In Korea, various community investment renewable project models are being implemented to increase community acceptance of renewable energy. An important factor for enhancing local acceptance is that renewable energy projects have a positive effect on revitalizing the local economy such as income increase or job creation for residents and local companies. To maximize the local economic effect of large-scale community investment renewable energy projects, this study developed an evaluation index for local economy activation, whose indicators are the local return on investment, local companies' participation, local job creation, regional cooperation, transparency, and governance. Analysis of existing evaluation indicators and current renewable projects, financial analysis, and expert interviews were used in this research. The pilot evaluation determined that, the local economic effect was high in the following order: a fund investment wind project (Gangwon), benefit-sharing wind project (Jeju), and general wind project. In particular, residents' investment amount, the number of participating residents, and the amount and transparency of the regional cooperation fund were key factors to expand the effect of local economy activation. This evaluation index could be used in public bidding for renewable energy projects such as offshore wind zoning areas of local government.
Korean Journal of Construction Engineering and Management
/
v.7
no.2
s.30
/
pp.109-117
/
2006
Recent rapid changes such as construction market reduction, lowest bidding system of construction cost, five days per week system, and post-construction sale system are inevitably accelerating the competitiveness between construction companies. Those rapid changes of construction environment require construction companies, which are main participants of construction industry, to adapt to the changes and more to lead new construction environment. However, there are many construction uncertainties which could delay construction completion. Without the proper identification of construction uncertainties, structured strategy establishment and management of construction schedule, the competitive advantages of construction duration could not be made. Thus this paper limited the research boundary to construction duration competitiveness instead of general strategy establishment. Recognizing the importance of proper calculation of construction duration, requirements of construction duration reduction and limited researches related to construction schedule strategy, we established the 25 strategies for construction duration competitivenss by internal and external construction environment analysis and SWOT analysis, and then elicited the first considerations to accomplish the strategies through concensus of all the staffs by questionnaire, brainstroming and face-to-face interviews.
The automated assignment of multiple tasks to executing agents is a key problem in the area of multi-agent systems. In many domains, significant savings can be achieved by reallocating tasks among agents with different costs for handling tasks. The automation of task reallocation among self-interested agents requires that the individual agents use a common negotiation protocol that prescribes how they have to interact in order to come to an agreement on "who does what". In this paper, we introduce the multi-agent Traveling Salesman Problem(TSP) as an example of task reallocation problem, and suggest the Vickery auction as an interagent negotiation protocol for solving this problem. In general, auction-based protocols show several advantageous features: they are easily implementable, they enforce an efficient assignment process, and they guarantce an agreement even in scenarios in which the agents possess only very little domain-specific Knowledge. Furthermore Vickrey auctions have the additional advantage that each interested agent bids only once and that the dominant strategy is to bid one′s true valuation. In order to apply this market-based protocol into task reallocation among self-interested agents, we define the profit of each agent, the goal of negotiation, tasks to be traded out through auctions, the bidding strategy, and the sequence of auctions. Through several experiments with sample multi-agent TSPs, we show that the task allocation can improve monotonically at each step and then finally an optimal task allocation can be found with this protocol.
International conference on construction engineering and project management
/
2011.02a
/
pp.88-92
/
2011
Even though attempts are made to transform from 2D CAD to BIM representation for building design and construction, it were not so successful for practical implementation until recently in construction industry in Korea. However, there is a dramatic change for the use of BIM by collaboration among government, independent organizations as well as industry itself. Government reckons that BIM is an important tool for environment friendly construction and industry competitiveness. The government not only makes national BIM standards and push policies in order to make market environment. Independent organizations such as BuildingSMART Korea does active role to stimulate the transformation process successfully. They act as opinion leaders for the Government to consider BIM implementation for industry competitiveness issue. They make roadmap as well as technical standards and guidelines. It also leads technical developments and supports for its implementation. Government supports researches for the implementation of BIM. The research includes BIM standards, guidelines, linking with existing Architectural Administrative Information Systems, making libraries as well as education. Government makes policy for BIM as a compulsory data for bidding process of newly designed government buildings. Private sector not only agrees BIM as a tool to adapt but also essential methods for its survival in domestic and foreign construction market. Architectural design companies and constructions companies currently develop technical skills and implement BIM for new projects such as Dongdaemoon Plaza that cannot be successfully drawn by conventional methods.
송전망은 전력수송을 가능하게 함으로써, 경쟁적 전력시장을 지지하는 하부구조의 역할을 한다. 하지만 송전망은 여러 제약조건에 의해 수송 한계에 다다를 수 있고 이렇게 공급능력의 한계를 벗어남으로써 발생한 송전혼잡은 전체 계통운영에 있어서 비용 상승을 일으킨다. 본고에서는 송전선로 내 혼잡이 가격에 미치는 영향을 알고 그로 인한 각 모선의 LMP(Locational Marginal Price) 형성에 대해 세부적으로 연구하였다. 그리고 입찰방법을 단순히 이상적인 상창이 아닌 송전 혼잡으로 인해 전력 공급자가 시장지배력을 갖게 되었을 경우에 대하여 적절한 입찰전략의 필요성을 언급하고 가능한 방법을 생각해 보았다.
현재와 같은 경쟁적 전력수급 시장에서 경쟁력을 확보하기 위해서는 모든 발전사업자는 이득 극대화를 위한 전략이 필요할 것이다. 이에 여러 발전 방식 중에서도 타 에너지원의 발전설비보다 에너지원의 생산, 저장, 소비 등 다양한 전략이 가능한 양수발전을 선택하여 효과적인 대응 방안을 찾아보고자 한다. 본 논문에서는 발전 경쟁 시장 체제하에서 동적 게임이론을 적용하여, 양수발전을 소유한 발전 사업자의 최적 입찰 전략 알고리즘을 제시한다.
The aim of this paper is to identify the barriers to the B2B e-commerce development in China's pharmaceutical industry and to devise an effective strategy for its future development. Built on a detailed investigation of the market structure and recent development of electronic commerce in China's pharmaceutical industry, this paper proposes that the key issue in the development of effective B2B e-commerce business models is the successful transformation of the inter- organizational information systems into electronic marketplaces. In order to ensure the success of such electronic marketplaces, a government driven approach will be needed. In the process, designing an incentive compatible mechanism of coordinating the interest of all the market players will be the prerequisite.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.51
no.7
/
pp.311-316
/
2002
It has been a basic model for the present electric power industry that more than two generators compete, and thereby the market clearing price and the generation schedules are determined through the bid process. In order for this paradigm to be applicable to real electric power systems and markets, it is necessary to reflect many physical and economic constraints related to frequency and transmission in the dispatching schedule. The paper presents an approach to deriving a Nash bargaining solution in a competitive electricity market where multiple generators are playing with the system operator who mitigates the transmission congestion to minimize the total transaction cost. In this study, we take the effect of the line flows and the role of system operator into the Game. Finally, a case study has been demonstrated to verify the proposed cooperative game.
International conference on construction engineering and project management
/
2005.10a
/
pp.1199-1202
/
2005
Knowledge has been considered one of the important elements that determine our future. Competitive power of an enterprise has also been transformed from labor, capital, and technology-oriented to knowledge-oriented. Current construction environment is experiencing overall decrease of number of construction contracts due to opening of domestic construction market and economic slump, problems on methods of receiving orders/bidding, and change of costumers' attitude, which intensify competition, therefore many companies consider adopting knowledge management to secure their competitive power. However, there are difficulties in adopting knowledge management and increasing the use by establishing management plan, Performance Measurement, and knowledge maintenance system in reality. Therefore, this study is to provide assistance to successful realization of knowledge management by suggesting development plan of knowledge management that enables knowledge management more efficient with certain goals.
Journal of the Society of Naval Architects of Korea
/
v.53
no.5
/
pp.362-370
/
2016
The weight estimation and calculation of FPSO topsides is first performed at the bidding stage of projects. At this time, it is difficult to estimate and calculate accurately the weight because most of items of FPSO are not apparently defined. Especially, in the case of the pipe rack module, its portion of the total weight and the range of weight variation are large due to special features of piping and electric equipment in the module. Thus, it is very important to estimate and calculate accurately its weight in the task of the weight estimation and calculation of FPSO topsides. In this study, the past data for the weight of the pipe rack module were collected and analyzed, the WBS (Work Breakdown Structure) for the pipe rack module was constructed, and primary variables and secondary variables for developing a weight estimation and calculation model were selected. That is, after analyzing the past data, the volume was selected as the primary variable and the regression analysis was performed based on the variable. Then, several secondary variables were selected and incorporated into a weight estimation and calculation model. At this time, the weight per discipline was assumed from ratios of the total weight. Finally, the weight of the pipe rack module was estimated and calculated by using the developed model. As a result, the deviation from the model was better than that (-20 % ~ 60 %) of other studies about the weight estimation and calculation of FPSO topsides. Thus, the validity and applicability of the weight estimation and calculation of the pipe rack could be checked.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.