• Title/Summary/Keyword: Bed excavation

Search Result 28, Processing Time 0.031 seconds

Study on the Memorial Structure(齋室) in Front of Jeongreung Royal Tomb(貞陵) in Seoul (서울 정릉(貞陵) 재실(齋室)에 대한 소고)

  • Choi, Deuk-Joon
    • Journal of architectural history
    • /
    • v.22 no.2
    • /
    • pp.21-30
    • /
    • 2013
  • This study is related to excavation from ruins the memorial structure within the Jeongreung royal tomb. There are experimental assertion on the basis of results of the excavation, historical records. The location of the memorial structure is identified in picture of Sunwonbogam(선원보감), records of Chunkwantongho(春官通考). The memorial structure have 6 rooms where lay in 250 steps(步) from the south of Hongjeonmun gate, lotus pond lay in southeast of the structure recorded on Chunkwantongho that's guide book to manners. It's matched in the location as result of excavation. The building site consists of main house(윗채), outhouse(아래채) that's stationed in stepped. It seems that main house as the memorial structure have 6 rooms. It's used as outhouse for facilities attached to the main. It's characterized the memorial structure within the Jeongreung royal tomb that's stationed main house, outhouse in stepped it using natural ground. It's estimated that it's tried to conservation for building site, fence etc. in next several time. With regard to constructing time of the structure, traces involved to first construction is simple: 2 chimneys in flower bed, fence, a part of stone elevation, drains by using rectangular stone. It shows that the building site had been reconstructed or renovated during Gho-jong King 37s year of the Choson dynasty(A.D.1900). It seems that the memorial structure during approximately 300 years in existence from Hyeon-jong King 10s year of the Choson dynasty(A.D.1669) to the late 1960s.

A Study on the Behavior of Concrete floors with Over-break in Railroad Tunnel (여굴깊이에 따른 철도터널 바닥 콘크리트의 거동에 관한 연구)

  • Yang, Joo-Kyoung;Kim, Hyo-Jung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.5
    • /
    • pp.101-107
    • /
    • 2017
  • Over-break, which is excavated larger than planned line at tunnel excavation, is inevitable due to the nature of blasting. But regarding the bottom of the foundation, most of the domestic ordering organizations pay only 10 cm thick filled concrete when pouring concrete due to over-break. In accordance, the construction cost will increase greatly if all the depths of the designed over-break are filled only with concrete. When tunnel excavation occurs, concrete filling of 18 MPa(T = 100 mm) and 150 mm~237 mm auxiliary concrete layer and 240 mm concrete track(TCL) are applied to the upper part. The concrete is installed in an excessive amount of about 600 mm between the lower part of the rail and the tunnel rock bed. Therefore, in this study, it is necessary to analyze the concrete crack structure according to the depth of the existing tunnel and the modified tunnel section, and to evaluate the adequacy of the required thickness of the tunnel floor concrete for securing the crack stability of the concrete.

Evaluation on Damage Effect of Concrete Track induced by Underground Structure Displacement Behavior (지하구조물 변위거동에 따른 콘크리트궤도의 손상영향 분석)

  • Jung-Youl Choi
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.3
    • /
    • pp.839-844
    • /
    • 2024
  • This study analytically analyzed the impact of underground structure displacement behavior on track damage due to adjacent excavation work, ground deterioration, and changes in groundwater level. The concrete track that was the subject of the study was analyzed for sleeper floating track(STEDEF) and precast concrete slab track(B2S). Sleeper floating track is a track structure in which the concrete bed and sleepers are voided. precast concrete slab track is a track structure that induces the elastic behavior of the rail by assembling rails and fasteners using slabs. For numerical analysis, each concrete track, from rail to concrete bed, was modeled as three-dimensional elements. In addition, the displacement behavior of the underground structure was set as a variable to analyze the damage effect on the concrete bed. Using numerical analysis, the concrete bed stress due to uplift and subsidence was analyzed, and the level of crack effect was analyzed by comparing it to the tensile strength and shear strength. As a result of the analysis, it was found that the sleeper floating track was more vulnerable than the precast concrete slab track when the same uplift and subsidence occurred. In addition, uplift and subsidence, it was analyzed that the cracks range in the sleeper floating track was large.

The conservation of the ancient ships salvaged in North Europe-Especially on the Conservation of the Viking ships - Especially on the Conservation of the Viking ships in Denmark (북유럽 인양목선의 보존처리-덴마아크 Viking선을 중심으로)

  • Bae, Byong-Whan
    • 보존과학연구
    • /
    • s.7
    • /
    • pp.278-291
    • /
    • 1986
  • In this report the practical case of Viking ship's conservation in Denmarke specially among the Eurpoean nations is introduced. The contents of it are summarized as follows :From 1957 to 1962 the Danish National Museum Salvaged five Viking ships from the bottom of Roskilde Fjord, Which were composed of the pieces of timber whose surface was soft because they had lain on the sea bed for about a thousand years. Excavation had been carried out in the same way as in the field by driving down a sheet piling around the wrecks and pumping the water out. These pieces of the wreck ships were packed in airtight plastic bags one by one to be transported for Brede and then immidiately had to go through the treatment for conservation. The conservation treatment process for the pieces includes three steps ; the preliminary process prior to the hardening treatment, the hardening and the assemble of the ships. In the first step ; the preliminary process, all remains of mud and shells from the fjord bed are washed off, and measuring followed ; every single piece of wreckage was drawn so that the form and size of the piece, nail holes, and breaks were registered before conservation. In the second ; the hardening treatment step, the pieces of the woreckage were filled with P.E.G. This Polyethylene Glycol method was the best to handle in the subsequent mounting of the ships in the museum. In the final, the Glycol-treated pieces were pieced together to spips with support of a system of reinforcements. They were to fit in place after corrections of the form were made several times.

  • PDF

Development of Improved Rock Bolt for Reinforcement of Fracture Zone in Slope and Tunnel (사면 및 터널에서의 암반 파쇄대 보강을 위한 개량형 록볼트 개발)

  • Kim, Soo-Lo;Kim, Jong-Tae;Park, Seong-Cheol;Kim, Tae-Heok;Kwon, Hyun-Ho;Jeong, Gyo-Cheol
    • The Journal of Engineering Geology
    • /
    • v.20 no.1
    • /
    • pp.101-109
    • /
    • 2010
  • There are many slopes generally developed by excavation and cut slope with small steps on massive slopes of roads. Especially these cut slopes which excavating around fault fracture zone need a reinforcement technology in order to ensure safety. In the case of slope excavation, it is difficult to use the existing slope support at fracture zone because of geological characteristics. Especially the factor of safety decreases significantly due to the movement of blocks in bed rocks and the expansion of interspace of discontinuous planes in fractured zones caused by excavation. Thus an efficient reinforcement technique in accordance with geological properties of fracture zones needs to be developed because the existing slope support has a restricted application. Therefore it is necessary to develop the specialized rock bolt technique in order to ensure an efficient factor of safety for anomalous fracture zones in slopes and tunnels. The purpose of this study is to develop newly improved rock bolt to increase a supporting effect of the swellex bolt method used recently as a friction type in fracture zones.

Evaluation on Disturbance and Adjustment of Close-to-Nature River Improvement for Creek (소하천의 자연형하천 정비사업에 따른 교란 및 적응 평가)

  • Kim, Kiheung;Lee, Hyeongrae
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.10 no.3
    • /
    • pp.71-87
    • /
    • 2007
  • In order to improve and manage rationally for Youngdam creek in Haman-gun, the channel change, water quality and ecological adaptation etc. were evaluated by monitoring during three years. The distinct differences of channel characteristics appeared in the extents of bed excavation and the revetment methods because overall reconstruction was occurred intense disturbance of width expansion and levee construction etc. The scour and deposition were caused according to channel characteristics of ripple and pool, and the adaptation of vegetation was distinguished from each revetment methods clearly. Water quality was maintained first class on the basis of BOD as 0.5~1.5mg/${\ell}$. The vegetation appeared in 380 species close-to-nature river improvement before, but 64 species it after one year, 159 species it after two year and 158 species it after three year. The animal life appeared in 123 species of close-to-nature river improvement before, but 103 species it after one year, 116 species it after two year and 119 species it after three year.

Hydraulic behavior of a subsea tunnel in a ground with fractured-zones (파쇄대를 통과하는 해저터널의 수리거동에 관한 연구)

  • Shin, Jong-Ho;Choi, Kyu-Cheol
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1571-1580
    • /
    • 2008
  • Subsea tunnels that link land to island and among nations for transportation, efficient development of limited surface and pursuit of economic development should be designed to support pore water pressure on the lining. It is generally constructed in the bed rock of the sea bottom. When the tunnel excavation face meets fractured-zones below sea bottom, collapse may occur due to an increase of pore water pressure and large inflow. Such an example can be found in the Norwegian subsea tunnel experiences in 1980's. In this study hydraulic behavior of tunnel heading is investigated using numerical method based on the collapse of Norwegian subsea tunnel. The effect of pore water pressure and inflow rate were mainly concerned. Horse-shoe shaped model tunnel which has 50 m depth from the sea bottom is considered. To evaluate hydraulic performance, parametric study was carried out for varying relative permeability. It is revealed that pore water pressure has increased with an increase of sea depth. Especially, at the fractured-zone, pore water pressure on the lining has increased significantly. Inflow rate into tunnel has also increased correspondingly with an increase in sea depth. S-shaped characteristic relation between relative permeability and normalized pore water pressure was obtained.

  • PDF

Assessment of the swelling potential of Baghmisheh marls in Tabriz, Iran

  • Asghari-Kaljahi, Ebrahim;Barzegari, Ghodrat;Jalali-Milani, Shahrokh
    • Geomechanics and Engineering
    • /
    • v.18 no.3
    • /
    • pp.267-275
    • /
    • 2019
  • Tabriz is a large Iranian city and the capital of the East Azerbaijan province. The bed rock of this city is mainly consisted of marl layers. Marl layers have some outcrops in the northern and eastern parts of city that mainly belong to the Baghmisheh formation. Based on their colors, these marls are classified into three types: yellow, green, and gray marls. The city is developing toward its eastern side wherein various civil projects are under construction including tunnels, underground excavation, and high-rise building. In this regard, the swelling behavior assessment of these marls is of critical importance. Also, in lightweight structures with foundation pressure less than swelling pressure, several problems such as walls cracking and jamming of door and windows may occur. In the present study, physical properties and swelling behavior of Baghmisheh marls are investigated. According to the X-ray diffractometer (XRD) results, the marls are mainly composed of Illite, Kaolinite, Montmorillonite, and Chloride minerals. Type and content of clay minerals and initial void ratio have a decisive role in swelling behavior of these marls. The swelling potential of these marls was investigated using one-dimensional odometer apparatus under stress level up to 10 kPa. The results showed that yellow marls have high swelling potential and expansibility compared to the other marls. In addition, green and gray marls showed intermediate and low swelling potential and swelling pressure, respectively.

Studies on Partial Revegetation of Rock Cut-Slope by Direct Seeding of Woody Species Seeds (수목종자 직파에 의한 암반절개사면 부분녹화)

  • Hong, Sung-Gak;Kim, Jong-Jin;Lee, Duck-Soo;Lee, Ki-Cheol;Yoon, Teok-Seong
    • Korean Journal of Environmental Agriculture
    • /
    • v.18 no.3
    • /
    • pp.265-271
    • /
    • 1999
  • The direct seeding of seeds or the pellets of three native tree species (Pinus densiflora, Parthenocissus tricuspidata and Rhus chinensis) was tried on the rock cut-slope revegetation bed established by construction of mechanical excavation or erosion break with artificially enriched soil medium. The seed $pellet(1{\sim}2\;cubic\;cm)$ made by coating seeds(treated with proper previous pregermination treatments) with the mixture of peatmoss, clay, chemical absorbant(3.5:1.0:0.2, v/v) showed about twice better percent germination than the control seeds. The percent germination and the survival rate of the germinated seedlings were higher in the spring direct seeding than the summer or the fall. The soil medium containing the compost showed extremely low percent $germination(0{\sim}3%)$ which presumably attributed to the compost inducing damping-off disease. The survival rates were affected mainly by shading of natural herbaceous vegetation invading from outside to the revegetation bed. The planting of two year old container seedlings of P. densiflora and P. tricuspidata on August 2, 1998 was successful indicating that it could be an alternative revegetation method in case the summer direct seeding is unfavorable.

  • PDF

A preliminary numerical analysis on the behaviour of tunnel under construction in fracture zone considering seismic load (지진 하중을 고려한 단층파쇄대에서의 시공 중 터널 거동 분석에 관한 수치해석적 연구)

  • Oh, Dong-Wook;Hong, Soon-Kyo;Kim, Dae-Kon;Lee, Yong-Joo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.2
    • /
    • pp.279-299
    • /
    • 2019
  • Recently occurred earthquake Gyeongju and Pohang served as a momentum to remind that Korean peninsular is not a safety zone from earthquake anymore. The importance of seismic design, therefore, have been realized and researches regarding design response spectrum have been actively carried out by many researchers and engineers. Current tunnel seismic design method is conducted to check safety of tunnel structure by dynamic numerical analysis with condition of completed lining installation, so, it is impossible to consider safety of tunnel behavior under construction. In this study, therefore, dynamic numerical analysis considering seismic wave propagations has been performed after back analysis using results from field monitoring of tunnel under construction in fractured zone and 1st reinforcement (shotcrete, rockbolt) behaviour are analyzed. Waves are classified by period characteristic (short and long). As a result, the difference depending on period characteristic is minor, and increasements of displacement are obtained at crown displacement due to seismic wave is 28~31%, 14~16% at left side of tunnel in the fractured zone, 13~27% at right side of tunnel in the bed rock, respectively. In case of shotcrete axial force is increased 113~115% at tunnel crown, 102% at left side, 106~110% at right side, respectively. Displacement and axial force of rockbolts which are selected by type of anchored grounds (only fractured zone, fractured zone and bed rock, only bedrock) are analyzed, as a result, rockbolt which is anchored to fractured zone and bed rock at the same time are weaker than any other case.