A Proposal Research of Assessment Standards for Ordering BIM-based Projects in Railway Infrastructure - Case Study on Application of Existing Projects - (철도인프라 BIM기반 공사 발주를 위한 평가기준 제안 연구 - 기존 발주사업 적용 사례를 통해 -)

  • Son, Seo-Yeon;Lee, Geun-Il;Jung, Ji-Hyun;Moon, Woo-Hyoung
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.10-19
    • /
    • 2021
  • In the evaluation for ordering BIM-based projects (Design Build) of Korean National Railway, criteria of BIM-based smart construction technology are assessed. Unlike the existing assessment criteria, performance resources and detailed assessment guidelines have been added by this research. The purpose of this study is to propose qualification assessment standards according to specific guidelines when evaluating on the phase of bidding for BIM-based projects. In the study, an improved evaluation standard (draft) was arranged based on two consultation meetings and surveys of related companies, applied to existing projects with the companies that won the bid, and validated. As more specific and added criteria compared to the existing standards, it could reduce the difficulty of evaluation for BIM capability and lay the foundation for railway BIM-based project management.

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

Framework of Conceptual Estimation Model for BIM based Internal Finishes of High-rise Building Project (BIM기반의 초고층 빌딩 내부마감 개략견적 코스트모델 개발)

  • Chung, Suwan;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.53-61
    • /
    • 2014
  • Previous studies reveal the need for a tool to cost estimation of building design in early design stages. This paper proposes an internal finishes cost model tool to address this need. The tool allows users to evaluate the functionality, economics and quality of finishes concurrently with high-rise building design. Lack of information in the early stages of the project enables a relatively accurate estimates of work to raise up. Measurements are automatically extracted from simple design information and profile driven estimates are revised in real-time. The data model uses a flexible unit rate system that can easily be extended to other estimate dimensions such as mix-use building surcharge rate estimation. The approach illustrated in this paper is applicable to BIM tool conceptual estimation that support for massing purposes other than the one chosen for this study.