• Title/Summary/Keyword: BPM6

Search Result 119, Processing Time 0.026 seconds

Correlationship with Selecting Business Process and Strategy for BPM of Construction Company (건설기업의 BPM도입 대상 업무선정과 기업전략의 상관성)

  • Cho, Hang-Min;Song, Young-Woong;Lim, Hyung-Chul;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.28-39
    • /
    • 2009
  • Recently, it has been an issue on BPM(Business Process Management, below BPM), which is a sort of business management methods that secures agility and flexibility through sustainable improving and monitoring in a rapid-changing environment. To introduce BPM to construction company we need to set up a procedure for objective, define criteria according to the business structure defined by BPA(Business Process Architecture, below BPA) and analyze works and then select targets. Those BPM target works need to have a close relationship with corporate strategy and to support realizing corporate value. Therefore, this paper will study BPM Target works of construction companies for an effective introduction BPM through questioning from working-level staff. In addition, it will analyze their types and corporate core strategy and BPM target works, then study the main strategy according to BPM target types. And also, this study is expected to help construction companies to choose the business for BPM adoption through analyzing current situation and strategy for business selection when adopting BPM.

Integration of Six Sigma and BPM for Continuous Process Improvement (지속적 프로세스 개선을 위한 6시그마와 BPM 통합 모형)

  • Yoon, Ji Hyun;Jung, Jae-Yoon
    • The Journal of Bigdata
    • /
    • v.2 no.1
    • /
    • pp.5-15
    • /
    • 2017
  • Six Sigma has been adopted for the last two decades in many industries of manufacturing and service business to implement processs improvement. The methodology has difficulties in discovering target projects in the Define step and in controlling continuous measure and control in the Control step. To address the problem, more advanced system is required to support continuous control and management, and business process management (BPM) can be an effective solution for this problem. In this research, we introduce integrated models of Six Sigma and BPM for the purpose of realizing continuous process improvement, and explain the procedure of analyzing, improving, and monitoring the processes based on the data which has been accumulated in business process execution. It is expected that this integrated approach can maximize business performance by improving and managing business continuously on the integrated platform of two business innovation strategies, Six Sigma and BPM.

  • PDF

Change Drivers and Advance of Business Process Management Model for Construction Companies (건설기업의 업무 프로세스 경영 모델의 변화와 발전방향)

  • Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.194-203
    • /
    • 2008
  • Construction companies require management system to increase efficiency and profit because of receiving competition and globalizing business environment. Since 1990s, construction companies have made various attempts to innovate business structure both internally and externally by means of BPR, 6 Sigma, PI, and Workflow. Some improvements were made, but most of them were temporary, and insufficient to provide the much-needed promptness of business process in responding to the changes. Furthermore, the recent methods of applying BPM and practical using are limited to the theory and method of other industries, and also the attempts of applying BPM in construction industry are at the stage of theoretical approaching and examining in a few construction companies. Accordingly, this study deduces the necessity of adopting BPM based on change of business paradigm for construction companies and limits of current researches, failure causes and problems of application attempts of BPM and process management. And also, we analyze Advance of BPM and suggest the application method of business process management model for construction companies.

An Example of ISO 9001 Quality Management System based on BPM (BPM을 기반으로 한 ISO 9001 품질경영시스템 구축)

  • Kim Sang-Kuk;Shin Sung-Ho
    • The Journal of the Korea Contents Association
    • /
    • v.6 no.4
    • /
    • pp.38-45
    • /
    • 2006
  • Most organizations adopt a process-based approach to manage their operations and now business process management(BPM) is a well-established concept. Because ISO 9001:2000 has been influenced by BPR and it also emphasizes process based, BPM can get together with ISO 9001:2000. Korea Institute of Science and Technology Information has taken ISO 9001:2000 certificate in November 11, 2003 and has implemented quality management systems based on BPM. We call it KQMS(KISTI Quality Management System). KQMS based on BPMS is a new example in field of ISO quality management and is expected to support process management well.

  • PDF

A Study How to Decide the Priority on Selecting Business Process for BPM to Attain Strategic Goal of Construction Company (건설기업의 전략지원을 위한 BPM 우선적용 프로세스 선정에 관한 연구)

  • Lee, Doo-Hee;Song, Young-Woong;Lim, Hyung-Cheol;Park, Tae-Keun;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.16-28
    • /
    • 2010
  • Construction companies are fulfilled in according to project, and it is difficult to execute the standardized process in various construction projects. Thus many construction companies is adopting BPM(Business Process Management) that meet business process change and business improvement. However, it is difficult to apply BPM in a lump because of difference of BPM characteristics and company's strategies. For this reason, it is desirable to select business process based on company's priority. This study indicated need of method for selecting business process through studying current researches, and made BPA for construction company by analyzing business process in construction company. Moreover, this study indicated core business process from a point of profitability and growth view through grasping strategic goal priority. And also, it proposed criteria for process evaluation for BPM adoption, evaluated core business process, and indicated prior business process for BPM adoption.

A Condition Rating Method of Bridges using an Artificial Neural Network Model (인공신경망모델을 이용한 교량의 상태평가)

  • Oh, Soon-Taek;Lee, Dong-Jun;Lee, Jae-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.71-77
    • /
    • 2010
  • It is increasing annually that the cost for bridge Maintenance Repair & Rehabilitation (MR&R) in developed countries. Based on Intelligent Technology, Bridge Management System (BMS) is developed for optimization of Life Cycle Cost (LCC) and reliability to predict long-term bridge deteriorations. However, such data are very limited amongst all the known bridge agencies, making it difficult to reliably predict future structural performances. To alleviate this problem, an Artificial Neural Network (ANN) based Backward Prediction Model (BPM) for generating missing historical condition ratings has been developed. Its reliability has been verified using existing condition ratings from the Maryland Department of Transportation, USA. The function of the BPM is to establish the correlations between the known condition ratings and such non-bridge factors as climate and traffic volumes, which can then be used to obtain the bridge condition ratings of the missing years. Since the non-bridge factors used in the BPM can influence the variation of the bridge condition ratings, well-selected non-bridge factors are critical for the BPM to function effectively based on the minimized discrepancy rate between the BPM prediction result and existing data (deck; 6.68%, superstructure; 6.61%, substructure; 7.52%). This research is on the generation of usable historical data using Artificial Intelligence techniques to reliably predict future bridge deterioration. The outcomes (Long-term Bridge deterioration Prediction) will help bridge authorities to effectively plan maintenance strategies for obtaining the maximum benefit with limited funds.

Analysis of Business Process in the SCM Sector Using Data Mining (데이터마이닝을 활용한 SCM 부문에서의 비즈니스 프로세스 분석)

  • Lee, Sang-Young;Lee, Yun-Suk
    • Journal of the Korea Society of Computer and Information
    • /
    • v.11 no.6 s.44
    • /
    • pp.59-67
    • /
    • 2006
  • If apply BPM that is a business process management tool to SCM sector, efficient process management and control are available. Also, BPM can execute integrating process that compose SCM effectively. These access method does to manage progress process of SCM process more efficiently and do monitoring. Also, It is can be establish plan about improvement of process analyzing process achievement result. Thus, in this paper, introduce this BPM into SCM environment. Also, SCM process presents plan that executes integration and improves business process effectively applying data mining technique.

  • PDF

An Iterative Two-Dimensional Equalizer for Bit Patterned Media Storage Systems Based on Contraction Mapping (비트 패턴 미디어 저장장치를 위한 축약사상 기반의 반복적 2차원 등화기)

  • Moon, Woosik;Im, Sungbin;Park, Sehwang
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.50 no.6
    • /
    • pp.3-8
    • /
    • 2013
  • Bit patterned media (BPM) storage is one of the promising technologies to overcome the limitations of the conventional magnetic recording. However, there are some problems in a high areal density BPM storage, inter-track interference, inter-symbol interference and noise which are severely degrading performance of the system with reducing the bit error rate. In this paper, we present a simple iterative two-dimensional equalizer based on the contraction mapping theorem to mitigate these adverse effects. Furthermore, we examine that the channel characteristics of the proposed two-dimensional equalizer satisfies the convergence conditions. In the simulation we demonstrate the bit separation characteristics of the one-dimensional equalizer and the two-dimensional equalizer and evaluate the BER performance of the proposed equalizer comparing with the conventional equalizers. According to the results of experiments, the proposed equalizer is an promising equalizer with maintaining proper complexity for a high areal density BPM storage.

Development of a Pacemaker with a Ventricular Assist Device for End-Stage Heart Failure Patients (말기 심질환 환자를 위한 심실보조장치용 심박조율기의 개발)

  • Kim, Yoo-Seok;Park, Sung-Min;Choi, Seong-Wook
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.35 no.11
    • /
    • pp.1205-1211
    • /
    • 2011
  • In this paper, we developed a pacemaker that can increase the efficacy of a left ventricular assist device (LVAD) and increase the survival rate for patients suffering end-stage heart failure. Because LVAD patients can experience arrhythmia, the pacemaker incorporated into the LVAD has the important role of sustaining sufficient blood circulation during arrhythmia. The electrode of the pacemaker is located at the apex of the left ventricle, where the VAD's inlet cannula is connected. This is efficient placement, in that the electrode can transmit electrical stimulation directly to the Purkinje fibers of the myocardium. The pacemaker can change the stimulation rate from 0 bpm to 191.4 bpm when a button is pressed on the external control module, and the pacemaker normally stimulates the heart at 60 bpm with 0.25 J of energy. We performed animal experiments to evaluate the performance and reliability of the combination of the LVAD and pacemaker. At pacemaker stimulation rates of 86.4 bpm, 100.2 bpm, 126.6 bpm, we recorded the ECGs, aortic pressures, and flow rates to analyze the heart loads.

Design and Construction of Collaboration Hub 2.0 based on BPM (BPM 기반의 협업허브 2.0 설계와 구현)

  • Kim, Bo-Hyun;Jung, So-Young;Choi, Hon-Zong;Lee, Sung-Jin;Jang, Jin-Young
    • Korean Journal of Computational Design and Engineering
    • /
    • v.16 no.6
    • /
    • pp.414-423
    • /
    • 2011
  • The collaboration hub has been developed since 2004 as an online collaboration space, which supports the various collaborative works amongst small and medium enterprises using information sharing, collaboration project management, and project history management. Because of the change of manufacturing environment and rapid development of information technologies, it should be evolved from the existing version called Collaboration Hub 1.0. Recently, a lot of manufacturing enterprises know the importance of business process management(BPM) and start to introduce BPM systems. Our research group has developed the new version of Collaboration Hub 1.0 called Collaboration Hub 2.0 which contains the BPM concept, the consistent product data management, and the specialized functions overcoming the various variation of manufacturing. This study scrutinizes the meaning and role of the Collaboration Hub 2.0 and introduces an application study of it to the value chain of automobile module development consisted of a leading company and subcontractors. The case study covers the definition, execution and monitoring of collaboration process, the specialized functions overcoming the manufacturing variation and the key performance index of collaboration business.