• Title/Summary/Keyword: BIM인력

Search Result 25, Processing Time 0.023 seconds

Development of an Evaluation System for BIM-based Friendly-Environment Preliminary Certification -Focusing on the Evaluation of Minimizing Waste Material in the Apartment unit plan- (BIM기반 친환경 예비인증 평가시스템 개발에 관한 연구 -단위세대 평면에서 폐기물 최소화 평가를 대상으로-)

  • Oh, Kunsoo;Song, Jeonghwa;Kim, Kyung Hwan
    • Journal of Digital Contents Society
    • /
    • v.13 no.4
    • /
    • pp.483-490
    • /
    • 2012
  • The evaluation procedure of friendly-environment Preliminary certification is traditionally done by hand. It takes much time and a lot of manpower. Sometimes it is subject to the evaluator's experience. The solution to these problems is to systematize the evaluation procedure. The system can provide an objective standard for evaluation. It can develop more reliable standard, prevent errors, and save time. Therefore, this research suggests the evaluation system using the architectural information based BIM. To do this, the current study examines the possibility of evaluation system of friendly-environment Preliminary certification.

A System Dynamic for Investigating to Use of Building Information Modeling (BIM) for Hanok Construction (시스템 다이내믹스 기반 한옥건축의 BIM 접목 활성화 방안 연구)

  • Seo, Seung-Ha;Bang, Yei-Dam;Hyen, Ju-Hwan;Yu, Chaeyeon;Lee, Donghoon;Kim, Sungjin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.3-11
    • /
    • 2023
  • Building information modeling (BIM) can help to visualize and manage the building-related information at the object-based level, and it is possible to help link the tasks in the network of Hanok construction. While many studies have significant interest in using BIM for modern construction, there is only few studies to observe the use of BIM for traditional construction, commonly called Hanok construction in South Korea. Hence, the main goal of this study is to develop a system dynamic model for investigating how the BIM can be widely used for Hanok construction. To this end, this study identified the factors influencing the BIM uses for the Hanok construction, developed a causal loop diagram (CLD) to investigate the interrelationships among the factors, and provided a final model based on the mathematical definitions. Based on the scenario analysis, it is demonstrated that the support to building Hanok and education cost for BIM positively influence activating and using the BIM for the Hanok construction. Based on the dynamics of the factors identified in this study, it is important to consider expanding support for Hanok construction and education cost for BIM to successfully integrate and utilize BIM in the construction industry.

An RFID and BIM based Simulator for Construction Material Logistics and Progress Management (RFID와 BIM을 활용한 건설 자재 물류 및 진도관리 시뮬레이터 개발)

  • Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.46-54
    • /
    • 2011
  • There have been research and developments for effective and efficient logistics and progress management in a construction project. Among them, RFID+4D has been developed for the supply chain management of long-lead item materials such as steel component, precast concrete component and curtain wall by integrating RFID with 4D CAD. And the feasibility of RFID+4D has been verified and validated and the benefits in terms of time and cost were shown in several case studies. However, the previous development of RFID+4D has not been adapted widely because of additional modeling cost, non-real time data update, additional labor for data update, and so forth. Therefore, this research has proposed a framework and process for solving these problems. And the web based simulation system has been developed and verified based on the proposed framework. The proposed framework and process can improve the existing RFID+4D system in a construction project by saving its operation cost and utilizing project information more efficiently and effectively. Also it is expected that the proposed framework could be applied to a method transferring design RIM data to construction BIM data.

Entity Matching for Vision-Based Tracking of Construction Workers Using Epipolar Geometry (영상 내 건설인력 위치 추적을 위한 등극선 기하학 기반의 개체 매칭 기법)

  • Lee, Yong-Joo;Kim, Do-Wan;Park, Man-Woo
    • Journal of KIBIM
    • /
    • v.5 no.2
    • /
    • pp.46-54
    • /
    • 2015
  • Vision-based tracking has been proposed as a means to efficiently track a large number of construction resources operating in a congested site. In order to obtain 3D coordinates of an object, it is necessary to employ stereo-vision theories. Detecting and tracking of multiple objects require an entity matching process that finds corresponding pairs of detected entities across the two camera views. This paper proposes an efficient way of entity matching for tracking of construction workers. The proposed method basically uses epipolar geometry which represents the relationship between the two fixed cameras. Each pixel coordinate in a camera view is projected onto the other camera view as an epipolar line. The proposed method finds the matching pair of a worker entity by comparing the proximity of the all detected entities in the other view to the epipolar line. Experimental results demonstrate its suitability for automated entity matching for 3D vision-based tracking of construction workers.

Simultaneous Tracking of Multiple Construction Workers Using Stereo-Vision (다수의 건설인력 위치 추적을 위한 스테레오 비전의 활용)

  • Lee, Yong-Ju;Park, Man-Woo
    • Journal of KIBIM
    • /
    • v.7 no.1
    • /
    • pp.45-53
    • /
    • 2017
  • Continuous research efforts have been made on acquiring location data on construction sites. As a result, GPS and RFID are increasingly employed on the site to track the location of equipment and materials. However, these systems are based on radio frequency technologies which require attaching tags on every target entity. Implementing the systems incurs time and costs for attaching/detaching/managing the tags or sensors. For this reason, efforts are currently being made to track construction entities using only cameras. Vision-based 3D tracking has been presented in a previous research work in which the location of construction manpower, vehicle, and materials were successfully tracked. However, the proposed system is still in its infancy and yet to be implemented on practical applications for two reasons. First, it does not involve entity matching across two views, and thus cannot be used for tracking multiple entities, simultaneously. Second, the use of a checker board in the camera calibration process entails a focus-related problem when the baseline is long and the target entities are located far from the cameras. This paper proposes a vision-based method to track multiple workers simultaneously. An entity matching procedure is added to acquire the matching pairs of the same entities across two views which is necessary for tracking multiple entities. Also, the proposed method simplified the calibration process by avoiding the use of a checkerboard, making it more adequate to the realistic deployment on construction sites.

Evaluation of Practical Requirements for Automated Detailed Design Module of Interior Finishes in Architectural Building Information Model (건축 내부 마감부재의 BIM 기반 상세설계 자동화를 위한 실무적 요구사항 분석)

  • Hong, Sunghyun;Koo, Bonsang;Yu, Youngsu;Ha, Daemok;Won, Youngkwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.87-97
    • /
    • 2022
  • Although the use of BIM in architectural projects has increased, repetitive modeling tasks and frequent design errors remain as obstacles to the practical application of BIM. In particular, interior finishing elements include the most varied and detailed requirements, and thus requires improving its modelling efficiency and resolving potential design errors. Recently, visual programming-based modules has gained traction as a way to automate a series of repetitive modeling tasks. However, existing approaches do not adequately reflect the practical modeling needs and focus only on replacing siimple, repetitive tasks. This study developed and evaluated the performance of three modules for automatic detailing of walls, floors and ceilings. The three elements were selected by analyzing the man-hours and the number of errors that typically occur when detailing BIM models. The modules were then applied to automatically detail a sample commercial facility BIM model. Results showed that the implementations met the practical modeling requirements identified by actual modelers of an construction management firm.

Effect of Learning Data on the Semantic Segmentation of Railroad Tunnel Using Deep Learning (딥러닝을 활용한 철도 터널 객체 분할에 학습 데이터가 미치는 영향)

  • Ryu, Young-Moo;Kim, Byung-Kyu;Park, Jeongjun
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.11
    • /
    • pp.107-118
    • /
    • 2021
  • Scan-to-BIM can be precisely mod eled by measuring structures with Light Detection And Ranging (LiDAR) and build ing a 3D BIM (Building Information Modeling) model based on it, but has a limitation in that it consumes a lot of manpower, time, and cost. To overcome these limitations, studies are being conducted to perform semantic segmentation of 3D point cloud data applying deep learning algorithms, but studies on how segmentation result changes depending on learning data are insufficient. In this study, a parametric study was conducted to determine how the size and track type of railroad tunnels constituting learning data affect the semantic segmentation of railroad tunnels through deep learning. As a result of the parametric study, the similar size of the tunnels used for learning and testing, the higher segmentation accuracy, and the better results when learning through a double-track tunnel than a single-line tunnel. In addition, when the training data is composed of two or more tunnels, overall accuracy (OA) and mean intersection over union (MIoU) increased by 10% to 50%, it has been confirmed that various configurations of learning data can contribute to efficient learning.

Development of an Algorithm for Automatic Quantity Take-off of Slab Rebar (슬래브 철근 물량 산출 자동화 알고리즘 개발)

  • Kim, Suhwan;Kim, Sunkuk;Suh, Sangwook;Kim, Sangchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.52-62
    • /
    • 2023
  • The objective of this study is to propose an automated algorithm for precise cutting length of slab rebar complying with regulations such as anchorage length, standard hooks, and lapping length. This algorithm aims to improve the traditional manual quantity take-off process typically outsourced by external contractors. By providing accurate rebar quantity data at BBS(Bar Bending Schedule) level from the bidding phase, uncertainty in quantity take-off can be eliminated and reliance on out-sourcing reduced. In addition, the algorithm allows for early determination of precise quantities, enabling construction firms to preapre competitive and optimized bids, leading to increased profit margins during contract negotiations. The proposed algorithm not only streamlines redundant tasks across various processes, including estimating, budgeting, and BBS generation but also offers flexibility in handling post-contract structural drawing changes. In particular, the proposed algorithm, when combined with BIM, can solve the technical problems of using BIM in the early phases of construction, and the algorithm's formulas and shape codes that built as REVIT-based family files, can help saving time and manpower.

Exploring the Combined Use of LiDAR and Augmented Reality for Enhanced Vertical and Horizontal Measurements of Structural Frames (골조 수직, 수평 측정작업 시 LiDAR 및 AR 기술 적용방안 제시)

  • Park, Inae;Kim, Sangyong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.3
    • /
    • pp.273-284
    • /
    • 2023
  • This study is centered on the combined use of LiDAR(Light Detection and Ranging) and AR(Augmented Reality) technologies during vertical and horizontal frame measurements in construction projects. The intention is to enhance the quality control procedure, elevate accuracy, and curtail manual labor along with time expenditure. Present methods for accuracy inspection in frame construction often grapple with reliability concerns due to subjective interpretation and the scope for human error. This research recommends the application of LiDAR and AR technologies to counter these issues and augment the efficiency of the inspection process, along with facilitating the dissemination of results. The suggested technique involves the collection of 3D point cloud data of the frame utilizing LiDAR and leveraging this data for checks on construction accuracy. Furthermore, the inspection outcomes are fed into a BIM (Building Information Modeling) model, and the results are visualized via AR. Upon juxtaposing this methodology with the current approach, it is evident that it offers benefits in terms of objective inspection, speed, precise result sharing, and potential enhancements to the overall quality and productivity of construction projects.

Image-Based Automatic Bridge Component Classification Using Deep Learning (딥러닝을 활용한 이미지 기반 교량 구성요소 자동분류 네트워크 개발)

  • Cho, Munwon;Lee, Jae Hyuk;Ryu, Young-Moo;Park, Jeongjun;Yoon, Hyungchul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.6
    • /
    • pp.751-760
    • /
    • 2021
  • Most bridges in Korea are over 20 years old, and many problems linked to their deterioration are being reported. The current practice for bridge inspection mainly depends on expert evaluation, which can be subjective. Recent studies have introduced data-driven methods using building information modeling, which can be more efficient and objective, but these methods require manual procedures that consume time and money. To overcome this, this study developed an image-based automaticbridge component classification network to reduce the time and cost required for converting the visual information of bridges to a digital model. The proposed method comprises two convolutional neural networks. The first network estimates the type of the bridge based on the superstructure, and the second network classifies the bridge components. In avalidation test, the proposed system automatically classified the components of 461 bridge images with 96.6 % of accuracy. The proposed approach is expected to contribute toward current bridge maintenance practice.