Underground building constructions are recently more important because the ratio of underground area is increasing in the huge and high-rise building construction projects. For reducing the total building construction periods, it is required to reduce not only the over-ground structural work periods but also the underground structural work periods. Therefore, this study is proposed the non-supporting system forms for single face walls in underground building construction by one of the methods for reducing the underground structural work periods and investigated the applicability of the non-supporting system forms by analyzing the case-study in civil construction project. In regard of construction duration, the results of analyzing the case-study showed that the non-supporting system forms are better than the euro forms with soldier system for single face walls in underground building construction. In addition, it is showed that the cost of these two forms is similar and usage the working space and safety in non-supporting system forms are better that those of the euro forms with soldier system, too.
Kim, Hyun-Mi;Kim, Tae-Hyung;Shin, Young-Keun;Kim, Young-Suk;Han, Seungwoo
Journal of the Korea Institute of Building Construction
/
v.12
no.6
/
pp.636-647
/
2012
Construction projects have become so large, complicated and incredibly high-tech that process management is currently considered one of the most important issues. Unlike typical manufacturing industries, most major construction activities are performed in the open air and thus are exposed to various environmental factors. Many studies have been conducted with the goal of establishing efficient techniques and tools for overcoming these limitations. Productivity analysis and prediction, one of the related research subjects, must be considered when evaluating approaches to reducing construction duration and costs. The aim of this research is to present a quantified impact analysis of construction delay factors on construction productivity of a steel staircase system, which has been widely applied to high rise building construction. It is also expected to improve the process by managing the factors, ultimately achieving an improvement in construction productivity. To achieve the research objectives, this paper analyzed different delay factors affecting construction duration by means of multiple regression analysis focusing on steel staircase systems, which have critical effects on the preceding and subsequent processes in structure construction. Statistical analysis on the multiple linear regression model indicated that the environment, labor and material delay factors were statistically significant, with 0.293, 0.491, and 0.203 as the respective quantified impacts on productivity.
International conference on construction engineering and project management
/
2005.10a
/
pp.527-532
/
2005
The construction industries are facing problems of productivity, quality of work, safety, and the completion of projects in time. In construction industry a worker is exposed to hazardous environment, and has to do more physical work, effecting his health and also productivity. The automation and robotics can offer solution to many problems of the industry. In the past the major barrier to construction automation is the lack of electronic components and systems. This is solved now with the development of information technology, and the current obstacle is the high cost of automated systems, shortage of public money for R&D, and problems of acceptance. The robots employed in construction have followed the same concept as those employed in manufacturing. However, construction industry requires a different kind of robot compared to manufacturing Industry. The robots are stationery and product moves along the assembly line in manufacturing sector, but construction robots have to move about the site because buildings are stationary and of large size. The construction robots must function in adverse weather conditions, including variation in humidity, and temperature and increase the overall construction productivity rate. The major objective of the paper is to review the existing applications of building robots and to assess their implementation in building industry. A case study is considered for the implementation of robots for the painting work of the University Building at Saifabad PG College of Science, Hyderabad, India.
Journal of the Korea Institute of Building Construction
/
v.10
no.6
/
pp.77-85
/
2010
Recently, with development of core technology for supertall building construction projects, the need for an improvement of the related legal system is increasing dramatically. Therefore, the supertall Buildings R&DB Center, which is funded by the Ministry of Land, Transport and Maritime affairs (MLTM), is studying the legal system for supertall buildings. This research, as one part of the 1st year research results, aimed at studying supertall building project related issues and problems to develop supertall building elements, and conducting an importance-performance analysis (IPA) of these elements in order to conclude a strategy and direction for an improvement of the related legal system. A total of 68 supertall building elements were derived, and the IPA method was used to analyze these elements based on attribute types. Furthermore, an improvement strategy and directions were suggested for upgrading the legal system related to supertall buildings to the level of global standards. These efforts can be the base for advancing the legal systems of the domestic construction industry in all areas, including supertall building construction.
Journal of the Korea Institute of Building Construction
/
v.5
no.2
s.16
/
pp.115-121
/
2005
The building below standard scales to be built only by constructive report to authorities. Construction law 8 illustrates that supervision should be deployed in all the construction sites at the building which is found to have more than 3 floors and also to have more than loom of total squares in especially outside area of city plan zone. Such a small construction is have a important and the most basic meaning. Many problems were found to occur in all the constructive places which were out of the limit of this law. The construction sites were found to be controlled by public official's visiting without supervisors and designers of architecture. Technique of construction in architecture was found to be not different from that of 1980. The security of employees in construction on sites has a serious problem. Because of choosing ail the materials of the building without a reasonable point. All the building were found to have a law material about inside and outside aspects. The purpose of this study are to examine existing law about a small project and than to analyze the situation of constructive control through questionnaires and interviews with all the supervisors. Based on the data base of engineers who had a great experience in construction sites, The purpose of this study is also to suggest and advise the method of controlling all the items in architecture through on and off line.
International conference on construction engineering and project management
/
2011.02a
/
pp.168-175
/
2011
Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.
Kim Hyun-Joung;Kim Seung-Jin;Kim Tae-Hui;Kim Sun-Kuk
Proceedings of the Korean Institute of Building Construction Conference
/
2005.05a
/
pp.137-140
/
2005
In spite of a construction of many set building, the government's set building policies being almost indifferent to the maintenance management of them. Currently the personnel is not enough for maintenance management in set building. Therefore many set building does not become accomplished appropriately. On this paper, the set building policies and a questionnaire are analyzed. The result of questionnaire provides fundamental data of proper staff calculation.
Proceedings of the Korean Institute of Building Construction Conference
/
2010.05a
/
pp.247-251
/
2010
Recently due to the crisis of environment and resources, construction industry that effect a lot on nature than any other industries is essentially required to consider environmental element through the life cycle. Lots of advanced countries and Korea have already been running green building certification systems. However, GBCC(Green Building Certification Criteria) in Korea is lack of assessment criteria that apply environmental characteristics of tall building in compared with that in advanced countries. To improve the problem, we compared GBCC with LEED(Leadership in Energy and Environmental Design) through the case study. This study provides preliminary data for reflecting environmental characteristics of tall building in GBCC.
Yun, Ki Cheol;Oh, Chi Don;Cho, Nam Ho;Kim, Kyong Ju;Park, Chan Sik
Journal of Construction Engineering and Project Management
/
v.4
no.2
/
pp.1-7
/
2014
Radio Frequency Identification (RFID) has been applied to the construction industry for improving the efficiency of material and process management. Most RFID-related studies have focused on building or plant construction. The application of RFID has been limited in pipeline construction projects where materials are stored and stacked across a large construction site. This paper investigates practical issues in pipeline construction, improves the read rates of RFID tags, and tests their utility by putting them into practice. This paper demonstrates the benefits that may be expected with the use of improved RFID tags and the development of an automated pipeline construction management system. As a result, pipeline construction management time decreased by 28 hours per month compared to the conventional method. Cost decreased by about 26%.
Kim, Ji-Sun;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
Proceedings of the Korean Institute of Building Construction Conference
/
2011.11a
/
pp.61-62
/
2011
Construction plans for large construction projects are problems such as Incompatibility of information, omissions due to technical limitations of 2D CAD. In addition to, Plan established for the validation such as process, cost and construction technology plan is difficult. By occurring Frequent changes in the course of business, Inefficiency of management has occurred. In the construction process, there is occurred costs and construction delays due to reconstruction or communication error. In this study, It was deemed BIM will complement Existing 2D CAD problem. And, BIM case studies in the construction phase of domestic construction were analyzed, How to apply BIM in the construction phase investigated.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.