electronics
    • /
    • v.13 no.5
    • /
    • pp.841-853
    • /
    • 2013
  • An application of doubly-fed induction generator (DFIG), which is one of adjustable speed generators, to a gas engine cogeneration system has been investigated. To operate during a blackout as an emergency power supply is one of important roles for the gas engine cogeneration system. However, the DFIG requires initial excitation for startup during a blackout because the DFIG has no excitation source. In this paper, we propose the "blackout start" as a new excitation method to generate a rated voltage at the primary side during a blackout. In addition, a stand-alone operation following a blackout has been investigated by using experimental setup with a real gas engine. Power flows in the generating set with the DFIG at the stand-alone operation have been investigated experimentally. Experimental investigation of the power flow suggests that the generating set with DFIG has optimal speed in minimizing whole system losses.

Primary Restorative Transmission Line Selection for Myanmar's Electric Power System

  • Kim, Yong-Hak;Song, In-Jun;Jang, Byung-Tae;An, Yong-Ho
    • Journal of Electrical Engineering and Technology
    • /
    • v.5 no.2
    • /
    • pp.191-196
    • /
    • 2010
  • Power system restoration following a massive or complete blackout starts with energizing the primary restorative transmission system. During this primary restoration process, unexpected overvoltage may happen due to nonlinear interaction between the unloaded transformer and the transmission system. In the case of the Myanmar electric power system, there are so many wide outage experiences, including complete blackout cases, caused by 230kV line faults and so on. Consequently, Myanmar's system operators have been well trained to deal with wide blackouts. Howver, system blackout restoration has been conducted by relying on the experience of only a few specialists. So, more scientific analysis is required to meet the requirements necessary to ensure fast and reliable system restoration. This paper presents analytical results on the primary restorative transmission system of Myanmar, focusing on the problems during the early restoration process. Methodologies are presented that handle load pick-up, terminal voltage and the reactive capability limitation of black-start generators to compensate the Ferranti effect. Static and dynamic simulation with the PSSolution and EMTDC programs respectively for the six cases are performed in order to select the primary restorative transmission lines.

Comparison of event tree/fault tree and convolution approaches in calculating station blackout risk in a nuclear power plant

  • Man Cheol Kim
    • Nuclear Engineering and Technology
    • /
    • v.56 no.1
    • /
    • pp.141-146
    • /
    • 2024
  • Station blackout (SBO) risk is one of the most significant contributors to nuclear power plant risk. In this paper, the sequence probability formulas derived by the convolution approach are compared with those derived by the conventional event tree/fault tree (ET/FT) approach for the SBO situation in which emergency diesel generators fail to start. The comparison identifies what makes the ET/FT approach more conservative and raises the issue regarding the mission time of a turbine-driven auxiliary feedwater pump (TDP), which suggests a possible modeling improvement in the ET/FT approach. Monte Carlo simulations with up-to-date component reliability data validate the convolution approach. The sequence probability of an alternative alternating current diesel generator (AAC DG) failing to start and the TDP failing to operate owing to battery depletion contributes most to the SBO risk. The probability overestimation of the scenario in which the AAC DG fails to run and the TDP fails to operate owing to battery depletion contributes most to the SBO risk overestimation determined by the ET/FT approach. The modification of the TDP mission time renders the sequence probabilities determined by the ET/FT approach more consistent with those determined by the convolution approach.

Analysis of Reactive Power Capability for Salient Synchronous Generators, and its Application to Primary Restorative Systems (돌극형 동기 발전기의 무효전력 공급 한계 해석 및 우선공급계통에의 적용)

  • Lee, H.J.;Park, S.M.
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.1
    • /
    • pp.14-17
    • /
    • 2007
  • Power system restoration following a massive blackout starts with re-energizing primary restorative transmission systems at first. The comparison of the TLCC(transmission line charging capacity) and the RPC(reactive power capability) of related black-start generator should be considered in this stage because overvoltage can be caused by self-excitation at the generator when the RPC is smaller than the TLCC. The RPC can be decided by two criteria. One is stator end core heating, and the other is steady state stability. RPC in steady state stability area has been found based on a synchronous reactance Xd. This paper presents RPC limit of salient pole machine which is different from that of non-salient pole machine in steady state stability area and shows derivation process about that.

A Stable Black-Start Strategy for a Stand-Alone DC Micro-Grid

  • Cha, Jae-Hun;Han, Yoon-Tak;Park, Kyung-Won;Oh, Jin-Hong;Choi, Tae-Seong;Ko, Jae-Hun;MAHIRANE, Philemon;An, Jae-Yun;Kim, Jae-Eon
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.1
    • /
    • pp.30-37
    • /
    • 2018
  • Unlike an AC system, a DC system does not cause problems with synchronization, stability, reactive power, system losses, and cost. However, more research is still required for the application of DC Systems. This paper proposes a stable black-start strategy for a stand-alone DC micro-grid, which consists of an energy storage system, photovoltaic generator, wind-turbine generator, diesel generator, and DC loads. The proposed method is very important for avoiding inrush current and transient overvoltage in the power system equipment during restoration after a blackout. PSCAD/EMTDC software was used to simulate, analyze, and verify the method, which was found to be stable and applicable for a stand-alone DC micro-grid.

Development of Power Restoration Training System for Local Operators (지역급전원을 위한 고장복구 교육시스템 개발)

  • Lee, N.H.;Song, I.N.;Park, C.W.;Jung, G.J.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.105-106
    • /
    • 2006
  • KEPRI has completed to develop KP-ROTS Ver 1.1 and applied to 12 power transmission district offices and Je-ju branch office in KEPCO, which was updated from the exiting power restoration training simulator related to power restoration project. This program has functions such as black-start line analysis for all network blackout, restoration training on wide blackout and simple study on outage plans. KEPCO expects that local operators will train well for restoration procedures against wide blackout by using KP-ROTS.

  • PDF

The Limit of Magnetic Helicity Estimation by a Footpoint Tracking Method during a Flux Emergence

  • Choe, Gwang Son;Yi, Sibaek;Jang, Minhwan;Jun, Hongdal;Song, Inhyuk
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.43 no.2
    • /
    • pp.58.2-58.2
    • /
    • 2018
  • Theoretically, the magnetic helicity transport flux through the solar surface into the upper atmosphere can be estimated indefinitely precisely by magnetic field footpoint tracking if the observational resolution is infinitely fine, even with magnetic flux emergence or submergence. In reality, the temporal and spatial resolutions of observations are limited. When magnetic flux emerging or submerging, the footpoint velocity goes to infinity and the normal magnetic field vanishes at the polarity inversion line. A finite observational resolution thus generates a blackout area in helicity flux estimation near the polarity inversion line. It is questioned how much magnetic helicity is underestimated with a footpoint tracking method due to the absence of information in the blackout area. We adopt the analytical models of Gold-Hoyle and Lundquist force-free flux ropes and let them emerging from below the solar surface. The observation and the helicity integration can start at different emerging stages of the flux rope, i.e., the photospheric plane initially cuts the flux rope at different levels. We calculate the magnetic helicity of the flux rope below the photospheric level, which is eventually to emerge, except the helicity hidden in the region to be swept by the blackout area with different widths. Our calculation suggests that the error in the integrated helicity flux estimate is about half of the real value or even larger when small scale magnetic structures emerge into the solar atmosphere.

  • PDF

Development of New Algorithm for the Analysis of Self-Excitation in Primary Restorative Transmission Systems (시송전 계통에서 자기여자 현상의 새로운 해석 알고리즘 개발)

  • Park S.M.;Lee K.S.;Bai J.C.;Hwang B.H.;Song I.J.;Lee N.H.;Lee H.J.
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.3
    • /
    • pp.117-121
    • /
    • 2005
  • Power system restoration following a massive blackout starts with re-energizing primary transmission lines at first. Some factors such as Ferranti effect, and line charging reactive power should be considered in this stage. Severe overvoltage may be induced by the Ferranti effect at the lines since it would be usually no load condition. And lack of capacitive reactive power will cause the self-excitation. This paper presents a new precise algorithm to analyze the primary restorative transmission system focused on the two major static overvoltage problems during the early restoration process.

A Study of Generator Excitation System for first Power Supply to gird line (가스터빈 시송전 발전기 여자시스템에 관한 연구)

  • Ryu, Ho-Seon;Lim, Ick-Hun
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1193-1194
    • /
    • 2011
  • We performed commissioning of redundant digital excitation system for gas turbine generator. One of its issues is first power supply test to gird line when it was compared with the other commissioning. If blackout will be happened, a few of start power plants must supply power to grid line. And then generator must increase voltage and real power slowly for line charge. The trial product was installed and successfully operated at a 100MW power plant after commissioning.

  • PDF

An Approach to Assessment of the Value of Black Start Service (자체기동 보조서비스의 가치평가 산정 방안)

  • Lee, Jeong-Ho;Oh, Tae-Kyoo;Kang, Dong-Joo;Ok, Ki-Youl
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.2
    • /
    • pp.256-263
    • /
    • 2009
  • For the power system to keep in a stable operating state, sufficient ancillary services must be available to respond to credible contingency events and return the power system to a satisfactory operating state in the case of contingencies as well as blackout events within specified predefined limits. The logical and reasonable bases of valuing and pricing the ancillary services are required to reach the common ground among market participants. The total amount of black start service transactions is quite small compared to the total ancillary service transactions as well as energy market transactions. Black start services must be provided as one of the ancillary services in the deregulated electricity market. In order to procure and remunerate black start services, it is necessary to quantify the value of the black start sources within the power system. In this paper, an approach to assess the value of the black start service is presented based on the cost-of-service solution. Financial simulation of the influence on market participants for the proposed approach on the service is carried out. The cost of the black start service is allocated in accordance with the principle of "causer pays", and the cost is shared by the producers and consumers equally that created the requirement for the service. Under the present electricity market, the mechanism to recover the cost is not implemented, a new approach to the ancillary services to provide incentive for the service providers has to be studied in the near future.