BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures (철근콘크리트골조 BIM기반 수량산출 및 견적 가이드라인 수립)

  • Joo, Seon U;Kim, Chee-Kyeong;Kim, Si-Uk;Noh, Jun-Oh
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.6
    • /
    • pp.567-576
    • /
    • 2017
  • The object of this research is an establishment of BIM-based quantity takeoff(QTO) and cost estimation guidelines for reinforcement concrete structures focused on improvement of field applicability in transition period from 2D drawing-based environment to 3D BIM-based environment. Preliminary studies on existing guidelines and standards for BIM modeling, QTO and cost estimation of reinforcement concrete structures are performed, and then a standardization of BIM-based cost estimation process is proposed through comparative analysis between 2D drawing-based cost estimation process and 3D BIM-based. In addition, modeling, QTO, and cost estimation processes of cost-BIM model for RC structures are conducted. The contributions of this research and the guidelines suggested by this research are 1) lowering barriers to entity to the new BIM-based environment for small size companies, 2) reducing construction cost by a close estimate, 3) establishing the foundation for integrated management of informations through construction project life cycle, 4) and ultimately, developing the BIM ecosystems.

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.

A Study of BIM based estimation Modeling data reliability improvement (BIM기반 견적 모델링 데이터 신뢰성 향상을 위한 연구)

  • Kim, Yeong-Jin;Kim, Seong-Ah;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.43-55
    • /
    • 2012
  • A methodology for BIM Quality Assurance in the construction industry is becoming increasingly an important issue to determine the reliability of BIM. However, the quality assurance of BIM is currently limited to check 3D models, such as clash detection and space layout while verification methods for disciplinary BIM results from structural engineering, mechanical engineering, and estimation do not exist yet. Particularly, in the BIM-based estimation mathematical equations to take off quantities are not clearly exposed so that the results are not quite accepted at practices. With the concept of reliability engineering defined in the manufacturing industry to improve reliability of outcomes of BIM-based quantity take-off, impacting factors that affect reliability of BIM-based quantity take-off were derived. It was found that the factors also include the modeling method and the features of a BIM tool. Therefore, this research aims to propose modeling and verification methods to improve reliability of BIM-based quantity take-off through the pilot test that was performed with commercial BIM tools and IFC-based BIM data.

A Study on Setting Up Work Conditions for Improving Productiviyt of BIM-based Cost Estimation (BIM 견적 작업 생산성 향상을 위한 업무 환경 조성에 관한 연구)

  • Kim, Seong-Ah;Park, Gweon;Song, Byeong-Seob;Choi, Chel-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.56-65
    • /
    • 2016
  • Many cases have mentioned the effect by applying BIM on the media such as at conferences, workshops, reports, ect. These cases reported that costs could be saved directly by prevention the need to re-do and reconstruct caused by using BIM. BIM users mentioned that using BIM has potential value in saving costs. The benefits of the BIM include intangible value that cannot be estimated in costs, such as reducing work time and improving productivity. However, the financial value of using BIM, such as Return on Investment, has not yet been exposed, and BIM users have a negative view of the financial value of BIM in Korea. Therefore, this study has researched the effects of applying BIM on construction estimate services in view of business productivity, not finance. This study compared the traditional and BIM based estimation, and verified the effect of estimating BIM through work sampling. This study investigated a precondition for getting the effects of BIM based estimation. The results show a need for BIM education, 3D Modeling standards, and database on quantity in order to improve product ivity and reduce work time on BIM based estimation

Schematic Estimate Framework of Finishing Works based on IFC-BIM Knowledge (IFC-BIM 연계 지식정보기반 마감공사 개산견적 프레임워크)

  • Park, Sang-Hun;Park, Hyung-Jin;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4176-4184
    • /
    • 2015
  • Cost Estimate for alternative in design phase of construction become criterion for profitability and feasibility analysis of projects. Initial design phase performed schematic estimate based on similar data in the past. The quantity take-off according to estimators experience and calculation method are occurred different or missing. IT (Information Technology) technology evolution has been promoting BIM technology in construction. It is changing the paradigm of planning, design, construction and maintenance phase throughout the construction project. A number of studies have been attempted to apply BIM technology in the construction. In this paper, we propose schematic estimation framework linking standard format IFC (Industry Foundation Classes) and estimate related knowledge. As a result, it performs a cost prediction for decision-making in the design phase, and expected to overcome the limitations of previous studies. In addition, it is possible actively coping with changes.

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

The case study of BIM-based quantity take-off for concrete and formwork (BIM 기반 물량산출 자동화를 위한 콘크리트와 거푸집 공사의 사례분석)

  • Jun, Ki-Hyun;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.13-17
    • /
    • 2011
  • Currently, a lot of design, engineering and construction companies has been interested in BIM(Building Information Modeling) technologies for higher productivity and efficiency. The information provided from BIM can be mostly used for automated quantity takeoff. But BIM has some problems for fully automated quantity takeoff to solve. The purpose of this study is to show the problems and suggest solutions through case study, especially with concrete and form work.

A System Development of Quantity Data Type Analysis for BIM based Automation of Estimation Framework (BIM기반 견적자동화 체계구축을 위한 물량 데이터 유형 분석 체계 개발)

  • Lee, Jae-Joon;Shin, Tae-Hong;Kim, Seong-Ah;Kang, Myung-ku;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.744-747
    • /
    • 2008
  • Quantity information focused on a design drawing plays a critical role in a decision making related to cost for project participants during project life cycles. Related participants absolutely depend on quantity take-off working which produces the quantity information by hand, and then a worker's mistake often causes many errors. The difference of quantity by the know-how of the person in charge of the estimation also occurs. In addition, the worker passes through the whole quantity take-off processes again in case of re-working for quantity take-off produced by a change order. The requirements about the automated estimation increase because of the needs for the accurate quantity take-off and dealing with the change order and recently, the studies about the automated estimation working process based on 34 cad model from 3d cad modeler are attempted in various viewpoints. However, the existing studies reach the limits such as common quantity data type framework for getting Quantity information. Focused on a certain 34 cad modeler and BIM based automation of estimation using it Therefore, the objective of this study is to develop the a series of system which can extract, analyze, and verify Quantity Data Type in modeler to automate quantity take-off originated from various 3d cad modelers as a foundation study for BIM based automation of estimation framework.

  • PDF

A Comparison of Quantity Take-Offs of RC Structures based on BIM (BIM기반 철근콘크리트구조의 물량산출 비교)

  • Yoon, Jong Deok;Cho, Hyun Sik;Lee, Jae Hong;Shin, Jae Yong;Kim, Eun Suk
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.33 no.1
    • /
    • pp.35-44
    • /
    • 2020
  • In the construction industry, there is a growing demand for the accurate calculation of the quantity take-off and construction budget at the design stage, and it is likewise important to grasp changes in the construction budget and quantity take-off if design alterations are made. In addition, lawsuits related to the quantity take-off and cost of construction are frequent; therefore, the calculation of these factors using building information modeling (BIM) has emerged as an alternative. However, existing 2D-based methods are still used more frequently than BIM-based methods for quantity take-offs and construction budgets. This is because of the lack of BIM experience of estimation workers and the absence of a national standard. However, from a designer's point of view, it is necessary to understand the quantity take-off and construction cost based on BIM and accurately create the design according to the budget. In this study, the quantity take-offs of concrete, rebar, and reinforced concrete structures (apartments) in Seoul and Yeongjong were compared with the quantity take-offs based on 2D and BIM methods. From the viewpoint of the designer, we aim to increase the accuracy of BIM-based quantity take-offs.

Improvement of Quantity Take-Off and BoQ through the LOD Criteria Analysis of BIM Models (BIM 모델 표현 수준(LOD) 분석을 통한 내역체계 개선방안 연구)

  • Choi, Hyunjun;Yun, Seokheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.89-97
    • /
    • 2019
  • Recently, BIM has been actively introduced in construction projects. In particular, the introduction of BIM in cost estimating process is expected to improve the accuracy and efficiency of the cost estimate. However, the quantity calculation and BoQ documents preparation process still require manual work. Although the BIM model may support quantification process, it is still problematic that the level of detail of the model must be very detailed to meet the items in BoQ. To address this, it is necessary to analyse the LOD criteria and to analyze the extent to which quantity can be computed according to the level of detail in the BIM model. For the analysis of LOD-based work items, the work item grades were divided into A,B, and C. In this study, the ratio and cost of each item that can be calculated at the LOD level in the detailed design phase are reviewed for each type of work, and the method for improving the quantity calculation using BIM is proposed. In the LOD 300 stage(Detailed design stage), the largest number of items in the class B, the major improvement class, are window and glass work. In addition, the most expensive type of work was analyzed by reinforced concrete work. In the future, it is necessary to suggest appropriate improvement way for items with high item ratios and items with high cost ratios. The results of this study are expected to be used as a BIM-based cost estimation or as basic data for improving the current BoQ system.