• Title/Summary/Keyword: BUILDING CONSTRUCTION

Search Result 11,236, Processing Time 0.043 seconds

A Study on the Applicability of Non-Supporting System Forms for Single Face Walls in Underground Construction (지하층 합벽 무지주 시스템 거푸집의 적용성에 관한 연구)

  • Kim, Jae Yeob;An, Sung-Hoon;Sohn, Young-Jin
    • KIEAE Journal
    • /
    • v.8 no.2
    • /
    • pp.87-92
    • /
    • 2008
  • Underground building constructions are recently more important because the ratio of underground area is increasing in the huge and high-rise building construction projects. For reducing the total building construction periods, it is required to reduce not only the over-ground structural work periods but also the underground structural work periods. Therefore, this study is proposed the non-supporting system forms for single face walls in underground building construction by one of the methods for reducing the underground structural work periods and investigated the applicability of the non-supporting system forms by analyzing the case-study in civil construction project. In regard of construction duration, the results of analyzing the case-study showed that the non-supporting system forms are better than the euro forms with soldier system for single face walls in underground building construction. In addition, it is showed that the cost of these two forms is similar and usage the working space and safety in non-supporting system forms are better that those of the euro forms with soldier system, too.

Quantified Impact Analysis of Construction Delay Factors on Steel Staircase Systems

  • Kim, Hyun-Mi;Kim, Tae-Hyung;Shin, Young-Keun;Kim, Young-Suk;Han, Seungwoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.636-647
    • /
    • 2012
  • Construction projects have become so large, complicated and incredibly high-tech that process management is currently considered one of the most important issues. Unlike typical manufacturing industries, most major construction activities are performed in the open air and thus are exposed to various environmental factors. Many studies have been conducted with the goal of establishing efficient techniques and tools for overcoming these limitations. Productivity analysis and prediction, one of the related research subjects, must be considered when evaluating approaches to reducing construction duration and costs. The aim of this research is to present a quantified impact analysis of construction delay factors on construction productivity of a steel staircase system, which has been widely applied to high rise building construction. It is also expected to improve the process by managing the factors, ultimately achieving an improvement in construction productivity. To achieve the research objectives, this paper analyzed different delay factors affecting construction duration by means of multiple regression analysis focusing on steel staircase systems, which have critical effects on the preceding and subsequent processes in structure construction. Statistical analysis on the multiple linear regression model indicated that the environment, labor and material delay factors were statistically significant, with 0.293, 0.491, and 0.203 as the respective quantified impacts on productivity.

ROBOTICS AND AUTOMATION IN CONSTRUCTION INDUSTRY

  • Younus Khan;G. Chandra Sekhar Reddy;V.S.S. Kumar
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.527-532
    • /
    • 2005
  • The construction industries are facing problems of productivity, quality of work, safety, and the completion of projects in time. In construction industry a worker is exposed to hazardous environment, and has to do more physical work, effecting his health and also productivity. The automation and robotics can offer solution to many problems of the industry. In the past the major barrier to construction automation is the lack of electronic components and systems. This is solved now with the development of information technology, and the current obstacle is the high cost of automated systems, shortage of public money for R&D, and problems of acceptance. The robots employed in construction have followed the same concept as those employed in manufacturing. However, construction industry requires a different kind of robot compared to manufacturing Industry. The robots are stationery and product moves along the assembly line in manufacturing sector, but construction robots have to move about the site because buildings are stationary and of large size. The construction robots must function in adverse weather conditions, including variation in humidity, and temperature and increase the overall construction productivity rate. The major objective of the paper is to review the existing applications of building robots and to assess their implementation in building industry. A case study is considered for the implementation of robots for the painting work of the University Building at Saifabad PG College of Science, Hyderabad, India.

  • PDF

The Strategy and Direction for Upgrading the Legal System Governing Supertall Building Elements (초고층건축요소별 법제도 개선방향)

  • Yu, Il-Han;Eom, Shin-Jo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.77-85
    • /
    • 2010
  • Recently, with development of core technology for supertall building construction projects, the need for an improvement of the related legal system is increasing dramatically. Therefore, the supertall Buildings R&DB Center, which is funded by the Ministry of Land, Transport and Maritime affairs (MLTM), is studying the legal system for supertall buildings. This research, as one part of the 1st year research results, aimed at studying supertall building project related issues and problems to develop supertall building elements, and conducting an importance-performance analysis (IPA) of these elements in order to conclude a strategy and direction for an improvement of the related legal system. A total of 68 supertall building elements were derived, and the IPA method was used to analyze these elements based on attribute types. Furthermore, an improvement strategy and directions were suggested for upgrading the legal system related to supertall buildings to the level of global standards. These efforts can be the base for advancing the legal systems of the domestic construction industry in all areas, including supertall building construction.

A Study on the Improving Management Method for the Small Projects applying Senior Construction Engineer (고령 건설기술자를 활용한 소규모공사의 공사관리방법 개선방안)

  • Song, Jin-Woo;Jeong, Yong-Sik;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.2 s.16
    • /
    • pp.115-121
    • /
    • 2005
  • The building below standard scales to be built only by constructive report to authorities. Construction law 8 illustrates that supervision should be deployed in all the construction sites at the building which is found to have more than 3 floors and also to have more than loom of total squares in especially outside area of city plan zone. Such a small construction is have a important and the most basic meaning. Many problems were found to occur in all the constructive places which were out of the limit of this law. The construction sites were found to be controlled by public official's visiting without supervisors and designers of architecture. Technique of construction in architecture was found to be not different from that of 1980. The security of employees in construction on sites has a serious problem. Because of choosing ail the materials of the building without a reasonable point. All the building were found to have a law material about inside and outside aspects. The purpose of this study are to examine existing law about a small project and than to analyze the situation of constructive control through questionnaires and interviews with all the supervisors. Based on the data base of engineers who had a great experience in construction sites, The purpose of this study is also to suggest and advise the method of controlling all the items in architecture through on and off line.

AN APPROACH FOR ESTIMATING TOTAL COST OF OCCUPATIONAL SAFETY FOR BUILDING CONSTRUCTIONS

  • Gurkan Emre Gurcanli;Nesimi Teoman Korkutan;Ugur Mungen
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.168-175
    • /
    • 2011
  • Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.

  • PDF

A Case Study for Maintenance Management Personnel of Set Building (집합건축물의 유지관리 인원 실태조사)

  • Kim Hyun-Joung;Kim Seung-Jin;Kim Tae-Hui;Kim Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.137-140
    • /
    • 2005
  • In spite of a construction of many set building, the government's set building policies being almost indifferent to the maintenance management of them. Currently the personnel is not enough for maintenance management in set building. Therefore many set building does not become accomplished appropriately. On this paper, the set building policies and a questionnaire are analyzed. The result of questionnaire provides fundamental data of proper staff calculation.

  • PDF

Comparison of Domestic and International Green Building Certification Criteria for Application of Environmental Characteristics in Tall Buildings (초고층 건축물의 환경적 특성 반영을 위한 국내.외 친환경 건축물 인증제도 비교.분석)

  • Cha, Min-Soo;Kim, Tae-Hoon;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.247-251
    • /
    • 2010
  • Recently due to the crisis of environment and resources, construction industry that effect a lot on nature than any other industries is essentially required to consider environmental element through the life cycle. Lots of advanced countries and Korea have already been running green building certification systems. However, GBCC(Green Building Certification Criteria) in Korea is lack of assessment criteria that apply environmental characteristics of tall building in compared with that in advanced countries. To improve the problem, we compared GBCC with LEED(Leadership in Energy and Environmental Design) through the case study. This study provides preliminary data for reflecting environmental characteristics of tall building in GBCC.

  • PDF

Practical Issues in Application of RFID to Pipeline Construction and its Benefit Analysis

  • Yun, Ki Cheol;Oh, Chi Don;Cho, Nam Ho;Kim, Kyong Ju;Park, Chan Sik
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.2
    • /
    • pp.1-7
    • /
    • 2014
  • Radio Frequency Identification (RFID) has been applied to the construction industry for improving the efficiency of material and process management. Most RFID-related studies have focused on building or plant construction. The application of RFID has been limited in pipeline construction projects where materials are stored and stacked across a large construction site. This paper investigates practical issues in pipeline construction, improves the read rates of RFID tags, and tests their utility by putting them into practice. This paper demonstrates the benefits that may be expected with the use of improved RFID tags and the development of an automated pipeline construction management system. As a result, pipeline construction management time decreased by 28 hours per month compared to the conventional method. Cost decreased by about 26%.

A Study on Obstacle Reasons of BIM in Construction Phase (시공단계에서의 BIM 도입 저해요인에 관한 기초연구)

  • Kim, Ji-Sun;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.61-62
    • /
    • 2011
  • Construction plans for large construction projects are problems such as Incompatibility of information, omissions due to technical limitations of 2D CAD. In addition to, Plan established for the validation such as process, cost and construction technology plan is difficult. By occurring Frequent changes in the course of business, Inefficiency of management has occurred. In the construction process, there is occurred costs and construction delays due to reconstruction or communication error. In this study, It was deemed BIM will complement Existing 2D CAD problem. And, BIM case studies in the construction phase of domestic construction were analyzed, How to apply BIM in the construction phase investigated.

  • PDF