• Title/Summary/Keyword: Behavior of ground and tunnel

Search Result 288, Processing Time 0.031 seconds

Study on seismic behavior and seismic design methods in transverse direction of shield tunnels

  • He, Chuan;Koizumi, Atsushi
    • Structural Engineering and Mechanics
    • /
    • 제11권6호
    • /
    • pp.651-662
    • /
    • 2001
  • In order to investigate the seismic behavior and seismic design methods in the transverse direction of a shield tunnel, a series of model shaking table tests and a two-dimensional finite element dynamic analysis on the tests are carried out. Two kinds of static analytical methods based on ground-tunnel composite finite element model and beam-spring element model are proposed, and the validity of the static analyses is verified by model shaking table tests. The investigation concerns the dynamic response behavior of a tunnel and the ground, the interaction between the tunnel and ground, and an evaluation of different seismic design methods. Results of the investigation indicate that the shield tunnel follows the surrounding ground in displacement and dynamic characteristics in the transverse direction; also, the static analytical methods proposed by the authors can be used directly as the seismic design methods in the transverse direction of a shield tunnel.

지반응답곡선을 이용한 지반과 지보재의 상호작용 분석 (Analysis on interaction of Ground and support using Ground response curve for tunnel design)

  • 안태훈;안성학;이송
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(II)
    • /
    • pp.1059-1064
    • /
    • 2002
  • The behavior of an opening and the performance of support system depend upon the load-deformation characteristics of ground and support as well as of the manner and of timing of support installation. The load-deformation characteristics of ground and support are derived by the interaction between ground and support. The interaction between ground and support is qualitatively illustrated by a ground response curve. The behavior of an opening and the performance of support system depend upon the load-deformation characteristics of ground and support as well as of the manner and of timing of support installation. The interaction between ground and support is qualitatively illustrated by a ground response curve. The convergence-confinement method don't need the basic assumptions for a mathematical model. Also This is applicable to general tunnel. Consequently the stability of tunnel must be qualitatively investigated by a ground response curve and quantitatively adjudged by a numerical analysis for the reasonable design of tunnel.

  • PDF

Preliminary study on the ground behavior at shore connection of submerged floating tunnel using numerical analysis

  • Kang, Seok-Jun;Kim, Jung-Tae;Cho, Gye-Chun
    • Geomechanics and Engineering
    • /
    • 제21권2호
    • /
    • pp.133-142
    • /
    • 2020
  • Submerged floating tunnel (SFT) is a type of tunnel which causes the tunnel segments to float in the water. When the SFTs are connected to the ground, the connection between the SFT and the subsea bored tunnel is fragile due to the difference in behavioral characteristics between the two types of tunnels. Therefore, special design and construction methods are needed to ensure the stability of the area around the connection. However, since previous research on the stability of the connection site has not been undertaken enough, the basic step necessitates the evaluation of ground behavior at the shore connection. In this study, the numerical analysis targeting the shore connection between the subsea bored tunnel and the SFT was simulated. The strain concentration at the shore connection was analyzed by numerical simulation and the effects of several factors were examined. The results showed the instability in the ground close to the shore connection due to the imbalance in the behavior of the two types of tunnels; the location of the strain concentration varies with different environmental and structural conditions. It is expected that the results from this study can be utilized in future studies to determine weak points in the shore connection between the submerged floating tunnel and the subsea bored tunnel, and devise methods to mitigate the risks.

침투수력을 고려한 전면접착형 록볼트의 거동연구 (Behavior of Grouted Bolts in Consideration of Seepage Forces)

  • 이인모;김경화;신종호;박종관
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.1259-1266
    • /
    • 2005
  • In a NATM tunnel, fully grouted bolts are widely used as part of supporting system. Grouted bolts play an important role not as to take some parts of load acting on a tunnel lining but as to reinforce the ground adjacent the tunnel. In conjunction with tunnel construction, the presence of groundwater may pose a number of difficulties. With respect to tunnel design, influences of groundwater on tunnel behavior have been considered in many aspects. However, the effect on grouted bolts has been rarely investigated. In this study, the behavior of grouted bolts, which are affected by the seepage forces, was examined. To investigate the effects of seepage forces, the theoretical solutions for a drained condition were also found. Based on the theoretical solutions, ground reaction curves considering seepage forces were obtained. By comparing the ground reaction curves supported by grouted bolts with those for the unsupported cases, the effect of reinforcement was evaluated. Finally, through comparison between supported ground reaction curves in the drained condition and those in the case of groundwater flow, it was found that the grouted bolts are more structurely beneficial when the seepage occurs towards the tunnel than when there is no groundwater flow.

  • PDF

Effect of construction sequence on three-arch tunnel behavior-Numerical investigation

  • Yoo, C.;Choi, J.
    • Geomechanics and Engineering
    • /
    • 제15권3호
    • /
    • pp.911-917
    • /
    • 2018
  • This paper concerns a numerical investigation on the effect of construction sequence on three-arch (3-Arch) tunnel behavior. A three-arch tunnel section adopted in a railway tunnel construction site was considered in this study. A calibrated 3D finite element model was used to conduct a parametric study on a variety of construction scenarios. The results of analyses were examined in terms of tunnel and ground surface settlements, shotcrete lining stresses, loads and stresses developed in center column in relation to the tunnel construction sequence. In particular, the effect of the side tunnel construction sequence on the structural performance of the center structure was fully examined. The results indicated that the load, thus stress, in the center structure can be smaller when excavating two side tunnels from opposite direction than excavating in the same direction. Also revealed was that no face lagging distance between the two side tunnels impose less ground load to the center structure. Fundamental governing mechanism of three-arch tunnel behavior is also discussed based on the results.

변형률 연화모델과 현장계측을 이용한 저토피 NATM터널의 변형해석 (Deformation Analysis of a Shallow NATM Tunnel using Strain Softening Model and Field Measurement)

  • 이재호;김영수;문홍득;김대만;김광일
    • 한국지반환경공학회 논문집
    • /
    • 제8권6호
    • /
    • pp.29-36
    • /
    • 2007
  • 지표면 침하량, 침하 기울기 그리고 터널주변의 지반변위에 대한 관리와 예측은 도심지 터널 시공에 있어서 주요한 인자가 된다. 본 논문은 도심지 NATM터널의 변형거동에 대한 세밀한 분석을 위하여 사례분석과 수치해석적인 방법을 통하여 굴착에 따른 지반 평가와 거동 예측을 수행하였다. 수치해석적인 방법은 FLAC-2D 변형률 연화모델과 탄소성모델을 이용하였다. 현장계측은 지표면 침하와 지중변위를 수행하였으며, 계측결과는 시공중 설계물성치의 재설정에 이용되어졌다.

  • PDF

병렬 쉴드터널의 이격거리와 적용사례 (Distance between the Parallel Shield tunnel and Application)

  • 곽철홍;김재영;김동현;이두화;이승복;김응태;심재범
    • 한국터널공학회:학술대회논문집
    • /
    • 한국터널공학회 2005년도 학술발표회 논문집
    • /
    • pp.225-232
    • /
    • 2005
  • The construction of parallel tunnel by using the shield TBM method was increased recently. Accordingly the application and the propriety of the parallel shield TBM tunnels were studied through domestic and foreign construction cases herein. Also the behavior of tunnel structure and ground was evaluated by a numerical analysis with various ground conditions and the distance between the parallel tunnels. As a result, it was concluded that a deep investigation as well as a ground reinforcement was required with a ratio(L/D) of the distance between the parallel tunnels(L) to tunnel outer diameter(D) less than 0.5 because the Interference phenomenon was expected to occur. And the appropriateness of the application method of parallel shield TBM tunnel was validated through the 2-dimensional numerical analysis simulated the process of excavation after the ground reinforcement in the starting area of the OOO construction site with the ratio(L/D) of 0.35.

  • PDF

미고결 저토피 터널에 작용하는 토압에 관한 연구 (Tunnel Pressure acting on Shallow Tunnel in Unconsolidated Ground)

  • 이재호;아쿠타가와 신니치;김영수;문홍득
    • 터널과지하공간
    • /
    • 제17권6호
    • /
    • pp.453-463
    • /
    • 2007
  • Terzaghi터널토압 이론은 shield 및 도심 NATM터널의 설계토압으로 현재까지도 사용되고 있다. 본 논문에서 지반의 변형거동과 한계상태를 가정한 Terzaghi 토압과의 상호 관계에 관한 조사를 위해 Terzaghi 터널토압이론, 2차원 실내 터널 모형 실험과 변형률 연화모델을 기본으로한 비선형 수치해석을 실시하였다. 굴착에 따른 터널 토압와 지반 변형거동의 폭넓은 이해와 그들의 상호작용에 대한 효율적인 활용은 경제적인 터널 지보설계와 안정한 시공을 이끌 수 있다.

근접한 흙막이벽체에 가하는 선행하중의 영향을 받는 상재하중 재하 터널의 안정 (Stability of A Surcharged Tunnel under the Effect of Pre-Loading on the Adjacent Braced Wall)

  • 김일;이상덕
    • 한국재난정보학회 논문집
    • /
    • 제4권2호
    • /
    • pp.10-27
    • /
    • 2008
  • When the ground is excavated adjacent to the existing tunnel, which is loaded by the surcharge on the ground surface, the tunnel stability would be very sensitive to the deformation of the ground induced by the horizontal displacement of braced wall. The stability of the existing surcharged tunnel could be controlled by pre-loading on the braced wall. In this paper, it was investigated, if it would be possible to keep the existing surcharged tunnel stable by preventing the horizontal displacement of a braced wall by imposing the pre-loading during the ground excavation. For this purpose, large scale model tests were performed in a scale 1/10 at the test pit which was 2.0m in width and 6.0m in height and 4.0m in length. Isotropic test ground was constructed homogeneously by wet sand. Model tunnel was constructed in the test ground. Surcharge was loaded on the ground surface above the tunnel. During the tests, the behavior of model tunnel and model braced wall was measured. Numerical analyses were also performed in the same condition as the tests. And their results were compared to that of the model tests. Consequently, the effect of a surcharge could be compensated by imposing the pre-loading on the braced wall. The existing tunnel and the braced wall could be kept stable by preventing the horizontal displacement of the braced wall through pre-loading, although the tunnel is surcharged.

  • PDF

근접굴착 시 기존건물의 영향을 받는 터널의 거동 (Behavior of the tunnel under the influence of a existing building during the adjacent ground excavation)

  • 이종민
    • 한국터널지하공간학회 논문집
    • /
    • 제20권3호
    • /
    • pp.609-623
    • /
    • 2018
  • 건물하중의 영향을 받는 상태의 기존터널에 근접해서 터널보다 깊은 심도로 지반을 굴착하는 경우에 흙막이벽체의 거동이 기존터널의 존재로 인해 큰 영향을 받는 것으로 알려져 있다. 그런데 지상 구조물에 의해 받는 영향에 대한 연구 예가 많지 않다. 따라서 본 연구에서는 기존터널에 근접하여 지반을 굴착할 때 기존터널이 상부구조의 영향을 받는 상태에서 건물 위치에 따른 터널의 거동을 대형모형실험과 수치해석을 실시하여 측정하였다. 이를 위해 지표면에 건물하중이 없는 경우와 건물하중이 3가지 이격거리에 위치한 경우(0 m, 1D, 2D)에 대하여 각각 대형모형실험을 수행하였다. 본 논문에서는 흙막이벽체와 기존구조물의 영향을 받고 있는 터널의 거동에 대하여 연구하였다. 1 : 10의 축척으로 2.0 m (폭)${\times}$6 m (높이)${\times}$4.0 m (길이)의 크기를 가진 대형토조에서 실험을 수행하였다. 그 결과 흙막이벽체 배면에 있는 인접터널의 안정성은 근접굴착에 의해 뚜렷하게 영향을 받는 것으로 나타냈다.