• Title/Summary/Keyword: BOD/COD removal

Search Result 291, Processing Time 0.026 seconds

Performance of Night Soil Treatment Plant using B3(Bio-Best-Bacillus) System (B3공법을 이용한 분뇨처리시설 처리효율에 관한 연구)

  • Seo, Yun-Ha;Lee, Jung-Bong;Choi, Sung-Yong;Kim, Deug-Ho;Kim, Jin-Hwan;Byeun, Jeung-Bok
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.4
    • /
    • pp.407-412
    • /
    • 2010
  • The purpose of this study was to investigate removal efficiencies of contaminants in night soil treatment plant using the B3 system. The samples were collected from retaining tank and settlement tank in Yechon night soil plant. We experimented concentrations of BOD, COD, SS, TN and TP. Concentration data were processed using removal efficiencies by season and correlation analysis with pilot running parameters. Removal efficiencies of total organic carbon was over 96%, TN was 98% during summer, 80.9% during winter. In the case of TP, the highest removal efficiencies was 94.1% during fall and the lowest removal efficiencies was 82% during spring. Results of correlation analysis showed two positive correlation groups and one negative group. Positive correlations were among temperature, BOD and TN. The others were pH, BOD, COD, SS, TN and TP. Negative correlation were among MLSS, BOD, COD, SS, TN, TP.

Performance of GACC and GACP to treat institutional wastewater: A sustainable technique

  • Khaleel, Mohammed R.;Ahsan, Amimul;Imteaz, M.;El-Sergany, M.M.;Nik Daud, N.N.;Mohamed, T.A.;Ibrahim, Buthainah A.
    • Membrane and Water Treatment
    • /
    • v.6 no.4
    • /
    • pp.339-349
    • /
    • 2015
  • Experiments were carried out using granular activated carbon (GAC) adsorption techniques to treat wastewater contaminated with organic compounds caused by diverse human activities. Two techniques were assessed: adsorbent GAC prepared from coconut shell (GACC) and adsorbent GAC from palm shell (GACP). A comparison of these two techniques was undertaken to identify ways to improve the efficiency of the treatment process. Analysis of the processed wastewater showed that with GACC the removal efficiency of biochemical oxygen demand (BOD), chemical oxygen demand (COD), turbidity, total suspended solids (TSS) and total dissolved solids (TDS) was 65, 60, 82, 82 and 8.7%, respectively, while in the case of GACP, the removal efficiency was 55, 60, 81, 91 and 22%, respectively. It can therefore be concluded that GACC is more effective than GACP for BOD removal, while GACP is better than GACC for TSS and TDS removal. It was also found that for COD and turbidity almost the same results were achieved by the two techniques. In addition, it was observed that both GACC and GACP reduced pH value to 7.9 after 24 hrs. Moreover, the optimal time period for removal of BOD and TDS was 1 hr and 3 hrs, respectively, for both techniques.

Evaluation of Pollutant Removal Efficiency in Environmentally Friendly Full-scale Constructed Wetlands for Treating Domestic Sewage during Long-term Monitoring (장기 모니터링을 통한 환경친화형 인공습지 하수처리장의 수질정화효율 평가)

  • Seo, Dong-Cheol;Jo, In-Seong;Lim, Seok-Cheon;Lee, Byeong-Ju;Park, Seong-Kyu;Cheon, Yeong-Seok;Park, Jong-Hwan;Lee, Hong-Jae;Cho, Ju-Sik;Heo, Jong-Soo
    • Korean Journal of Environmental Agriculture
    • /
    • v.28 no.2
    • /
    • pp.97-105
    • /
    • 2009
  • A constructed wetland which was composed of aerobic and anaerobic areas was evaluated for 3 years to effectively treat the sewage produced in farming and fishing communities. For 3 years in a constructed wetland, biochemical oxygen demand(BOD), chemical oxygen demand(COD), suspended solids(SS), total nitrogen(T-N), and total phosphorus(T-P) in effluent were 0.2${\sim}$11.8, 1.0${\sim}$41.9, 1.1${\sim}$6.5, 4${\sim}$60 and 0.02${\sim}$3.51 mg/L, respectively. Removal rate of BOD, COD and SS in effluent were 97, 92 and 99%, respectively, in the third year. As time goes by, removal rate of T-N and T-P in treated water in aerobic area and effluent were gradually increased in a constructed wetland. In the third year, removal rate in effluent were 62 and 73%, respectively. By the seasons, removal rate of BOD, COD, SS, T-N and T-P were 97${\sim}$98, 87${\sim}$91, 99, 43${\sim}$61 and 76${\sim}$86%, respectively. Removal rate of BOD, COD, SS and T-P were not affected by the seasons, but that of T-N in winter and spring were decreased than the other seasons.

Application of $ENVIS^{(R)}$ MEMBRANE SYSTEM (Sumerged flat Sheet MF Membrane) ($ENVIS^{(R)}$ MEMBRANE SYSTEM (평판형 정밀여과막)의 침지식 수처리 공정 적용에 관한 연구)

  • Lee, Young-Moo;Jang, Jae-Young
    • Membrane Journal
    • /
    • v.15 no.3
    • /
    • pp.241-246
    • /
    • 2005
  • This study is investigated for the applications of MBR SYSTEM using $ENVIS^{(R)}$ which is a submerged flat membrane for treatment of sewage and wast water. The experiment was practiced on the scene of labor that are sewage facilities of factories $(10\;m^3/day)$ and wast water treatment plant $(30\;m^3/day)$ using equipments made by Pure-Envitech Co., LTD. SS, BOD and COD for the result of removal efficiency at the sewage facilities of factories were $99.7\%,\;97.6\%$, and $96.8\%$, rspectively. SS, BOD and COD for the result of removal efficiency at the waste water treatment plant were $99.6\%,\;95.6\%,\;and\;80.3\%$, respectively.

Water Purification Characteristics of Sedimentation Basin for Agricultural Water Quality Improvement (농업용수 수질개선을 위한 침강지의 수질정화 특성)

  • Kim, Hyungjoong;Kim, Donghwan
    • KCID journal
    • /
    • v.21 no.1
    • /
    • pp.55-63
    • /
    • 2014
  • A sedimentation basin for agricultural water quality improvement was researched to analyze the water quality purification characteristics. The sedimentation basin constructed at the inlet of Gamdon reservoir in Muan-gun, Jeollanam-do was selected as the research field of this study. The surface area of the sedimentation basin is $34,000m^2$, volume is $122,000m^3$, and hydraulic retention time is 0.3hr~7.3day. The average influent loading of SS was 156.6kg-SS/d, and the effluent loading was 67.5kg-SS/d with the average removal rate of 56.9%. The average influent loadings of BOD and COD were 33.0kg-BOD/d and 60.3kg-COD/d respectively, and the effluent loadings were 26.4kg-BOD/d and 48.6kg-COD/d with the average removal rate of 20.1% and 19.3% respectively. Therefore, the results of this study show that a sedimentation basin can purify SS and organic matters. The average influent loadings of T-N and T-P were 28.7kg-TN/d and 2.97kg-TP/d respectively, and the effluent loadings were 16.3kg-TN/d and 1.41kg-TP/d with the average removal rate of 43.0% and 52.6% respectively. In conclusion, the overall results of this study show that a sedimentation basin is a feasible alternative to purify organic matters and nutrients.

  • PDF

Application of Modified Sericite for Dyeing Wastewater Treatment (개질한 sericite를 이용한 염색공장 폐수처리)

  • Choi, Hee-Jeong
    • Journal of Environmental Science International
    • /
    • v.24 no.9
    • /
    • pp.1189-1197
    • /
    • 2015
  • The aim of this study was to investigate the nutrient removal using Mg-Sericite flocculant in the dyeing wastewater. Mg-Sericite flocculant was removed successfully > 98% of the Color, SS. COD and BOD in the dyeing wastewater at the following optimal Mg-Sericite dosage: 100 mg/L for Colour and SS, 300 mg/L for BOD and COD. The removal of TN and TP was obtained 92.00% with 50 mg/L and 87.80% with 100 mg/L Mg-Sericite dosage, respectively. These results was indicated that the amount of 0.79~1.31, 0.22~0.37, 0.5 and 0.16 mg/L Mg-Sericite was necessary for 1 mg/L removal BOD, COD, TN and TP, respectively. The biopolymer, Mg-Sericite, can be a promising flocculants due to its high efficiency and low dose requirements. In addition, Mg-Sericite does not contaminate treated wastewater, which can be recycled to reduce not only the cost and the demand for water but also the extra operational costs for reusing wastewater. This flocculation method is helpful to lower the wastewater treatment cost.

Water Purification Properties of Porous Zeolite Concrete (다공성 제올라이트 콘크리트의 수질정화 특성)

  • Choi, Min Ji;Sung, Nack Kook;Park, Sung Jae;Lee, Jung Ah;Yun, Hong Su;Hong, In Kwon
    • Applied Chemistry for Engineering
    • /
    • v.22 no.3
    • /
    • pp.332-335
    • /
    • 2011
  • As our interests in eco-friendly materials have been significantly increased, the utilization of porous zeolite concrete that has structural functionality and permeability has been increased. In this paper, the mixture of porous concrete and zeolite, which can be used as multirole boulders, was investigated for the suitability of an environment-friendly product by evaluating of the water purification ability. The contamination removal rates of BOD, TOC, T-N, and T-P in stagnant water tank were 70.6, 67.0, 57.7, and 50.6%, respectively. Also for the non-point source pollution with the inflow and the outflow, the removal rates of Zn, Pb, BOD, and COD were 99.9, 90.0, 69.2, and 33.5%, respectively. The performance of the heavy metal contamination removal for the porous zeolite showed better than that of stagnant system. Therefore, it is expected that the installation of the porous zeolite concrete can play a role as an eco-friendly products by its high contamination removal.

Treatment Characteristics of Paper-mill Wastewater Using Pure Oxygen Activated Sludge Process (순산소 활성오니 공정을 이용한 제지폐수의 처리특성)

  • Kim, Sung Soon;Chung, Tai Hak
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.13 no.4
    • /
    • pp.27-34
    • /
    • 1999
  • An experimental study on improvement of the paper-mill wastewater treatment using the pure oxygen activated sludge process was conducted. The effects of hydraulic retention time(HRT) and BOD loading on organic removal efficiency were investigated. The BOD removal efficiencies were above 90% under all examined HRTs except for HRT of 3 hours. The increase of HRT from 3 hours to 6 hours, and to 12 hours significantly improved BOD and COD removal efficiencies, respectively. However, additional increase of HRT did not affect organic removal efficiency. F/M ratio change at fixed HRT did not affect organic removal efficiency. However, F/M ratio investigated in this study(0.11~1.98kgBOD/kgMLVSS/day) was 5 times greater in maximum than that of conventional activated sludge process, which implies that pure oxygen activated sludge process can treat wastewater with high organic strength. Under the same HRT, the volumetric BOD loading change cause no effect on organic removal efficiency also.

  • PDF

Treatment Efficiency of Existing Forms of Pollutants in Sewage Treatment Plant by Natural Purification Method (자연정화공법에 의한 하수처리장에서 오염물질의 존재형태별 처리효율)

  • Seo, Dong-Cheol;Lee, Byeong-Ju;Hwang, Seung-Ha;Lee, Hong-Jae;Cho, Ju-Sik;Lee, Sang-Won;Kim, Hong-Chul;Heo, Jong-Soo
    • Korean Journal of Environmental Agriculture
    • /
    • v.25 no.2
    • /
    • pp.129-137
    • /
    • 2006
  • A study was conducted to investigate the behavior of pollutant forms at each area in the sewage treatment plant by natural purification method. The sewage treatment plant by natural purification method that consisted of aerobic and anaerobic area was constructed. The efficiency of sewage treatment depending on the operation time, the loading amount of pollutant season variation were investigated. The removal amount of BOD, COD, TOC and SS in the aerobic area was significantly increased as the treatment proceeded. Decreased BOD, COD, TOC, SS, T-N and T-P depending on the loading amount of pollutants in the aerobic and ananerobic area were mostly insoluble BOD (IBOD), insoluble COD (ICOD), soluble TOC (STOC), volatile SS (VSS), dissolved T-N (DTN) and dissolved T-N (DTP) types, respectively. The removal efficiency of BOD, COD, TOC, SS, T-N and T-P in hot season (summer and autumn) were more than that in cold season (spring and winter). The removal efficiencies of BOD, COD, TOC, SS, T-N and T-P of the effluent were about 92, 89, 73, 95, 46 and 84% in all seasons, respectively.

A Study on Biodegradability of Various Dyeing Auxiliaries (각종 염색조제의 생분해성에 관한 연구)

  • 류원률;이호경;이영호;신현철;최장승;이기풍;조무환
    • Textile Coloration and Finishing
    • /
    • v.10 no.6
    • /
    • pp.42-48
    • /
    • 1998
  • For the effective operation of complex dyeing wastewater treatment plant, the biodegradability of various dyeing agents were investigated. For experiments in biodegradability, activated sludge from aeration tank of wastewater treatment plant was used. Biodegradability of dyeing agents were compared by measuring the $BOD_5/COD_{Cr}$ ratios and $BOD_5$ removal efficiency. $COD_{Cr}$. removal efficiency of dyeing agents was less than 80% , while $BOD_5$ removal efficiency was less than 60% after of days. Therefore, biodegradation by activated sludge were found very difficult. Judging from this, it is necessary to isolate strains biodegrading dyeing agents in order to operate activated sludge process safely.

  • PDF