• Title/Summary/Keyword: Benefit/Cost

Search Result 1,567, Processing Time 0.03 seconds

Economic Analysis for Standardization R&D of Urban Rail System (도시철도 표준화 연구개발사업의 경제성 분석)

  • Chung, Choong-Sik
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1694-1714
    • /
    • 2007
  • This study is to estimate economic benefits of Standardization R&D of Urban Rail System. Benefit was to be realized through standardization of main areas such as train vehicle, railway, power system, and signal system. To derive and calculate the quantitative benefit, the sources of economic impact was divided into three dimensions -operational cost savings, import substitution, and safety effects. Economic effect of the standardization was categorized based on a modified BSC model. Economic benefits from time and labor savings are converted into cost savings. Import substitution and investment multiplier effect have a positive impact in addition to cost savings. The estimation of the standardization R&D of Urban Rail System was conservatively estimated 370 billion Won. Cost effectiveness of standardized safety system was conservatively translated into economic benefit in this analysis. This study provides a practical guide to economic evaluation of the various railway R&D projects.

  • PDF

The Study of Financing for Energy Efficiency Homes (주택 에너지효율향상을 위한 재정지원 방안에 관한 연구)

  • Park, Kihyun
    • KIEAE Journal
    • /
    • v.12 no.6
    • /
    • pp.63-68
    • /
    • 2012
  • The aim of this study is to evaluate current policies and suggest the way of overcome financial impediments to the energy efficiency function of residential buildings. Based on this analysis the paper enumerates policy recommendations for enhancing how energy efficiency is addressed in building codes and other policies for residential buildings. For achieving this goal, this study conducts the cost-benefit analysis to measure total energy savings and associated total cost. The results of study shows that the cost is greater than the benefit from 1st to 4th year but the benefit will be greater than the cost for the rest of the year. In addition, this study designs a financial support method and an implementation mechanism. Investment from the capital market will take place with the government's interest subsidy. Home retrofit will be undertaken with low interest rate with 2.5% and the return will be paid by a monthly energy bill. The results of this study provides some useful insights for the policy design, including the importance of developing information tools for providing appropriate information to households.

Benefit analysis model of the national map revision program using replacement cost method (대체비용법을 이용한 수치지형도 갱신사업의 편익분석 모형 연구)

  • Son, Hwamin;Yang, Sungchul;Ga, Chillo;Yu, Kiyun;Huh, Yong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.31 no.1
    • /
    • pp.79-87
    • /
    • 2013
  • This study proposed a method to analyze the economic benefit of the national map revision program using the replacement cost method. The replacement cost method measures the benefit of a project as the minimum cost to replace functions of the project with those of alternative goods or services in an existing market. Thus, the demands on 1/5,000 topographic map revision in 18 administrative tasks such as city and district management planning were surveyed in three local autonomous entities. Then the cost to alternatively fulfill the demands was estimated with the standard construction estimating system for the field surveying and surveying results in commercial GIS companies for the site investigation. With this cost estimation model, the benefit of the current national map revision program to the local autonomous entities was estimated as 265,960,999 won. And cost benefit ratios according to several revision frequencies from 0.5 to 4 year were also compared to find the optimal frequency.

A Study On Cost/Benefit Analysis in the Economic Evaluation of GSIS Implementation (GSIS 도입의 경제적 평가에 있어서 비용/효과 분석에 관한 연구)

  • Kim, Joo-Hwan;Yom, Jae-Hong;Sohn, Duk-Jae;Yeon, Sang-Ho
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.1 no.1 s.1
    • /
    • pp.217-225
    • /
    • 1993
  • The cost/benefit analysis method is frequently used in the feasibility study of investments on geo-spatial information system. The cost/benefit analysis method has been applied extensively in the feasibility study of conventional information systems and recently efforts has been made to apply this method to geo-spatial information systems as well. This study efforts were made to present a cost/benefit model suitable for Korean GSIS and this model was then applied to Facility Management. In establishment of the cost model, the items of various costs were defined and a survey was made to find the average unit cost of each item. For the benefit model, the benefits of implementing a geo-spatial information system is classified into tangible and intangible benefits and only th tangible benefits were further classified. The established cost/benefit model was then applied to a gas distribution company with more than 100 employees and more than 300,000 customers. A GSIS was designed and the cost its implementation was compared to the present manual method of operation.

  • PDF

A Study on Consumer Preference and Purchase Intention to Smart Phone : Focused on Perceived Cost and Expected Benefit (스마트폰에 대한 소비자선호도 및 구매의도에 관한 연구 : 지각된 비용과 기대혜택을 중심으로)

  • Han, Sung-Hee
    • Journal of Families and Better Life
    • /
    • v.29 no.2
    • /
    • pp.23-37
    • /
    • 2011
  • This study examined the preference and the purchase intention of male and female from 20s through 405 to smart phones. This study verified the differences between the groups according to the socio-demographic factors, the usage pattern of mobile phone, and the perceived cost and the expected benefit. The analysis of the relative influence of those relevant factors was followed. The summaries of this study are as follows; First, the high level factors in purchasing smart phones were the perceived cost and the expected benefit pointed over 3.82. It means that they arc interested in smart phones highly, and if they can support to buy smart phones and situations can be permitted, they would like to buy them. Second, the differences between groups of the preference and the purchase intention were found according to the ages, the marital status and the education level. The results showed that those preference and the purchase intension were measured high at the group of the 20s-30s, the married, and the higher educational level of collage students. Third, expected benefit on smart phones was shown to be divided into two characterized factors through factor analysis. One was 'functional expected benefit' and the other was 'emotional expected benefit'. The functional and the emotional benefit on the using of smart phones were presented high level in group of over graduated students. Forth, the results of the stepwise multiple analysis, which was carried out to find out the influencing factors on the preference and the purchasing intension to smart phones, showed that the most effective factor was the functional expected benefit. The self-expressive propensity, and the education level were followed sequentially. The purchase intention was influenced by both of the functional and the emotional expected benefit. The result of this study shows that the level of the consumer's perceived cost(economic, psychological) and the expected benefit were measured high at the same time. That means that it is necessary to make the consumer information and communicating smoothly in order to lower the cost and enhance the benefit. In addition, This study has its meaning because it found out that functional expected benefit is a factor which has an influence on the Consumer Preference and Purchase Intention on Smart phone. If consumer's function requirements on smart phone are satisfied, it will be able to reduce the consumer problems and increase the consumer satisfaction. The result of this study would be applicable when Smart Phone is used as one of the auxiliary tools for smart consumption.

A Study on Value of a Statistical Life and Cost-benefit Analysis about Hydrogen Bus Rollovers Safety Regulation (수소버스 전복 안전기준 도입에 따른 통계적 인명가치 및 비용편익효과 연구)

  • Lim, Seo Hyun;Jang, Jeong Ah;Hong, Sung Jin
    • Journal of Auto-vehicle Safety Association
    • /
    • v.13 no.3
    • /
    • pp.47-53
    • /
    • 2021
  • This study is a study to estimate the VSL (Value of a Statistical Life) and CBA (Cost-benefit analysis) of the rollover safety standard for hydrogen buses, VSL is an economic value concept used to quantify the benefits of avoiding death. CBA shows the effect of cost-benefit, and if B/C is greater than 1, there is a social effect. In order to estimate the VSL and CBA, the hydrogen bus introduction scenario was assumed to be optimistic (20,000 vehicles in 2030), neutral (15,000 vehicles in 2030), and pessimistic (10,000 vehicles in 2030), and the effect of reducing human casualties was estimated. As a result, except for the pessimistic market situation of introducing hydrogen buses (10,000 vehicles in 2030) and the VSL reduction ratio of 10%, all policies were judged to have high cost-benefit effects. These results indicate that the introduction of the rollover safety standard for hydrogen buses is a socially effective policy.

Economic Evaluation of IT Investments for Emergency Management : A Cost-centric Control Model

  • Kim, Tae-Ha;Lee, Young-Jai
    • Journal of Information Technology Applications and Management
    • /
    • v.15 no.3
    • /
    • pp.195-208
    • /
    • 2008
  • In an emergency management case, evaluating the economic value of information technology investments is a challenging problem due to the effects of decision making, uncertainty of disasters, and difficulty of measurements. Risk assessment and recovery process, one of the major functions in emergency management, consists of (1) measurement of damages or losses, (2) recovery planning, (3) reporting and approving budgets, (4) auctioning off recovery projects to constructors, and (5) construction for the recovery. Specifically and of our interest, measurement of damages or losses is often a costly and time-consuming process because the wide range of field surveys should be performed by a limited pool of trained agents. Managers, therefore, have to balance accuracy of the field survey against the total time to complete the survey. Using information technologies to support field survey and reporting has great potential to reduce errors and lowers the cost of the process. However, existing cost benefit analysis framework may be problematic to evaluate and justify the IT investment because the cost benefit analysis often include the long-run benefit of IT that is difficult to quantify and overlook the impact of managerial control upon the investment outcomes. Therefore, we present an alternative cost-centric control model that conservatively quantifies all cost savings to replace benefits in cost benefit analysis and incorporate the managerial control. The model provides a framework to examine how managerial decision making and uncertainty of disaster affect the economic value of IT investments. The current project in Emergency Agency in South Korea is introduced as a case to apply the cost-centric control model. Our work helps managers to better evaluate and justify IT-related investment alternatives in emergency management.

  • PDF

A Study on Building of Underpass for Small Vehicles by Benefit and Cost Analysis (편익과 비용 분석을 통한 소형차전용지하차도 도입에 관한 연구)

  • Lee, Young Woo
    • International Journal of Highway Engineering
    • /
    • v.15 no.2
    • /
    • pp.149-157
    • /
    • 2013
  • PURPOSES : This study is to analysis for benefit and construction cost in underpass for small vehicles. METHODS : The study was performed using the traffic software VISSIM 5.20 for analysis on a variety of traffic conditions and analysed of benefits of changes through analysis of travel speed and travel time after modeling of existing underpass and small vehicle underpass. RESULTS : Results of this study, the benefits will be reduced by the introduction underpass for small vehicles were analyzed because heavy vehicles use the intersection above the underpass. However, it was required economic analysis considering both the benefits reduction and the construction costs reduction because it has the effect of reducing the construction cost. Showed that the difference in benefit changes depending on the v/c and heavy vehicles ratio and construction cost was difference by types of underpass. As a result of performing economic analysis with total benefits and construction cost, it was analyzed to be economical in underpass over a certain size. CONCLUSIONS : The result of this study are expected to be able to contribute to reviewing for feasibility due to the small vehicles underpass introduction and economic analysis. The study is case study to the underpass in Daegu. Therefore, the future requires the calculation of benefits reflect a wider range of traffic conditions and the economic analysis to construction cost calculation for various types of grad separation facilities.

A Study on the Economic Effectiveness of the Artificial Fish Reef Project in the Tae-an Marine Ranching (태안시범바다목장해역내 인공어초사업의 경제적 효과에 대한 연구)

  • Choi, Jong-Du
    • The Journal of Fisheries Business Administration
    • /
    • v.44 no.3
    • /
    • pp.103-109
    • /
    • 2013
  • This paper analyzed that the economic effectiveness of the artificial fish reef project in the Tae-an Marine Ranching. Benefit-cost(B/C) model used to indicate the effects of economic valuation. B/C model is based on the sub-models which are Benefit Cost Ratio(BCR), Net Present Value(NPV) and Internal Ration of Return(IRR). First, the Sum of Incremental Benefit and Cost for total vessel by year in Artificial Fish Reef Area(AFRA) estimated 2,381 million won. And then, using 5.5% discounting rates and the survey data, the sub-models showed economically feasible in the all of analysis and analyzed the results as follows. BCR is 2.66, NPV is 28,014million won, and IRR is 22.78%. In conclusion, these results indicated that the artificial fish reef project in Tae-an Marine Ranching would be increase the income of fishermen as well as fish biomass.

A Study on Analysis of Effectiveness of Incentive by Green Building Certification Criteria (친환경 건축물 인센티브 제도의 실효성 분석에 관한 기초연구)

  • Kwon, Kyong-Soo;Lee, Suk-Won;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.119-120
    • /
    • 2012
  • The government has offered incentives to encourage private companies that are to meet the Green Building Certification Criteria. Despite offering these incentives, the Green Building Certification Criteria record share of newly-built building in 2010 is 0.35%, very low. Effectiveness of Green Building Incentive applied by the Green Building Certification Criteria is questioned. So we attempts to analysis about effectiveness of Green Building by using Cost-Benefit Analysis. But if we want to use CBA, we need to draw cost, benefit factors that compose the incentive. So in this study, for applying CBA, we analysis cost, benefit factors.

  • PDF