A Case Study for the 1st Double-level Tunnel for Light vehicle in Urban Area in Korea (국내 최초 소형차 전용 도심지 대심도 복층터널 설계 사례)

  • Kim, Gyoung-Hun;Choi, Jun-Dong;Jun, Duk-Chan;Shin, Il-Jae;Sim, Dong-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1302-1313
    • /
    • 2010
  • The west express way is notorious for extremely heavy traffic area in the west of Seoul, South Korea. Hence, the city government recently initiated a new underground BTO (Build-Transfer-Operate) road project to solve traffic congestion and a high construction cost. The proposed underground express road being designed is the first double-level tunnel ever designed in South Korea and using Conventional tunnelling method (NATM). A total length of tunnel for light vehicles is 10.91km long including both open cut structures and concrete lining with middle-deck in bored tunnel. There are also 4 ventilation shafts for ventilation and evacuation on emergency. Many design issues had been aroused during the preliminary design phase and detail design phase is currently going on. This paper discusses design focuses including excavation methods, ground water issues, a deck slab installation, and a construction cost etc. for the double level road tunnel design of urban area.

  • PDF

A Case Study on M & E Design for Double-Deck Tunnel in Urban Area (도심지 대심도 복층터널의 환기 및 방재계획)

  • Byun, Sang-Hun;Jeong, Jae-Ho;Jun, Duk-Chan;Shin, Il-Jae;Sim, Dong-Hyun
    • Tunnel and Underground Space
    • /
    • v.21 no.4
    • /
    • pp.281-286
    • /
    • 2011
  • The west underground express way is a recent initiated BTO (Build-Transfer-Operate) project for releasing heavy traffic of the existing west express way which is notorious on-ground road for extremely traffic stuck area in the west of Seoul, South Korea. The new express way for light vehicles is the first double-deck tunnel ever designed in South Korea and 10.91 km long including both open cut structures and concrete lining with middle-deck in bored tunnel. Because the new express way is going through underground of heavily populated area, mechanical & electrical design for the safety of drivers in tunnel is one of the most important parts among many design issues. This paper discusses M & E design focuses including ventilation-evacuation plan and various safety facilities.

Problems and Solutions of private university dormitory project with PFI (민간투자사업을 활용한 사립대 기숙사의 문제점 및 개선방안)

  • Kim, Jong-Soo;Song, Nak-Hyun;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.471-474
    • /
    • 2008
  • The range of PFI project has been expanded from Road facilities, Hobor facilities to Education facilities, Military residence facilities since 2005. Especially, The dormitory project that one of the most lucrative facilities among education facilities was progressing but it has many problems with introducing PFI project. This object of research is deriving problems by introducing PFI project and solving problems by consulting with experts. The results of research have had problems that increasing rental fee, difficulty of retrieving the investment and shortage of government supports. The solutions concerning the problems are using organization, introducing various programs and relieving regulation of government. This paper was made by consulting with experts and is expecting to use the basic data when comparing and analyzing the cases used PFI.

  • PDF

A Design Focuses on the Internal Structure of Double-level Tunnel (도심지 대심도 복층터널의 내부구조물 계획)

  • Park, Shin-Young;Jeong, Jae-Ho;Cho, Nam-Kak;Shin, Il-Jae;Sim, Dong-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1314-1321
    • /
    • 2010
  • The west express way which links south west area of the central city of Seoul has been notorious for extremely heavy traffics since its first opening in 1991(i.e. the average vehicle speed is less than 25km/h, a daily traffic is 112,000 and among them, more than 94% of the vehicles are the light vehicles). The city government recently initiated a new BTO(Build-Transfer-Operate) project as an alternative in releasing heavy traffic and a high construction cost. The proposed underground express road is the first double-level tunnel (i.e. a total length of road is 10,91km and the tunnel is 9.308km long) ever built in South Korea, while such tunnel system is not new worldwide as such A86 East tunnel in France, SMART tunnel in Malaysia, and Fuxing tunnel in China. This paper discusses major design issues regarding the internal structures such as deck slab, and secondary liner.

  • PDF

Identification and Effect Analysis of Risk Factors for Build Transfer Lease Projects (BTL민간투자사업의 리스크 식별 및 영향도 분석에 관한 연구)

  • Jung, Jung-Man;Park, Young-Min;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.47-56
    • /
    • 2007
  • The Build-Transfer-Lease(BTL) system is a new way of attracting private capital to social infrastructure construction projects. Private companies will get back their investment by leasing facilities to the government. In January 2005, government introduces a 'Korean New Deal Policy' to initiate BTL system in the field of social infrastructure development such as education, public welfare, housing, culture etc. As BTL being still in premature phase, thus it is lack of knowledge in BTL and there is no such studies about problems and impacts of BTL projects. However, there could be so many problems underlying within BTL projects. Therefore, the purpose of this paper is to identify various risk factors during implementation of BTL projects. For this purpose, five BTL undertaking projects were studied. Field survey was conducted based-on interview instruments. Prevailing risk factors in operating the BTL Project were collected from the both officials of project promoters and concessionaires. In addition, a distinct need has emerged for analysis of risk factors for BTL projects. Based on real cases, this study resulted in risk factors influencing every phases and grouped risk factors into each phase. Moreover, this study also perform sensitivity analysis in order to know how risk factors affect to BTL projects. From analyzing the data, the study addresses that both major BTL project participants 'the competent authority' and 'Special purpose company(SPC)' have many problems and difficulties to operate the projects.

Performance Evaluation Model for Public-Private Partnership Projects - with Reference to BTO (Build-Transfer-Operate) Road Projects - (민간투자사업 성과평가 모델 개발 및 적용 - 도로 부문 사업을 중심으로 -)

  • Park, Hyeon;Park, Inseok;Lee, Shin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.83-95
    • /
    • 2018
  • The aim of this paper is to develop a performance evaluation model for PPP (Public-Private Partnership) projects that appropriately reflects the important traits that are unique to PPP projects. To this end, 1) it defines a set of distinct perspectives involved in the PPP projects and their associated success factors that might differ amongst the perspectives; 2) it identifies the key performance indicators and suggests the performance evaluation criteria for each indicator; and 3) it builds a performance evaluation model by matching the success factors from each perspective with performance measure criteria as well as applies the model to the two selected BTO road projects in Korea. The process of model construction and its application confirms significant differences between the main stakeholder perspectives typically involved in PPP projects, which highlights the need for an evaluation model tailored for PPP projects by taking into account the distinct perspectives. The results from the PPP evaluation model developed in the study is compared against the results from the existing ex-post evaluation model for construction projects in general. The former shows a closer match with the results from the user satisfaction survey conducted. This new evaluation framework and the performance indicators entailed in it permits a balanced evaluation of PPP projects as it takes into account different perspectives involved in PPP projects as well as an understanding of the factors affecting the success of PPP projects. While the construction of the model is based on transport projects, it is applicable to different types of PPP projects through variation with the weight allocation amongst different success factors and/or additions or other adjustments to the performance evaluation criteria as required.

Strategies for Multilateral Development Banks Utilization to Enhance International Construction Competitiveness (해외건설 수주경쟁력 강화를 위한 다자간개발은행 활용 방안)

  • Sohn, Tae-Hong;Jung, Chang-Goo;Jang, Hyoun-Seung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.493-498
    • /
    • 2012
  • Korean construction companies have maintained stable market share based on high technology and cost competitiveness although international construction market has been stalled due to increasing global economy uncertainties. However, Korean construction companies have relied heavily on the general types of projects in Middle East and Asia although the portion of different types of projects such as Build-Transfer-Operate (BTO), Build-Transfer-Lease (BTL), and Public-Private-Partnership (PPP) has been increasing in the market. When delivering huge projects requiring contractors deal with activities from project planning to operation, securing finance sources and profitability is deemed critical. Therefore, Korean construction companies need more attentions on the construction market supported by Multilateral Development Banks. However, Korean construction companies have not utilized effective strategies for the market entry and also government supportive policies are not useful enough to help construction companies. This study aims both to analyze the contract structure of Korean construction companies for presenting critical factors that need to be prepared and to suggest various methods that can be applied to support construction companies that have much interest in the Multilateral Development Banks. According to the results of study, it is important that Korean government provide structural information system, make a specialized organization, prevent over-heating among Korean construction companies, and collaborate with Official Development Agency. In addition, it appeared that the fairness and financial stability of project have recognized main advantages of the Multilateral Development Banks.