• Title/Summary/Keyword: BTL Projects

Search Result 96, Processing Time 0.02 seconds

The VFM Analysis on the BTL Projects: Focused on the Case Studies (BTL 사업에 있어서의 VFM 분석에 관한 연구 : 사례연구를 중심으로)

  • Park, Tong-Kyu;Kim, Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.94-101
    • /
    • 2006
  • Since 'Private Investment Act for Social Infrastructure Facilities' were changed in January 2005, BTL projects have been activated in the market. Nevertheless, several problems have been indicated as to the BTL system. Most of these problems are about the choice and scale of the target facilities and the reasonable rate of return allowed to the private investors, which are directly related to the VFM (Value for Money) analysis for the BTL projects. This study discusses the concepts and the methodologies of the VFM analysis, reminds its importance by investigating current problems of the BTL system concerned with the analysis, and suggests useful implications and alternatives through the case studies on the four ongoing BTL projects for the educational facilities.

AN EFFECT ANLYSIS OF RISK FACTORS FOR BUILD TRANSFER LEASE PROJECTS

  • Yang-Woo Lee;Soo-Yong Kim; Jung-Man Jung;Dae-Young Kim
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.498-508
    • /
    • 2007
  • The Build-Transfer-Lease (BTL) projects have rapidly increased under the Government support during recent years. This paper presents the risk analysis of factors affecting BTL projects in the initial phase. This study resulted in 10 significant risk factors influencing on each phase of BTL projects and then factors were grouped into each phase. The sensitivity analysis was also performed to identify risk factors with more significant influence on BTL projects. The results may useful to practitioners in order to cope with risks in initial phase of BTL projects. The paper resulted in the distribution of risks to project parties, thus it can be used as standards for risk assignment to competent authorities and private enterprises of BTL projects.

  • PDF

Improvement Factors of Promoter Selection Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects (BTL사업의 사업시행자 평가기준 개선 요인 분석)

  • Shin, Hyun-In;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.310-316
    • /
    • 2006
  • Since 'Act on Private Participation in Infrastructure' were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation in Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of Promoter. However, score for cost is likely to influence selecting Promoter to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for selecting Promoter in BTL projects, and proposed improvement factors by doing questionnaire over specialists of each field.

  • PDF

Identification and Effect Analysis of Risk Factors for Build Transfer Lease Projects (BTL민간투자사업의 리스크 식별 및 영향도 분석에 관한 연구)

  • Jung, Jung-Man;Park, Young-Min;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.47-56
    • /
    • 2007
  • The Build-Transfer-Lease(BTL) system is a new way of attracting private capital to social infrastructure construction projects. Private companies will get back their investment by leasing facilities to the government. In January 2005, government introduces a 'Korean New Deal Policy' to initiate BTL system in the field of social infrastructure development such as education, public welfare, housing, culture etc. As BTL being still in premature phase, thus it is lack of knowledge in BTL and there is no such studies about problems and impacts of BTL projects. However, there could be so many problems underlying within BTL projects. Therefore, the purpose of this paper is to identify various risk factors during implementation of BTL projects. For this purpose, five BTL undertaking projects were studied. Field survey was conducted based-on interview instruments. Prevailing risk factors in operating the BTL Project were collected from the both officials of project promoters and concessionaires. In addition, a distinct need has emerged for analysis of risk factors for BTL projects. Based on real cases, this study resulted in risk factors influencing every phases and grouped risk factors into each phase. Moreover, this study also perform sensitivity analysis in order to know how risk factors affect to BTL projects. From analyzing the data, the study addresses that both major BTL project participants 'the competent authority' and 'Special purpose company(SPC)' have many problems and difficulties to operate the projects.

A study on the Obstacle Reasons in the Process of BTL Projects in School Facilities (학교 BTL사업 추진 저해요인의 고찰)

  • Kim, Jin-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.204-205
    • /
    • 2013
  • The rational Management of the school facilities will be able to minimize the waste of budgets, enhance total values of facilities. The purpose of this study is to propose promotion plans of the private infrastructure investment in the school facilities not only for contemplating obstacle reasons of BTL projects, but also for gripping contents about process of BTL projects. To achieve these objectives, this study 1)analyzes the major trend about private infrastructure investment, and 2)suggest extended suggestions for minimizing problems in the process of BTL projects in school facilities.

  • PDF

Analysis of Project Management Firms' Characteristics in BTL Projects (BTL사업 PM사의 특성 분석 연구)

  • Lee, Hyun-Ki;Kim, Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.230-233
    • /
    • 2007
  • As a new form of the public procurement method, that is BTL(Build-Transfer-Lease) was introduced in 2005, it has consequently created a new form of emerging business, so called BTL Project Management firms. As a key participant of BTL projects, PM firms play an important role in securing the projects. But due to the short history of BTL, the identity of BTL PM firms has not been widely understood. The objective of this paper is to investigate major characteristics of BLT PM firms for better understanding of the emerging business.

  • PDF

A Sensitivity Analysis for Risk Management of Private Investment Projects - Focused on BTL Projects - (민자유치사업의 리스크 관리를 위한 민감요인 분석 - BTL 사업을 중심으로 -)

  • Kim, Sun-Kuk;Park, Tong-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.168-175
    • /
    • 2006
  • Since the partly changed 'Private Investment Act for Social Infrastructure Projects' set forth in January 2005, the number of BTL(Build-Transfer-Lease) projects offered to the market has rapidly increased. The scope of BTL projects offered covers not only legally defined facilities but several facilities for the private schools. A BTL project, by definition, is a way of project management that includes the entire process of development such as planning, design, construction and operation over the period of 20-30 years. As a result, various types of risk may happen at each stage of the project and it is extremely important to efficiently control the sensitive factors that affect the risk profiles of the project. The examples of the sensitive factors are construction cost, interest rate, discount rate, lease amount, rental fee, O&M cost and so on. This study examines the characteristics of these sensitivity factors, analyzes their impact on the project feasibility and suggests the alternatives to manage them efficiently.

Improvement of Concessionaire Designation Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects (BTL사업의 사업시행자 선정 평가기준개선에 관한 연구)

  • Shin, Hyun-In;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.121-131
    • /
    • 2006
  • Since "Act on Private Participation in Infrastructure" were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation In Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of concessionaire. However, score for cost is likely to influence designating concessionaire to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for designating concessionaire in BTL projects, and proposed improvement program by doing questionnaire over specialists of each field.

Indicator of Facility Performance Evaluation (FPE) for Educational Facilities of BTL Projects

  • Lee, Kwan-Jong;Lee, Chun-Kyong;Park, Tae-Keun
    • Architectural research
    • /
    • v.14 no.1
    • /
    • pp.35-44
    • /
    • 2012
  • Build-Transfer-Lease (BTL) was introduced to the domestic construction market in 2005. Now, seven years later, the BTL model is most active for educational facilities. In 2011, 93 educational facility projects entered the maintenance stage. Considering the characteristics of today's BTL projects for educational facilities, the main issues are the initial performance and maintenance of educational facilities and the service-providing status for the 20-year operational management period, in relation to providing safety and convenience to students, the facility users. Seeking a solution, local education offices and departments in charge of BTL under the Ministry of Education, Science, and Technology have been exploring various methods of evaluating operational maintenance performance from various perspectives. For educational facility BTL projects, however, the appropriateness of initial operation performance evaluation, rather than considering the 20-year operational management period, is controversial in regards to sustainability. On this account, performance evaluation items in four areas-operational maintenance evaluation, facility performance status evaluation, maintenance subject evaluation, and sustainable change response evaluation-should be extracted. An indicator of facility performance evaluation is presented in this study through an AHP survey targeting experts, as part of establishing an operation performance evaluation system for educational facility BTL projects.

Development of Evaluation Methodology on the Performance of BTL Sewer Rehabilitation Projects (하수관거정비 BTL사업의 효과분석 및 방안 수립 연구)

  • Song, Ho-Myeon;Cho, Jeong-Il;Ahn, Choong-Hee
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.6
    • /
    • pp.743-751
    • /
    • 2010
  • It requires an interim performance assessment for BTL business of the sewerage rehabilitation which continues from 2005 till now. Means, It is necessary to make an interim performance assessment and an analysis of an business effect of the sewerage rehabilitation BTL projects which still continues, and we presented an improvement method of the new sewerage rehabilitation project in future. This paper has conducted an analysis of the business effect for 3 local government BTL projects which are completed and under operation as of now in Jincheon-Gun, Cheongju-Si and Gangjin-Gun. As a method of business effect analysis, we conducted a business effect of the 3 places using the index set which we previously set for the business effect analysis. The index set in this research was sectionalized to an improvement effect of operating wastewater treatment plant, an benefit effect of the direct cost, an benefit effect of the indirect cost and an environment friendly effect. We, in this paper, conducted an business effect analysis for 3 sewerage rehabilitation BTL projects which are completed or under operation recently as a demonstration, however we judge that an business effect analysis shall be conducted in a stage that a significant time for operation has passed since the completion of the construction in order to induce an actual business effect of the sewerage rehabilitation BTL project.