The urbanization and increasing rate of population demands effective means of transportation system (basement and tunnels) as well as high-rise building (resting on piled foundation) for accommodation. Therefore, it unavoidable to construct basements (i.e., excavation) nearby piled foundation. Since the basement excavation inevitably induces soil movement and stress changes in the ground, it may cause differential settlements to nearby piled raft foundation. To understand settlement and load transfer mechanism in the piled raft due to excavation-induced stress release, numerical parametric studies are carried out in this study. The effects of excavation depths (i.e., formation level) relative to piled raft were investigated by simulating the excavation near the pile shaft (i.e., He/Lp=0.67), next to (He/Lp=1.00) and below the pile toe (He/Lp=1.33). In addition, effects of sand density and raft fixity condition were investigated. The computed results have revealed that the induced settlement, tilting, pile lateral movement and load transfer mechanism in the piled raft depends upon the embedded depth of the diaphragm wall. Additional settlement of the piled raft due to excavation can be account for apparent loss of load carrying capacity of the piled raft (ALPC). The highest apparent loss of piled raft capacity ALPC (on the account of induced piled raft settlement) of 50% was calculated in in case of He/Lp = 1.33. Furthermore, the induced settlement decreased with increasing the relative density from 30% to 90%. On the contrary, the tilting of the raft increases in denser ground. The larger bending moment and lateral force was induced at the piled heads in fixed and pinned raft condition.
건축 구조물 붕괴 사고가 발생했을 때, 건물 내에 있는 사람들의 긴급구호를 위해 가장 먼저 해야 할 일은 인명이 매몰되어 있는 위치(이하 매몰 공동이라 칭함)를 찾는 일이다. 그러나 붕괴된 건물의 잔해물 내에 위치한 매몰 공동을 일반적인 탐색 방법으로 찾는 것은 불가능하다. 이에 대한 해결방법으로 본 연구에서는, 붕괴시뮬레이션을 통하여 건축 구조물 붕괴 시 지하층에 형성되는 매몰 공동을 평가하였다. 붕괴 시뮬레이션에 사용되는 매몰 공동 유형에 영향을 미치는 인자로는 건축 구조물 층고, 내부 벽체의 유/무로 설정하였다. 시뮬레이션 결과, 지하벽체가 없고 고층 건물일수록 동일한 지진하중에서 큰 면적으로 붕괴가 발생하여 매몰 공동 형성에 불리한 것으로 나타났다. 또한, 매몰 공동이 형성될 경우 건물 외벽 부근이나 코너 부분에 형성될 가능성이 높은 것으로 나타났다.
LH공사는 기초설계 시 지반의 종류와 벽식공동주택의 층수에 따라 획일화된 PHC말뚝을 적용하고 있다. 최근 LH공사의 사업여건이 다양화됨에 따라 30층 이상의 벽식공동주택의 건설이 예상되고, 건설사업의 경쟁력 제고의 일환으로 건설공사비 절감이 지속적으로 요구되고 있어, 이의 일환으로 기초공사의 효율성 제고를 위한 노력이 필요하다. 이 연구에서는 LH공사에서 공급하는 벽식공동주택의 층수를 세분화하여 상부구조물에 대한 구조해석과 기초설계를 수행하였다. 기초설계 결과를 반영하여 벽식공동주택의 층수에 따른 경제성 평가를 수행하고 최적 PHC말뚝 직경을 제안하였다. 이 연구에서 제안한 벽식공동주택의 층수별 PHC말뚝 직경은 공사의 공동주택 기초설계 시 유용하게 활용될 수 있을 것으로 사료된다.
홍주읍성의 초축 연대는 명확히 알 수 없으나 문종 1년 축조 이후 수십 차례에 걸친 보수와 정비를 거쳤으며, 일제강점기에 일부 성벽이 훼철되면서 오늘날의 형태를 갖게 되었다. 홍성은 지구조적으로 지진의 발생 가능성이 높은 지역이다. 역사지진 기록이 남아 있으며, 1978년과 1979년에 각각 규모 5.0과 4.0의 지진이 발생하여 성벽 일부가 붕괴된 바가 있다. 2010년에는 집중강우에 의해 성벽이 붕괴되기도 하였다. 홍주읍성 성벽은 구간에 따라 다양한 구성암종, 치석형태, 축조방식, 채움재료 등이 적용되었다. 또한 보수과정에서 기존의 성벽을 훼철하지 않고 재사용 가능한 부분을 그대로 사용하여 시대에 따른 특성이 성벽에 수직적으로 반영되어 나타난다. 따라서 홍주읍성의 유형분류는 성벽의 수직적 분포를 기준으로 나누었으며, 축성유형의 수직적 개수에 따라 유형 I, 유형 II, 유형 III으로 구분하였다. 성벽에 사용된 암석은 주로 조립질화강암이나 성벽유형에 따라 암종의 차이가 명확하다. 성벽 하부는 자연석 내지 할석을 사용하여 다양한 암종이 혼재되어 나타나나, 중앙부의 치석한 암석은 대부분 조립질 화강암이다. 보수석재는 담홍색화강암이나 수구지와 조양문의 구성 암종은 성벽과 상이하다. 홍주읍성의 대표적인 손상유형은 배부름, 성돌의 돌출, 기초부 성돌의 유실, 부재의 이격, 균열 및 단열, 기초불안정 및 구조적 변형이다. 성벽에 발생하는 거동의 양과 방향을 확인하기 위해 수동 간이계측 및 광파측정을 수행하였다. 수동계측 결과, 성벽의 구조적 변형이 진행되는 구간을 분류할 수 있다. 광파측정 자료와 비교한 결과, 두 모니터링 방법은 상호 상관관계가 있는 것으로 나타났다. 따라서 장기적인 보존관리 방안으로 두 계측방법은 상호 보완적으로 활용할 수 있으며, 홍주읍성의 안정화를 위해 계측시스템은 유지, 관리 및 개선되어야 할 것이다. 남문지 일대의 계측결과를 종합할 때, 붕괴된 성벽 또한 강우에 의한 거동변화가 지속적으로 진행되었을 것이다. 오랜 기간 변위가 누적된 상태에서 집중강우에 의해 발생한 이상거동에 따라 임계점을 초과하여 붕괴에 이르렀을 개연성이 충분하다. 홍주읍성 성벽의 효율적 관리를 위해 연구결과를 토대로 0등급부터 5등급까지 총 6단계의 관리등급을 제안하였다. 이 관리등급을 적용한 결과, 1등급 501.9m (61.10%), 2등급 29.5m (3.77%), 3등급 10.4m (1.33%), 4등급 241.2m (30.80%)로 나타났다. 4등급 구간은 홍화문 서쪽과 치성의 동쪽에 밀집된 양상으로 나타나며, 상시 모니터링 수행을 통해 위험상황에 대비해야 한다. 6단계로 분류한 관리등급은 전체적인 안정성 검토를 통해 수리와 보수가 수행된다면 다시 0등급으로 회귀하는 윤회적 시스템이다. 이를 위해서는 주기적인 정밀 모니터링을 통한 관리등급의 평가가 필요하다.
The development of rumen in fetuses between 60, 90, 120 days of gestation and neonates of Korean native goats was investigated by light, scanning electron microscopy. The results were summarized as follows; 1. In the 60-day-old fetuses, the stomach was developed and differentiated into four compartments of rumen, reticulum, omasum, and abomasum. The ruminal epithelial layers were differentiated into two zones; a small dark basal and a large light luminar zones. 2. In the 90-day-old fetuses, the light luminar zone of the rumen was 6-12 times thicker than the dark zone. 3. In the 120-day-old fetuses, the wall of the rumen had increased in thickness, and its the mucosa was still smooth. Several undulations of various depths involving the basal zone, basement membrane and lamina propria were observed at irregular within the light zone. 4. In the neonate, the wall of the rumen had increased in thickness and the luminar surface had become wavy due to the appearance of several shallow furrows in the luminar surface of the epithelium especially between the tips of the relatively more developed undulations. 5. Scanning electron microscopic studies: In the 90-day-old fetuses, numerous microvilli and microridges were observed on the superficial epithelial layer of the rumen. The ruminal papillae were already formed at 120 days of gestation. In the 120-day-old fetuses, the ruminal papillae formed short dome-shape. In the neonate, the ruminal papillae formed pebble-shape or short finger like.
Coffer dam for tunnel type spillway in inflow section of Dae-am dam was originally planned as 2 lines sheet piles with Water Zet method. But, the result of pilot test was caused of some problems that vibration during installation of pile could pollute water and water leakage could the lower part. So, sheet piles was not satisfactory for faculty of coffer dam. Structural instability of sheet pile system need to reinforcement. Characteristic of Dae-am dam was small reservoir capacity but wide drainage area, of which it was judgment that security of leakage and stability was difficult during excavation of inlet part. So, we consider that water curtain method utilized with in site pouring concrete pile method was designed at weir part of spillway. We were known about basement rock that geological boring was carried out in weir part. After taking a deep consideration, PRD method was accepted as a new method. Concrete pile by PRD was installed to below country rock. CJM method was carried out with PRD. After making concrete wall using Top-down method, earth anchors were installed for supporting it. According to the result of numerical analysis, as water level rises, wall is stable.
Park, U-Yeol;Jung, Hyeon-Ok;Kang, Tai-Kyung;Cho, Hun-Hee
한국건축시공학회지
/
제10권4호
/
pp.123-132
/
2010
Rebar work accounts for approximately 30% of the total construction costs for rebars and concrete. Recently, the high rising prices of rebars have become one of the principle factors of rising construction costs. Therefore, construction companies are putting much effort into loss reduction of rebars. Consequently, in this study, we wished to present loss reduction methods of rebars before the preparation of the placing drawings. To devise such methods, we collected previous case studies and analyzed methods that were applied for loss reduction. As a result of the analysis, we were able to find the following methods for loss reduction of rebars: method of reducing the number of splices at the mat foundation, method of reducing splice length at the internal columns or walls of the underground parking lot, method of reducing cap-ties of internal beams of basement floors excluding perimeter beams, and method of reducing anchorage length at the internal column or wall of the underground parking lot. Based on those analysis results, we presented our own loss reduction methods of rebars. Applying our methods resulted in considerable loss reduction.
Seismic analyses of a pile under a large rigid basement foundation embedded in the homogeneous soil layer were performed practically by a response displacement method assuming a sinusoidal wave form. However, it is hard to take into account the characteristics of a large mat foundation and a heterogeneous soil layer with the response displacement method. The response displacement method is relevant to the 2D problems for longitudinal structures such as tunnel, underground cave structure, etc., but might not be relevant with isolated foundations for building structures. In this study, seismic pile analysis by a pseudo 3D finite element method was carried out to compare numerical results with results of the response displacement method considering 3D characteristics of a foundation-soil system which is important for the building foundation analyses. Study results show that seismic analyses results of a response displacement method are similar to those of a pseudo 3D numerical method for stiff and dense soil layers, but they are too conservative for a soft soil layer inducing large soil pressures on the foundation wall and large pile displacements due to ignored foundation rigidity and resistance.
The curing temperature is known to influence the rate of mechanical properties development of early age concrete. In realistic sites the temperature of concrete is not isothermal $20^{\circ}C$, so the paper measured adiabatic temperature increases of four different concretes to understand heat emission during hydration at early age. The temperature-matching curing schedule in accordance with adiabatic temperature increase is adopted to simulate the situation in real massive concrete. The specimens under temperature-matching curing are subjected to realistic temperature for first few days as well as adiabatic condition. The mechanical properties including compressive strength, splitting strength and modulus of elasticity of concretes cured under both temperature-matching curing and isothermal $20^{\circ}C$ curing are investigated. The results denote that comparing temperature-matching curing with isothermal $20^{\circ}C$ curing, the early age concretes mechanical properties are obviously improved, but the later mechanical properties of concretes with pure Portland and containing silica fume are decreased a little and still increased for concretes containing fly ash and slag. On this basement using an equivalent age approach evaluates mechanical properties of early age concrete in real structures, the model parameters are defined by the compressive strength test, and can predict the compressive strength, splitting strength and elasticity modulus through measuring or calculating by finite element method the concreted temperature at early age, and the method is valid, which is applied in a concrete wall for evaluation of crack risking.
Fine structures of the testis and vas deferens in the fall-web worm, Hyphantria cunea Drury, are studied with electron microscope. Adult worms have single testis close to the midlines of the abdomen. Testis is composed of 4 follicles which are incompletly separated from each other and bounded together by a peritoneal sheath. The peritoneal sheath consisted of outer cuticular layer and two kinds of inner layers, in which glycogen particles are dispersed commonly. These two layers are divided by the morphology of cytoplasmic granules. Follicular epithelium forming the wall of the follicles have melanin pigment granules, and trachea or tracheoles are extended through this epithelium. In the cysts of adult testis, matured spermatozoa are grouped together in bundles and after releasing the sperm bundles to the vas deferens, lamellar shaped lysosomes appeared in the cytoplasms of the cyst cells. The number of spermatozoa per cyst is exactly 256 ($2^8$), this number is characteristics of the Lepidoperan species. Vas deferens is a tube with a fairly thick bounding epithelium, a basement membrane and a layer of circular muscle outside it. At the apical portion of the epithelial cells, microvilli are well developed. And in the cytoplasms of these cells, numerous excretory granules are observed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.