• Title/Summary/Keyword: BTL

Search Result 200, Processing Time 0.03 seconds

Analysis on the Welfare Effect of the PPP Implementation (민간투자사업의 후생효과 분석)

  • Kim, Jungwook;Moon, Weh-Sol
    • KDI Journal of Economic Policy
    • /
    • v.35 no.3
    • /
    • pp.1-38
    • /
    • 2013
  • This study investigates the welfare implications of BTL projects using a general equilibrium model with the public sector and public-private partnerships. We show that when the government is not allowed to run budget deficits but private firms is able to overcome the financial constraint, BTL projects performed by public-private partnerships (PPPs) could be a good alternative and improve the welfare of the model economy. This paper quantitatively investigates excessive expansion of PPP projects and several alternatives to retrieve welfare losses caused by such an expansion. Assuming that future rents of BTL projects are not taken into account, we find the welfare losses up to 20 percent relative to conventional government projects. Finally, we show that it would be possible to reduce the losses by transforming the fully depreciated capital stock of the government projects into much smaller new PPP projects.

  • PDF

A Study on Diversification of Financing Method for BTL Private Participation in Infrastructure by Introduction of ABS (자산유동화증권 도입을 통한 BTL 민간투자사업에서의 재원 조달 다양화 방안 연구)

  • Park, Young-Min;Kim, Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.378-383
    • /
    • 2006
  • This study presents the results from an investigation into ABS to revitalize small and medium construction enterprises, and to analyze merits and demerits of ABS introduction using sensitivity analysis some realistic cases. According to some available procedures, this study suggests ABS introduction structure of new education facilities construction in BTL projects of two different types. In order to analyze the effectiveness of introduction, a model was built as new education facilities construction in this paper. In addition, this study tried to put a figure on finance interest changes by analyzing changes for earning rates and money that payed by the government. Moreover, this study also presents merits and demerits of ABS introduction.

  • PDF

A Study on the Analysis of Issue Items on Negotiation Stage of Build Transfer Lease Project (건축분야 임대형 민자사업 협상단계 쟁점 분석에 관한 연구)

  • Park, Yeong-Cheol;Lee, Gun;Lee, Hyun-Chul;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.57-66
    • /
    • 2009
  • This study aimed to find major issues on negotiations of the BTL project, to analysis the degree, and to investigate the underlying cause and propose solutions. Data were collected from authorities in charge and the companies which have participated in BTL projects. Also, the weights of major issues were analyzed using Analytic Hierarchy Process method(AHP), which uses pair-wise comparison between variables, and the degree of them were listed in the quantitative way. As a result, 4 part had each 2 reasons and others had one reason among 6 negotiation parts of first step. In addition, the solutions were indicated.

A Study on Deduction of Reasonable Inspection Time in Educational Facilities Based on Regression Analysis (회귀분석을 이용한 합리적인 교육시설물 점검시간의 산정 기준 도출에 관한 연구)

  • Seok, Hyun-Su;Cho, Chang-Yeon;Kim, Jae-On;Son, Jae-Ho
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.14 no.4
    • /
    • pp.34-42
    • /
    • 2007
  • The investment of BTL(Build-Transfer-Lease) projects for the educational facilities has been increased since 2005. However, many trial errors and problems have been occurring due to the lack of inspection criteria in maintenance cost for the lift cycle of the facilities. Thus, purpose of this study is to derive regression equation for the daily inspection and the regular inspection through analysis of CAD data in order to set the inspection criteria. It is possible to calculate economical maintenance cost of BTL project in educational facilities using criteria of inspection time through the regression equation developed in this study.

A Study on School Facilities Build Transfer Lease Project - Centering on the improvement of the assessment - (학교시설 임대형민자사업의 평가기준 개선연구)

  • Kwon, Byoung-Koo;Lee, Jae-Rim;Jo, Jin-Il
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.7 no.2
    • /
    • pp.30-46
    • /
    • 2008
  • In this study, were prepared after statistical analysis was conducted of assessment items and marks distribution for the selection of executors of the BTL project. When tests of the degree of dispersion and degree of appropriateness for each assessment item were analyzed, it was found that the degree of dispersion among assessment points has the power of discrimination since it is highly marked in the design field and operation management field. In contrast, 'business management plan' and 'investment composition for economic quality assessment' have a low level of the power of discrimination since points given to them have smaller difference between business projects.

  • PDF

on the Risk Analysis of Project Finance in BTL Project (주거부문(住居部門) BTL사업(事業)에서 프로젝트금용의 위험분석(危險分析)에 관한 연구(硏究))

  • Song, Kyu-Ryol;Jung, Eul-Kyu;Im, Chil-Soon
    • Journal of the Korean housing association
    • /
    • v.17 no.6
    • /
    • pp.83-90
    • /
    • 2006
  • The purpose of this study is to apply efficiently a successful Project Finance in BTL. To use Project Finance, it is necessary to Risk Analysis of each work step. This Risk Analysis have to repeatedly progress in overall Project Process. The differences between Corporate Finance and Project Finance are remarkably appeared in Risk Allocation and Limited Resource. To use successful Project Finance in construction industry, first, raising project confidence, second, technical : economical : lawful evaluation by Finance Expert, third, Income Guarantee for Lender or Consortium of Lending Banks, forth, Leverage Effect of Project Sponsor must be preceded.

A STUDY ON DEVELOPING THE CALCULATION SYSTEM OF DISBURSEMENT FOR GOVERNMENT ON THE BTL PROJRCTS

  • Chun-Kyong Lee;Tae-Keun Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.649-657
    • /
    • 2009
  • BTL projects, which has been 3 years since it was carried out in 2008, trigged the controversy on the adequacy in the calculation of disbursement for Government due to such problems as low earning rate and the burden of service level compared with the project suggestion. Thus, the purpose of this study is to offer a suggestion on the calculation system for the purpose of the standardized - expense appropriation by item and database including the antecedent study on the finance model and the feasibility in BTL projects. The system is composed of 4 steps - project management, basic database, an analysis on expense by item and the result, and an analysis on sensitivity, and it is possible to carry out a comparative analysis on single and multi alternatives by variable change along with the ground on expense calculation.

  • PDF

A Study on Efficiency of Mixed Model (BTO+BTL) for Public-Private Partnership Projects (민간투자사업 혼합방식(BTO+BTL)의 효율성에 관한 연구)

  • Kim, Do-Il;Jin, Run-Zhi;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.53-63
    • /
    • 2012
  • Korean Public-Private Partnership, mainly implemented using BTO (Build-Transfer-Operate) and BTL (Build-Transfer-Lease) methods, has contributed in increasing benefits of the people by providing the needed public services in a timely and efficient manner. It has also induced flexible national fiscal management. However, in addition to the repeal of the Minimum Revenue Guarantee (MRG) program in 2009, changes in business environment including recent financial crisis aggravated financial situation in pursing PPPs, resulting in significant contraction of BTO projects. Therefore, the new methods are to be suggested and applied to overcome this situation. This paper seeks to find ways to apply "Mixed Model," characterized as the compound of BTO and BTL, two different implementation methods of PPPs, as an enhanced burden-sharing mechanism.