• 제목/요약/키워드: Bench face angle

검색결과 4건 처리시간 0.018초

절리가 심하게 발달된 암반사면의 최적 절취각 고찰 (A Study fo rthe determination of optimum cutangle for the heavily jointed rock slope)

  • 홍예성;조태진;한공창
    • 터널과지하공간
    • /
    • 제6권2호
    • /
    • pp.166-174
    • /
    • 1996
  • Stability of rock slope is greatly affected by the geometry and strength of discontinuities developed in the rock mass. In this study an analytical method which is capable of analyzing the effect of relative orientation between the discontinuities and the slope face on the safety of slope by assessing their vector components was used to evaluate the stability and the maximum cut-angle for the proposed slope design. The results of computerized vector analysis revealed that slope area under investigation might be divided into 3 sections of different face directions. The safety factors for benches in each 3 sections were calculated using the limit-equilibrium theory. Then, by utilizing the concept of probabilistic risk analysis, the susceptibility of entire slope failure was estimated. Based on the distribution of safety factor in each bench, the maximum cut angle of each section could be selected differently ot achieve the permanent stability of the entire slope.

  • PDF

노천광산에서의 사면 최적화를 위한 공학적 접근 및 최신 동향 (Engineering Approaches and Recent Advances of Slope Optimization in Surface Mines)

  • 박준혁
    • 화약ㆍ발파
    • /
    • 제39권3호
    • /
    • pp.35-43
    • /
    • 2021
  • 사면의 최적화(slope optimization)는 오픈핏(open pit) 노천광산에서 사면의 경사를 높여 추가적인 광석을 채굴하고 최대한의 이익을 얻는 것이 그 목적이다. 대형 노천 광산들은 선진화된 기술을 도입하여 사면의 안정성을 확보할 수 있는 수준에서 광산의 사면을 높이려는 노력을 하고 있다. 본 기술보고에서는 사면 최적화의 동향과 실제 광산의 사례들을 소개하고자 한다.

정밀발파의 표준화(下) (Standardization of Cautious blasting)

  • 허진
    • 기술사
    • /
    • 제23권6호
    • /
    • pp.41-46
    • /
    • 1990
  • First of all, Under given condition such as bit gage of 36mm Drill bit with right class of jack-logs experimental test carried out from two face of Bench, firing of each hole brought 90 degree Angle face and them measured length of Burden and charged ammount of powder as following. (equation omitted) A=Activated Area A=ndi=m S=Peripheral length of Charged. room Ca=Rock Coeffiecency d : di=Hole diameter When constructed subway of Seoul in 1980 the blasting works increased complaint of ground vibration. in order to prevent the damage to structures. Some empirical equations were made as follows on condition with Jackleg Drill (Bit Gage ø 36mm) and within 30 meter distance between blasting site and structures. V=K(D / W)$\^$-n/ N=1.60-1.78 K=48-138 Project one of contineous works to above a determination of empirical equation on the cautious blasting vibration with Crawler Drill(ø 70-75mm) in long distance. V=41(equation omitted) V=124(equation omitted).

  • PDF

정밀발파의 표준화 (Standardization of Cautious blasting)

  • 허진
    • 화약ㆍ발파
    • /
    • 제8권3호
    • /
    • pp.3-13
    • /
    • 1990
  • First ot of all, under given condition such as bit gage of 36mm Drill bit with right class of jack-leg-experimental test carried out from two face of Bench, firing of each hole brought 90 degree Angle face and them measured length of Burden and charged ammount of powder as following. $ca=\frac{A}{SW}$ A=Activated Area A=nd i=m S=Peripheral length of charged, room Ca=Rock Coeffiecency d: di=Hole diameter When constructed subway of Seoul in 1980 the blasting works increased complaint of ground vibration, in order to prevent the damage to structures. Some empirical equations were made as follows on condition with Jackleg Drill (Bit Gage 36mm) and within 30 meter distance between blasting site and structures. $V=K(D/W)^{-n}$ N=1.60 - 1.78 K= 48 - 138 Project is one of contineous works to above a determination of empirical equation on the cautious blasting vibration with Crawler Drill (70-75mm) in long distance. $V=41(D/\sqrt[3]{W})^{-1.41}$ $30m\le{D}\le{100m}$ $V=124(D/\sqrt[3]{W})^{-1.66}$ $100m\le{D}\le{285m}$.

  • PDF