• 제목/요약/키워드: Bid cost

검색결과 119건 처리시간 0.033초

230KV 2회선승 111M 높이 철탑설계 (I) (강폭 12km인 Bangladesh Jamana강 횡단용) (The design of 111m high steel towers with 220kv double circuits crossing 12 km wide Bangladesh River)

  • 이재숙
    • 기술사
    • /
    • 제15권4호
    • /
    • pp.12-24
    • /
    • 1982
  • East Parts of Bangladesh have been benifited by low cost energy generated by domestic natural gas but West parts where energy generated by imported fuel. Bangladesh Government authority has very much concerned to transmit the low cost electricity to the West from the East for past several years. To solve such concerns, cross-country 230kv double circuits Power transmission line was proposed, however there was a big obstacle for the realization of this line to cross the Jamuna river which has 12 km long width with a deep muddy river bed. A consultant engineering firm named Merz-Mclellan anyway finalized this plan and a world-wide bid was announced on June 31, 1979. Due to the expected difficulty to construct the towers on sea like area, only three construction groups have participated. including a Korean joint venture organization of Samsung-Korean Developement corporation-Kolon Electric Machinery company. After 3 months bid evaluation, contract was awarded to Korean Consosium and KEM Co was in charge of designing steel towers with anchor bolts and base plates beside to electrical engineering field. Then KEM Co have faced and over-comed many unenpected technical difficulties such as forced eccentricity joint on base plate, distorsion issue of 60mm thick plates welding, threading anchor bolts, tad heat treatment of some anchor bolts, disagreement from Consultant Engineer on multiplying factor of leg stresses for 45$^{\circ}$ wind and on reducing O.L.F for wind loads on cables for such 1220km long spans. After spending two years long period for designing and engineering towers, base plates, and anchor bolts, first shipment of tower was finally realized on Nov. 8, 1981 and on the other hand KDD has proceeded concrete caisson work on schedule at Jamuna river site and expected to complete tower erection and stringing of cables within this year of 1982 which was original completion target.

  • PDF

발주방식에 따른 성능수준 평가에 관한 연구 (Evaluation on Performance Level of Design-Build and Design-Bid-Build (Focused on Bridge Construction Projects))

  • 조규만;김희욱;현창택;구교진
    • 한국건설관리학회논문집
    • /
    • 제8권2호
    • /
    • pp.75-83
    • /
    • 2007
  • 최근 국내의 설계시공일괄방식(이하, 일괄방식)은 설계시공분리방식(이하, 기타방식)에 비해 높은 초기투자비용으로 인하여, 효용성에 대한 의문이 지속되고 있다 한편 발주방식별 성능을 평가한 기존의 연구를 살펴보면, 일괄방식은 공기측면과 품질측면에서 기타방식에 비해 우수한 것으로 보고되고 있다. 비교적 정량적 평가가 가능한 공기측면의 성과와 달리, 품질 측면의 성능은 해당 시설물의 발주자와의 면담을 통하여 만족도 수준을 평가하는 정성적인 평가가 대부분이다. 따라서 이 연구에서는 기존의 연구와는 달리, 2000년 이후 일괄방식과 기타방식으로 발주된 교량계획에 대한 성능수준을 평가하기 위하여, 설계도서 중심으로 계획성, 시공성, 유지관리성 등의 측면에서 평가해 보고자 한다. 이를 통하여 실제로 발주방식별 품질 등의 성능 측면에서 발주방식별 성능수준의 차이를 도출하였다.

시뮬레이션을 통한 제철플랜트 배관장치 설계비용의 변동 범위 분석 (Analysis of Cost Variation of Piping Equipment Design of a Steel Manufacturing Plant by Simulation)

  • 배경석;허기무;윤성훈;문윤재;유호선;이재헌
    • 플랜트 저널
    • /
    • 제10권4호
    • /
    • pp.29-34
    • /
    • 2014
  • 본 연구에서는 배관설계항목을 조사하여 전문가 면담 및 설문을 통해 주요 설계항목을 도출하였고, 이를 국내외 사례 프로젝트에 적용하여 주요 배관설계 항목별 비중 및 비용변동 범위를 조사하였다. 조사결과를 바탕으로 몬테카를로 시뮬레이션을 활용하여 배관설계비 전체에 대한 비용변동 범위를 분석하여 유사 프로젝트 수행 시 입찰단계에서 합리적인 입찰금액 산정 및 입찰참여에 대한 타당성을 검토할 수 있는 방안을 제시하였다.

  • PDF

소프트웨어 비용-일정 타협을 위한 수정된 소프트웨어 공식 (Modified Software Equation for Software Cost-Schedule Tradeoff)

  • 이상운;최명복
    • 한국컴퓨터정보학회논문지
    • /
    • 제16권9호
    • /
    • pp.35-43
    • /
    • 2011
  • 하나의 소프트웨어를 개발하기 위해서는 개발조직의 생산성, 투입되는 노력, 개발일정, 소프트웨어 규모 간에 관계가 있다. 이들 관계를 유도한 식이 소프트웨어 공식이다. 소프트웨어 공식은 근본적으로 규모-노력, 규모-일정 관계가 적용되었다. 이 관계가 적절하지 않을 경우 소프트웨어 공식으로부터 유도되는 비용-일정 타협 공식, 투입인력 프로파일 등의 효용성이 없어진다. 본 논문에서는 이러한 문제점을 해결하고자 수정된 소프트웨어 공식을 유도하였으며, 수정된 소프트웨어 공식에 기반하여 소프트웨어 규모별로 비용-일정을 타협하는 모델들을 제안하였다. 소프트웨어 개발 성공률을 향상시키기 위해 제안된 모델을 적용하면 계약 협상이나 입찰에 도움이 될 것이다.

호퍼형 일관수송용기 도입 효과 (The Effect of Hopper-type Container for Through Transit)

  • 김경태;김영주;이석;권용장
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.263-268
    • /
    • 2011
  • There are many exclusive freight cars in railway freight transportation system. Gondola is one kind of freight cars. Gondolas have a role to carry bulk-type cargo such as coals and ores. A few problems are occurring due to exclusive freight cars. Operation company has redundant freight cars because exclusive freight cars can carry limited items. And purchasing cost of freight cars is higher and higher because of irregular bid. Operation efficiency of gondola is very low because return time of gondola is much longer than that of container car. In this study, we analysed the introduction effect of hopper-type container for through transit. First, we identified the characteristics of spatial distribution on freight stations. And we provided the effect of hopper-type container in terms of operation efficiency, cost reduction, new demand excavation and image enhancement of eco-friendly railroad.

  • PDF

국내 송전계통 및 송전제약 비용 분석 (The Analysis of The Domestic Transmission System and Transmission Congestion Price)

  • 백웅기;전영환;김정훈;곽노홍;송인준
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.737-739
    • /
    • 2004
  • The domestic power system established with Cost-Based-Pricing(CBP) from April 2001. The system is a uniform pricing system. System Operator(50) establishes a Price Setting Schedule by the prediction of consumption and the presented bid price(generation cost) of the generation utility. But the Price Setting Schedule doesn't take account of the constraint of the system. This cause a transmission congestion, constrained-on generation and constrained-off generation. This Paper search the way of the increasing efficiency of domestic power system through the redemption of congestion charge.

  • PDF

Stakeholders' Perception of the Causes and Effects of Construction Delays on Project Delivery

  • Akinsiku, Olusegun Emmanuel;Akinsulire, Akintunde
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권4호
    • /
    • pp.25-31
    • /
    • 2012
  • The growing rate of delays is adversely affecting the timely delivery of construction projects. This study therefore assesses construction stakeholders' perception of the causes of delays and its effects on project delivery in a bid to proffer solution in minimizing the occurrences of delays. Questionnaire was used to elicit responses from construction stakeholders; a total of thirty three causes of delays, seventeen resultant effects of delays and fifteen methods of minimizing construction delays were identified for the study based on literature reviews. The results suggest that client's cash flow related problems are the main causes of delays while time and cost overruns are the major identifiable effects of delays in construction projects. However, adequate project planning and budgeting were suggested as possible ways of minimizing the occurrences of delays.

QUANTITATIVE ANALYSIS ON PROJECT PERFORMANCE ANALYSIS AND DELIVERY METHODS

  • Seta Ohanesian;Jin-Lee Kim;Tang-Hung Nguyen;Ok-Kyue Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.332-337
    • /
    • 2013
  • Various project delivery methods have been utilized by owners over the years to maximize project performance. The design-build delivery method is being increasingly used due to the advantages it can offer to an engineering construction industry. Numerous studies have advocated the use of design/build over the traditional design/bid/build delivery approach. This study represents comprehensive analysis of 40 projects from the construction industry and shows that design/build method may not provide all the benefits to project performance. This study found timesaving was a definitive advantage of design/build project delivery, but the positive effects of cost changes was not convincing. Based on the results of the study, the project management expertise and experience of the contractor may have a greater impact on project performance outcomes than focusing on project delivery strategy only.

  • PDF

UR농산물개방에 따른 도.농 토지전용의 공간적 파급효과 (An Urbanization Effect of Ruralto-Urban Land Conversion Under the Uruguay Round Agricultural Free Trade Policy : The Case of Korea)

  • 최막중
    • 지역연구
    • /
    • 제11권1호
    • /
    • pp.61-78
    • /
    • 1995
  • This study begins with a question of what spatial impact international trade policy would have following the Uruguay Round, particularly focusing on agricultural trade liberalization in Korea. Based upon the neoclassical urban economic model, it first identifies the channel in which agricultural market opening can ultimately affect both rural and urban are as; $\circled1$ Free trade will depress domestic price of agricultural products, $\circled2$ which will in turn depreciate agricultural land price. $\circled3$ The decrease in marginal supply cost for urban land will then facilitate urban sprawl, provided that the government relaxes restrictions on urban-rural land conversion. Theoretical analysis is further refined by empirical considerations that distinguish agricultural land value solely for production purpose from that for future urban, uses, and that distinguish the urbanization effect caused by the fall in the supply cost of urban land from that caused by the existing high level of demand. Utilizing the estimate of bid-price for paddy field derived from the revenue-cost relationship of rice production, simulation results show that the urban-rural boundary under trade liberalization can expand outward up to 70-85km radius in the Seoul metropolitan area, suggesting the emergency of a metropolis or even a megalopolis which extends from Seoul to the central part of the country. Since the geographic extent of urbanization effect can vary depending upon the urban spatial structure, however, it is recommended that the redevelopment option in the built - up area should always be tied up with the issue of whether to deregulate rural-to-urban land conversion.

  • PDF

BIM기반 확률론적 GMP 산정방안에 관한 연구 (Probabilistic GMP Calculation Method based on BIM)

  • 고건호;김정훈;김현주;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.122-123
    • /
    • 2018
  • Recently, CM at Risk delivery system(CM@R) that could solve the problems of Design Bid Build delivery(DBB) system has been emerging. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the contractor carries out the construction within the GMP. In CM @ R, the construction company with expertise in construction participates from the design stage to reflects the construction know-how in the design. On the other hand, the modification design frequently occurs due to the change of the construction cost when negotiating the GMP. In addition, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. This study proposes a probabilistic GMP estimation method applying MCS to the BIM - based cost prediction model, in order to extract the accurate quantity information when estimating the GMP and to cope with the change of the construction cost inherent in uncertainty.

  • PDF