A Model of Work Breakdown Structure for being applied to Historical Data in BTL Project for Educational Facilities (교육시설 BTL 사업의 실적공사비 적용을 위한 작업분류체계(WBS) 구축)

  • Kim, Sung-Kyum;Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.499-502
    • /
    • 2007
  • The government abolished the existing method to calculate the construction price by the quantity take-off and pricing. It has introduced a new estimating system which uses the actual cost data on the basis of actual contract unit price. However, in the case of the current method to calculate the estimate price of BTL educational facilities, it is difficult to prepare an accurate ground for calculating unit prices due to a lack of standardized work breakdown structure (WBS) and guidelines for the detailed bidding documents. Thus, this research aims to establish WBS using the actual construction price on the basis of the actual bidding documents for the previous construction of BTL educational facilities. This specific WBS can be differentiated from the general WBS which is not suited for construction of the educational facility. It makes possible to build the construction information classification system and it helps to systemize the maintenance and repair cost items.

  • PDF

A Study on Standard Repair Periods, Repair Rates of School Facilities for Revitalizing of the School BTL Project (학교 BTL사업의 활성화를 위한 학교시설의 수선주기와 수선율 및 내용연수 산정에 관한 연구 -서울시내 초·중·고등학교를 중심으로-)

  • Ha, Ho-Sung
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.6 no.1
    • /
    • pp.60-84
    • /
    • 2007
  • This study purpose is seeing that the independent standard sufficiently reflecting the characteristics of the school facility as the basic material needed to calculate the maintenance and repair expenses is needed to make a more realistic and valid qualitative VFM analysis of the school BTL project. this study attempted to develop the standard for the repair cycle and rate and economic year of the school facility. The quantitative VFM analysis should be conducted based on the repair cycle and repair rate proper to the school facility, not the residential space, when calculating the maintenance and repair expenses of the operating expenses of the school facility. An attempt was made to calculate the repair cycle, repair rate and economic life of 114 component materials of the school facility judged to be able to explain the school field best. And it was confirmed that the repair and maintenance expenses more is needed to be set by about 35% than the existing maintenance and repair expenses.

  • PDF

Architectural Work Cost Rate Analysis of Elementary, Middle, and High School Delivered by BTL (초·중등학교 민간투자사업(BTL)의 건축공사비의 공종별 비율 분석)

  • Ryu, Hanguk;Kim, Hyungeun
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.14 no.1
    • /
    • pp.1-9
    • /
    • 2015
  • The accurate estimation of construction cost is critical for effective budgeting and financing of the project. Accurate estimates also allow for informed decisions when considering the responsiveness of bids or proposals and for a contractor to better monitor construction progress. However, current method for construction cost of the public educational facility uses a basic criteria in Korea, e.g, construction cost per unit floor area. Therefore, the purpose of this study is to examine present architectural work cost rate of elementary, middle, and high school delivered by BTL(Build-Transfer-Lease). We examined real construction cost of educational facility according to level of school, such as elementary, middle, and high school. The examination revealed that unit price of BTL educational construction cost are different to the level of school, but the composing rate of architectural work cost of the educational facility are very similar. As a result, it is recommended that future researches are initiated to create specific methods to support the accurate cost estimation of educational facility.

A Survey on the Persons in Charge for Economic Estimation Analysis and Improvement of BTL Projects (BTL사업의 경제성 평가 현황조사 및 개선을 위한 실무자 설문조사연구)

  • Lee, Chun-Kyong;Cho, Bong-Ho;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.73-80
    • /
    • 2007
  • As BTL(Build-Transfer-Lease) private investment business benchmarking PHI(Private Finance Initiative) of USA and Japan is introduces to Korea since 2005, as a part of supplying high leveled public service and early expanding required facilities for SOC, Value for Money on private investment business from treasury investment business at the beginning gets to be needed. Accordingly, this survey has been conducted in order to analyse BTL projects status, propriety of economic analysis method(VFM analysis, calculation of estimated business expenses, valuation of bidding price, etc.) by business advance phases from the viewpoint of person in charge, necessity of improvement and alternative plants. As the result of conducting cross tabulation analysis and correlation analysis by occupational group, BTL project advance phases and alternative plans for improvement, it is necessary ye prepare standardized service level against business expense and basis for calculating and evaluation operation expenses. Based on the necessity of quantitative analysis (LCC analysis) of VFM, standard for calculating management, maintenance and administration expenses is required. In addition, reliable economic valuation system considering domestic BTL environment should be setup, for business efficiency.

A Case Study on the Change of Space Organization of School Facilities on the Design Planning Step - By Analyzing on the Plan of Schools by PFI - (설계단계별 학교시설의 공간구성 변화에 관한 사례 연구 - 민간투자사업 대상 학교의 도면 분석을 통하여 -)

  • Sim, Yeong-Ju;Rieu, Ho-Seop
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.14 no.4
    • /
    • pp.53-65
    • /
    • 2007
  • The present research has been conducted on the arranged form, the number and kinds, the area, the location of the rooms and the variation on exterior designs, based on a layout and a ground plan of each step, which are general plan, VE proposal and the final negotiation, for 11 elementary and middle and high schools that are designed in the way of BTL project. In consequence, it has been found out that there are some changes in the number and position of the rooms. However, the changes are not exceeding the overall arrangement form. This could not have led to the original aim, which is to induce creativity by PFI. It can be supposed that it is because the BTL system is stick to the old process, the method of financial investment and it is true to say that there needs to be solution for that.

Planning BTL Projects for Education (교육시설 관련 BTL 프로젝트 기획)

  • Pollalis, Spiro N.
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.13 no.2
    • /
    • pp.61-68
    • /
    • 2006
  • 본 글은 우리 학회가 2005년 9월 30일 주최한 국제 학술 심포지움인 "민관 협력투자 교육환경 개선방안(Innovation of Education Environment with BTL)"에서 스피로 N. 폴라리스 하바드대학 교수가 발표한 내용을 한글로 번역한 내용이다. 스피로 N. 폴라리스는 하버드대학교 디자인스쿨 교수로 디자인과 정보기술 및 프로젝트 관리에 관한 최신 주제와 디자인 수업을 맡고 있다. 디자인분야의 정보기술, 특히 형태구현과 물리적 공간 강화에 관한 영역 연구에 주력하고 있으며, 브리지디자이너이자 경영컨설턴트로 현재 미국과 유럽지역에서 실무디자이너 역할을 하고 있다. 저서로는 "What is a Bridge?"(1999), "Build-Operate-Transfer"(1996), "Case Studies on Management and Technology"(1993), "Computer-Aided Project Management"(1993)가 있다'. Task Management System'(1991)의 미국특허를 냈다. 아테네에서 구조엔지니어링으로 학위를, MIT에서 석박사학위를 받았으며 노스트이스턴대학교에서 첨단기술에 관한 논문으로 MBA를 취득했고, ETH 취리히와 TU-Delft의 교환교수를 역임했다.

VE Adaptability and Activation plan in Design Phase of BTL Projects (민간투자(BTL)사업의 설계VE 적용 및 활성화 방안 연구)

  • Shin, Jeong-Hoon;Sim, Un-Jun;Lee, Taick-Oun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.4
    • /
    • pp.93-99
    • /
    • 2007
  • Highly advanced technologies are being adopted into the domestic construction industry in accordance with rapidly changing global construction industry in the 21st century. Value Engineering methodologies have often been discussed but not yet settled in the country. This research, therefore, aims to provide a useful guide to utilizing design Value Engineering in Build Transfer Lease. 1. Questionnaires had been conducted, answered by those in the field. 2. Questionnaires were in regard to the obstacles in the application of design Value Engineering and activation schemes. 3. Five standards were provided to be chosen according to the degree of influence from each factor, whose answers were technically analyzed by a statistical program afterward. 4. Four obstacles classified in this method were approached systematically to analyze the problems. 5. Efficient Activation schemes have been suggested after various analyses in a variety of aspects.

A Study on the Survey of the Experts' Consciousness as to the Level in Maintenance Management of Educational Facilities (교육시설 유지관리 수준에 관한 전문가 의식조사 연구)

  • Lee, Mi-Hye;Jung, Young-Han;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.392-397
    • /
    • 2008
  • In case of the BTL project for current educational faculties, the proper standards to analyze those said educational standards lack, so it is very difficult to conduct an exact analysis and those improper standards are problematic when proper management and maintenance costs are calculated. In case of such educational facilities, as students have to use them safely for a long time and the quantity of their activities and the status of their physical growth based on individual classes, as well as the features for use by facility and the regional characteristics are different, other standards for maintenance and management must be considered unlike an apartment house. Thus, in this study, to set up the standards considering the features of educational facilities, the maintenance and management level suitable for educational facilities is presented by comparing and analysing that required to maintain and manage an apartment house, targeting the experts specializing management of educational facilities.

  • PDF

A Study on the Estimating method for Annual Maintenance Costs of Educational Facilities (교육시설물의 연차별 유지보수비 산정 방안에 관한 연구)

  • Son, Jae-Ho;Lee, Seung-Hyun
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.19 no.5
    • /
    • pp.21-28
    • /
    • 2012
  • Current maintenance costs of the educational facilities have been determined by the years of services according to their foundation year. However, these maintenance costs have not considered maintenance and repairing. Therefore, this study suggests a new method to recalculate the years of services of schools by using the data of maintenance and repairing which is stored in the CAD drawing of the educational facilities. Also, since the data of maintenance and repairing has to be kept only for 5 years, the data is limited for the BTL project which has a maintenance period of 20 years. Thus, this study developed a new model to expand 5 years' data to the period of 20 years. This proposed model is expected to contribute in the maintenance and repairing of the BTL project.

Changes of Spatial Composition by Project Phase of Homebase and Media-space on Variation Type Middle and High Schools (교과교실제 중등학교 홈베이스와 미디어스페이스의 사업단계별 공간구성 변화)

  • Park, Im-Ho;Jung, Jin-Ju
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.21 no.2
    • /
    • pp.13-24
    • /
    • 2014
  • This study compared and analyzed middle and high school's homebase and media space which are installed along with the introduction of subject classroom system operation method, with regard to the position of arrangement, the type of arrangement, and the change of area, etc. which were changed and applied per the phase of project. For this, design competitions were implemented since 2006 targeting the cases which participated in design directly-indirectly in the researcher's architectural firm, present construction documents among the selected BTL(Build-Transfer-Lease) were completed, and the examples of 10 schools(design competitions 2 schools, BTL selected plans 8 schools) were analyzed, which were operating variation type.