• Title/Summary/Keyword: Barton-Bandis 절리구성모델

Search Result 6, Processing Time 0.019 seconds

A Numerical Study for Stability of Tunnel in Jointed Rock Using Barton-Bandis Model (BB절리모델을 활용한 절리암반속 터널안정성의 수치해석적 연구)

  • Lee, Sung-Ki;Chung, Hyung-Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.3
    • /
    • pp.15-29
    • /
    • 2001
  • For the pertinent use of NMT method, both characteristics of joints (JRC, JCS and ${\phi}_r$) and characteristics of rock mass (Q-Value) must be investigated carefully. The main objective of the study presented is to investigate how sensitive the predicted behaviour of an underground excavation is to various realistic assumptions about some input parameter for the jointed rock mass. Joint pattern in the tunnel is predicted by statistical approach (chi-square test). In this paper, sensitivity studies involving in joint characteristics were carried out. The parametric studies involving change in Barton-Bandis joint model have shown that JCS is relatively insensitive to JRC and ${\phi}_r$. An increase in JRC value may not, according to the Barton-Bandis model, necessarily lead to a decrease in displacement. The importance of dilation in predicting the behaviour of a rock mass around an excavation is emphasized from a comparison of the Barton-Bandis joint behaviour model with the Mohr-Coulomb model. The Barton-Bandis model predicted higher stress, which allow for the build-up of stress caused by dilatant behaviour.

  • PDF

Stability Analysis of a Jointed Rock Slope with the Barton-Bandis Joint Constitute Model Using UDEC (Barton-Bandis joint model을 이용한 절리 암반 사면의 안정성 해석)

  • 최성웅;정소걸
    • Tunnel and Underground Space
    • /
    • v.9 no.2
    • /
    • pp.141-148
    • /
    • 1999
  • Distinct element simulation in jointed rock masses is largely dependent upon the joint constitutive equation used. This paper describes the differences between the Barton-Bandits (BB) and the Mohr-Coulomb (MC) joint constitutive models for the stability analysis of the jointed rock slopes. The BB model, which allows the modelling of the dilation accompanying shear, predicts results very similar to the present condition of slopes. Consequently the 10 cm thick shotcrete was proposed for the reinforcement of those slopes. The MC model, however, in which the dilation angle is constant, is relatively insensitive to the behaviors of joints.

  • PDF

Stability Analysis of Jointed Rock Slope by D.E.M (개별요소법에 의한 절리 암반 비탈면의 안정성 해석)

  • Park, Geun-Uck;Lim, Han-Uk
    • Journal of Industrial Technology
    • /
    • v.21 no.B
    • /
    • pp.51-58
    • /
    • 2001
  • The Distinct Element Method (DEM) was used to analyze the stability of jointed rock slope, of which dimension are about 200m(length), 60m(height), $55^{\circ}$ dip. The Barton-Bandis joint model was used, as a constitutive model. The parameters such as JRC and spatial distribution characteristics of discontinuities were acquired through field investigation. Three different cases such as $51^{\circ}$, $45^{\circ}$ and $38^{\circ}$ in angle of rock slope were analyzed to decide a stable slope. To keep the jointed rock slope safely, it is proposed to reduce the height of slope from 60m to 48m and to reduce the angle of the from $55^{\circ}$ to $38^{\circ}$ too.

  • PDF

Analysis on the Deformation Characteristics of a Pillar between Large Caverns by Burton-Bandis Rock Joint Model (Barton-Bandis 절리 모델에 의한 지하대공동 암주의 변형 특성 연구)

  • 강추원;임한욱;김치환
    • Tunnel and Underground Space
    • /
    • v.11 no.2
    • /
    • pp.109-119
    • /
    • 2001
  • Up to now single large cavern was excavated for each undergroud hydraulic powerhouse in Korea. But the Yangyang underground hydraulic powerhouse consists of two large caverns; a powerhouse cavern and main transformer cavern. In this carte, the structural stability of the caverns, especially the rock pillar formed between two large caverns, should be guaranteed to be sound to make the caverns permanently sustainable. In this research, the Distinct Element Method(DEM) was used to analyze the structural stability of two caverns and the rock pillar. The Barton-Bandis joint model was used as a constitutive model. The moot significant parameters such as in-site stress, JRC of in-situ natural joints, and spatial distribution characteristics of discontinuities were acquired through field investigation. In addition, two different cases; 1) with no support system and 2) with a support system, were analysed to optimize a support system and to investigate reinforcing effects of a support system. The results of analysis horizontal displacement and joint shear displacement proved to be reduced with the support system. The relaxed zone in the rock pilar also proved to be reduced in conjunction with the support system. Having a support system in place provided the fact that the non zero minimum principal stresses were still acting in the rock pillar so that the pillar was not under uniaxial compressive condition but under triaxial compressive condition. The structural stability f an approximately 36 m wide rock pillar between two large caverns was assured with the appropriate support system.

  • PDF

Barton-Bandis 절리 모델에 의한 지하대공동 암주의 변형 특성 연구

  • 강추원;임한욱;김치환
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2001.03a
    • /
    • pp.118-131
    • /
    • 2001
  • 우리 나라의 양수발전소는 지금까지 단일공동을 굴착하였다. 그러나 양양 양수발전소는 두 개의 대공동 즉, 발전소와 주 변전소로 구성된다. 이 경우 공동 구조물의 안정성, 특히 두 공동사이에 형성되는 암주를 영구적으로 안전하게 유지 할 수 있도록 보장되어야 한다. 본 연구에서는 개별요소법을 이용하여 두 공동과 암주의 구조적 안정성을 평가하였으며, 구성모델로 Barton-Bandis의 절리모델을 이용하였다. 현지 암반의 초기응력, 자연절리면의 거칠기계수 불연속면의 공간적 분포 특성과 같은 중요한 요인들은 현지 조사를 통하여 구하였다. 이외에 두 가지 경우 즉, 무보강과 보강의 경우 지보시스템의 최적화를 분석하였으며, 또한 보강효과를 검토하였다. 연구결과 보강의 경우 수평변위와 절리의 전단변위가 감소되었으며 암주내 이완영역 역시 감소됨을 확인하였다. 두 공동사이에 있는 약 36m 두께의 암주에 적절한 보강조치를 취하여 안정성을 확보할 수 있었다.

  • PDF

Thermohydromechanical Behavior Study on the Joints in the Vicinity of an Underground Disposal Cavern (심부 처분공동 주변 절리에서의 열수리역학적 거동변화)

  • Jhin wung Kim;Dae-seok Bae
    • The Journal of Engineering Geology
    • /
    • v.13 no.2
    • /
    • pp.171-191
    • /
    • 2003
  • The objective of this present study is to understand long term(500 years) thermohydromechanical interaction behavior on joints adjacent to a repository cavern, when high level radioactive wastes are disposed of within discontinuous granitic rock masses, and then, to contribute this understanding to the development of a disposal concept. The model includes a saturated discontinuous granitic rock mass, PWR spent nuclear fuels in a disposal canister surrounded with compacted bentonite inside a deposition hole, and mixed bentonite backfilled in the rest of the space within a repository cavern. It is assumed that two joint sets exist within a model. Joint set 1 includes joints of $56^{\circ}$ dip angle, spaced 20m apart, and joint set 2 is in the perpendicular direction to joint set 1 and includes joints of $34^{\circ}$ dip angle, spaced 20m apart. The two dimensional distinct element code, UDEC is used for the analysis. To understand the joint behavior adjacent to the repository cavern, Barton-Bandis joint model is used. Effect of the decay heat from PWR spent fuels on the repository model has been analyzed, and a steady state flow algorithm is used for the hydraulic analysis.