Fine Dust in Korea has been classified as a social disaster since 2019 due to continuous increase in concentration of Particulate Matter 10(PM 10) and PM 2.5. The fine dust issue has negative physical and mental impacts, especially on vulnerable population including children and the elderly. Seoul metropolitan government have installed fine dust shelters since 2019. However, there is a lack of research that evaluates spatiotemporal distribution of these facilities. Therefore, the first aim of this study is to find the relationship between PM levels and dust scattering construction sites, or air pollutant emission sites through in depth spatial analyses. The second purpose is to analyze the spatial distribution of PM shelters in Seoul, and to evaluate the location efficiency of them. Kernel density, krigging, and network analyses were conducted, and floating population was considered instead of census data for this research. The reults of network analysis based on the road system showed that Yangcheon-gu, Songpa-gu, Seongbuk-gu, and Dobong-gu were found to need additional fine dust shelters. Also, the results from analyzing the floating population that includes children and the elderly showed that Songpa-gu, Seodaemun-gu, Gangdong-gu, Seocho-gu, and Dongdaemun-gu need more placements of find dust shelters. The results of this study are expected to provide implications for urban planners to enhance find dust shelter placement in urban areas, and vulnerable population issues would be considered in many ways.
Since the 1960s, the Korean Peninsula, which consists of 77.4 of the country's land and mountains, has seen a surge in demand for buildings due to population concentration due to urbanization and industrialization. Since then, the development of slopes has been inevitable due to the concentration and expansion of the city's population. When building a building on a slope, it is important to set the height of the surface. In this case, the means of regulating buildings in construction-related laws, such as the building closure ratio, floor area ratio, number of floors and total floor area of buildings, have an overall effect on buildings through the height of the surface. In the Korean Building Act, the setting of the height of the ground affects the calculation of the building height limit standard and the calculation of the underground floor, and it takes a long time to calculate. Therefore, the time required for attempts to change various design plans of buildings increases. The purpose of this study is to speed up the time required to calculate the weighted average of the surface when constructing buildings on slopes. In addition, the existing calculation process allows various design attempts compared to the same time given.
Kwon, Tae Ho;Park, Sang I.;Seo, Kyung-Wan;Lee, Sang-Ho
Journal of the Computational Structural Engineering Institute of Korea
/
v.31
no.6
/
pp.339-346
/
2018
An Industry Foundation Classes(IFC), which is a data schema developed focusing on architecture, is being expanded to civil engineering structures. However, it is difficult to create an information model based on extended IFC since the BIM software cannot provide support functions. To manage a railway track based on the extended IFC, this paper proposed a method to create an alignment-centered separated railway track model and convert it to an extended IFC-based information model. First, railway track elements have been classified into continuous and discontinuous structures. The continuous structures were created by an alignment-based software, and discontinuous structures were created as independent objects through linkage of the discretized alignment. Second, a classification system and extended IFC schema for railway track have been proposed. Finally, the semantic information was identified by using the property of classification code and user interface. The availability of the methods was verified by developing an extended IFC-based information model of the Osong railway site.
We have implemented data compression and reconstruction by using a fast Walsh transform. The ECG signals were generated by an ECG BimLllator (KONT- RON). The sampling frequency was 480 Hz and the data point number used was 512. In order to eliminate the 60 Hz noise and baseline drift, a digital notch filter was designed. We obtaine!1 a compression ratio of 5 : 1 and at this ratio it was possible to obtain a true diagnosis and an ECG morphology analysis.
Journal of the Korean Society of Industry Convergence
/
v.26
no.6_2
/
pp.1145-1153
/
2023
This study presents the development of pointcloud data integration technology in construction sites via drone photogrammetry and MMS LiDAR. The integration of pointcloud data from drones and MMS technology can provide precise and accurate 3D digital maps of construction sites, which can benefit the development of smart construction and BIM. The advantages of using both drones and MMS technology for pointcloud data acquisition in construction sites are discussed, along with the limitations and challenges of using drone photogrammetry and MMS LiDAR for pointcloud data integration. The results of this study can contribute to the advancement of pointcloud data integration technology in construction sites and improve the efficiency and accuracy of construction projects.
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.12
/
pp.660-668
/
2018
The main object of this study was to find a way to operate the marker for simulating a virtual construction using a MR(mixed reality) device. The secondary object was to find a way to extract the form-data from BIM data, and to represent the virtual object by the MR device. A tiny error of scale causes large errors of length because the architectural objects are very large. The scale was affected by the way that the camera of the MR device recognizes the marker. The method of installing and operating the marker causes length errors in the virtual object in the MR system. The experimental results showed that the error factor of the Virtual object's length was 0.47%. In addition, the distance between the markers can be decided through the results of an experiment for the multi-marker tracking system. The minimum distance between markers should be more than 5 m, and the error of length was approximately 23mm. If the represented virtual object must be less than 20mm in error, the particular mark should be installed within a 5 m radius of it. Based on this research, it is expected that utilization of the MR device will increase for the application of virtual construction simulations to construction sites.
자동차용 배터리는 초기 용량의 80% 이하가 되면 교체하게 되며, 근간 폐배터리의 수가 폭발적으로 증가할 것으로 예측되고 있다. 폐배터리의 폐기로 인한 환경 파괴를 방지하고 자원을 재활용하기 위해서 자동차에서 나오는 폐배터리를 에너지저장장치(ESS)로 재사용 하는 것에 대한 관심이 높아지고 있다. 폐배터리를 ESS로 재구성하기 위해서는 폐배터리 모듈의 그레이딩을 통해 비슷한 성능의 모듈끼리 모아서 구성하는 것이 매우 중요하다. 배터리 모듈 간의 불균형은 전체 시스템의 성능을 저하시키며, 따라서 비슷한 성능과 잔존 수명을 가진 모듈을 골라내는 일은 폐배터리의 재사용에 있어서 첫 번째 선결 과제가 된다. 본 연구에서는 폐배터리의 상태 및 잔존수명평가를 위해 배터리 모듈의 임피던스 스펙트럼을 측정할 수 있는 장비를 개발하였다. 폐배터리 모듈에 AC 섭동을 인가하고 이를 측정하여 임피던스 스펙트럼을 계산할 수 있는 하드웨어와 소프트웨어를 개발하였다. 개발 장비는 60V이하의 폐배터리 모듈의 임피던스 스펙트럼을 0.1Hz에서 1kHz까지 측정 가능하며, 측정 결과를 바탕으로 커브 피팅을 통해 등가회로의 파라미터도 계산할 수 있다. SM3에서 얻어진 폐배터리 모듈을 이용하여 측정한 임피던스 스펙트럼을 상용장비인 BIM2로 측정한 결과를 비교하였고, Reduced Chi-Square를 이용한 분석결과 두 데이터가 거의 일치함을 알 수 있었다.
Korean Journal of Construction Engineering and Management
/
v.9
no.3
/
pp.85-94
/
2008
The process of construction industry basically consists of many complicated phase, such as planning, design, construction, MO&R(Maintenance, Operation, and Repair), and deconstruction. And various participants communicate each other during every phase of process. Since construction components have become more complex and diverse recently, many researches on how to exchange and standardization of building. However, in Korea research on IFC(Industry Foundation Classes) which is a standard for international data exchange have been conducted with only study limited Issues, such as studies on the development of 2D extension model for IFC, researches on 3D or 4D based IFC extension, and etc. This stuff covers tests of the compatibility among commercial 3D CAD programs using IFC file format. Several problems of the current IFC model are retrieved as a result.
Journal of the Korea Society of Computer and Information
/
v.28
no.1
/
pp.79-86
/
2023
Construction is one of the oldest fields of providing human living comfort. However, despite the continuous development not only in IT but also in other fields, productivity degradation due to low automation is still serious. In particular, the use of the 4th industrial revolution technologies in construction is just beginning. Blockchain, which is one of the 4th industrial revolution technologies, is a type of a distributed database that is used to replicate, share, and synchronize data spread across different geographical locations, such as multiple sites, countries, or organizations. In this paper, we introduce the block chain and analyze use cases according to seven themes in construction. As a result of the analysis, it is expected to increase the understanding of blockchain in construction and provide usefulness for the development of various services in the future.
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.11
/
pp.86-93
/
2016
Information technology, such as IoT, Big Data, Drone, Cloud etc., is evolving every year. Information Society is changing Intelligence Society and Creative Society. A new Construction Projects Management System Roadmap is required because it is difficult to reflect the current IT environments based on the CALS(Continuous Acquisition & Life-cycle Support) master plan, which is performed to establish every five years since 1998. This study was prepared for the Roadmap with a focus on Construction Management System based on the 4th CALS master plan, which was performed to establish the 2012 year. To this end, the construction environment and several information systems were investigated and analyzed. The problems of the construction project information system were derived using SWOT analysis, the vision, goal, direction, strategy, main tasks, specific tasks, and timetable of the Construction Project Management System are presented. This roadmap is designed to be used as operational indicators of a future construction project management system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.