• Title/Summary/Keyword: Avionics System Requirements Verification

Search Result 10, Processing Time 0.022 seconds

Development of System Integration Laboratory for the Verification of UAV Avionics System Requirements (무인기 항공전자시스템 요구도 검증을 위한 통합시험환경 개발)

  • Jo, Young-Wo;Kim, Bong-Gyu;Park, Jae-Sung;Lee, Jae-Uk
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.40 no.5
    • /
    • pp.446-453
    • /
    • 2012
  • As part of the integration phases in developing a UAV, a System Integration Laboratory (SIL) has been developed to provide integrated test capability for the verification of avionics system requirements. The SIL has realized primary functions that are common in manned aircraft SIL's, and specialized laying stress on test data visualization and test automation under the closed-loop structure of the ground control simulation, aircraft simulation and flight simulation components. Those design results have led to easy and sure verification of lots of complex requirements of the UAV avionics system. The functions and performances of the SIL have been proved in four gradational test steps and checked to operate successfully in aircraft System Integration Test Environment for the integration of UAV ground station and aircraft.

Generation of System Requirements for Smart UAV (스마트 무인기 시스템 요건 도출)

  • Lee, Jeong-Jin
    • 시스템엔지니어링워크숍
    • /
    • s.4
    • /
    • pp.17-22
    • /
    • 2004
  • This paper present the brief generation process of system requirements or mart UAV from a development obejective. The current Snart UAV requirements deal with the restricted life cycle from development to test and verification exclusive of full life cycle beacuse of the new technology demonstration research program funded by goverments. The Smart UAV system consists of flight vechicle, avionics, communication link, payload, ground control stationand ground supporting system. In thus paper, top-down flown requirememts are intoduced how to allocate to each sub-system.

  • PDF

Development of Real Time Simulation Environment Based on DEVS Formalism Applicable to Avionics System Integration Laboratory (항공용 SIL에 적용 가능한 DEVS 형식론 기반의 시뮬레이션 환경 개발)

  • Seo, Min-gi;Shin, Ju-chul;Baek, Gyong-hoon;Kim, Seong-woo
    • Journal of Advanced Navigation Technology
    • /
    • v.23 no.5
    • /
    • pp.345-351
    • /
    • 2019
  • Avionics System Integration Laboratory is an integrated test environment for the integration and the verification of avionics systems. Recently, in order to fully consider the requirements verification of avionics system from the aspect of the entire system integration, the participation in the development of the SIL field is advanced from the requirement analysis of the aircraft. Efforts are being made to minimize the cost and the period of development of a SIL so that it does not affect the overall schedule of the aircraft development. We propose the avionics simulation model framework (ASMF) based on the modeling formalism applicable to SIL in order to reduce development period/cost and increase maintenance by standardizing the modeling methods of SIL.

Analysis of Requirements for Verification of SBAS Approach Procedure for Flight Test (비행시험용 SBAS 접근 절차 검증을 위한 요구사항 분석)

  • Hong, Jae-Beom;Hong, Gyo-Young;Kang, Hee Won;Kim, Koon-Tack
    • Journal of Advanced Navigation Technology
    • /
    • v.21 no.6
    • /
    • pp.549-553
    • /
    • 2017
  • The KASS development project, a Korean SBAS launched in 2014, is under development for the APV-1 Class SOL service in 2022. Flight tests should be conducted to analyze development requirements and performance requirements for KASS R & D. However, since the evaluation items have not yet been presented in Korea, FAA and ICAO regulations should be analyzed so that evaluation items for flight testing for KASS development should be structured and comply with international standards. In this paper, we analyze the procedure verification of SBAS for flight test using satellite navigation system.

Development of Automatic Test Equipment for Hardware Verification of Aircraft Stores Management Computer (항공기용 무장관리컴퓨터 하드웨어 검증을 위한 자동시험 장비 개발)

  • Oh, Soo-heon;Jeon, Eun-seon;Kim, Kap-dong;Park, Jun-hyun
    • Journal of Advanced Navigation Technology
    • /
    • v.25 no.5
    • /
    • pp.377-383
    • /
    • 2021
  • In this paper, we describe the case of automatic test equipment development for hardware verification of stores management computer mounted on aircraft. Recently, the required functions of aircraft have been diversified and the related technologies of avionics equipment have developed, and the types and quantity of interfaces required for avionics equipment have increased. In addition to the existing old stores, the stores management computer also needs to control the interface in large quantities as the requirements for the new stores are added. For this reason, the time and manpower required for the inspection of avionic equipment are also increasing, and if the test process of avionic equipment can be automated and unmanned, more efficient inspection system operation will be possible. Therefore, this paper introduces the case of designing test software and test scenario to automate the structural design contents and verification process of test equipment required for the verification of hardware function of stores management computer.

Design Verification of Environmental Control System by Flow Balance Test (유량평형시험을 통한 환경제어계통 설계 검증)

  • Park, Dong-Myung;Joung, Yong-In;Moon, Woo-Yong;Park, Sung-Sun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.40 no.7
    • /
    • pp.608-615
    • /
    • 2012
  • In this study, we analyzed the system impedance of Unmanned Aerial Vehicle avionics bay and Environmental Control System(ECS), and estimated the proper air flow rate to be supplied avionics equipments. As the result of estimation, we evaluated the performance of ECS after analysing the flow balance rate and the air flow rate about each outlet port, and simultaneously decided the flow balance rate after evaluating the thermal substantiality by the thermal analysis of avionics bay. In order to verify the property of analysis result, we conducted the flow balance test using the actual avionics equipments and finally deduced the flow rate to be met system requirements of avionics equipments. Also, as the analysis results, we verified the satisfaction of system requirements at midium altitude condition and proved the performance characteristics of an Environmental Control System(ECS).

A study on the application of agile method to resolve electric system issues in the performance improvement of aged aircraft in the phase of mass production (양산 단계 노후 항공기 성능 개량에서 전기계통 이슈 해결을 위한 애자일 기법 적용연구)

  • In-Bok, Yoon;Kyeong-Soo, An
    • Journal of IKEEE
    • /
    • v.26 no.4
    • /
    • pp.560-567
    • /
    • 2022
  • This paper proposed an application of agile management method to resolve the electrical system issues identified during the mass production phase of aged aircraft performance improvement. The proposed method was applied from issue analysis to on-site verification and testing stage, before the formal configuration control process. At this time, the project was carried out by setting a sprint period to complete the verification according to requirements through daily scrum and sprint review. As a result, It was verified that the wiring installation of the aircraft, which was the output of the sprint, met requirements within the defined sprint period.

Generation of System Requirements for Smart UAV (스마트 무인기 시스템 요건 도출)

  • Lee, Jung Jin
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.1 no.1
    • /
    • pp.32-38
    • /
    • 2005
  • This paper presents the brief generation process of system requirements for Smart UAV from a development objective. The current Smat UAV requirements deal with the restricted life cycle from development to test and verification exclusive of full life cycle because of the new technology demonstration research program funded by governments. The Smart UAV system consists of flight vehicle, avionics, communication link, payload, ground control station and ground supporting system. In this paper, top-down flown requirements are introduced how to allocate to each sub-system.

  • PDF

Test Plan for Anti-Jamming System Performance Evaluation

  • Park, Ji-Hee;Kwon, Seung Bok;Shin, Dong-Ho
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.4 no.1
    • /
    • pp.17-23
    • /
    • 2015
  • With the increase in the risk of GPS jamming, the development and application of anti-jamming GPS techniques have been actively performed. As the objective performance verification of developed techniques is important, equipment development for verification and discussion on anti-jamming performance test method and procedure have also been conducted. However, most tests are related to the specification of equipment and therefore detailed procedure of the performance verification of an anti-jamming system needs to be developed. In this study, requirements for anti-jamming performance verification were described, and test configurations and performance evaluation items depending on three kinds of test methods (lab test, basic outdoor test, and chamber test) were suggested for anti-jamming performance verification.

A study on the effect of cable improvement renovating an old aircraft (노후 항공기 개조 시 케이블 개량에 따른 효과 연구)

  • Lee, Gwang-suk;Yoon, In-bok;Jang, In-dong
    • Journal of IKEEE
    • /
    • v.26 no.2
    • /
    • pp.257-264
    • /
    • 2022
  • As it takes a lot of time and money to develop an aircraft, an environment for renovating and using existing operating aircraft has been created. As a result, many old aircraft were renovated, and due to the aging of the aircraft, more demanding cable requirements were required for renovation projects, and as the number of equipment inside the aircraft gradually increased, the difficulty of system integration increased. In order to solve the difficulties of system integration through systematization of verification procedures, this paper explains VSWR, I-loss, which are the main indicators of antenna cable modification, and explains DTF, one of the problem detection methods. It also explains the elements required for cable design, the environment to be measured, and procedures, and introduces the overall process and effect of antenna cable improvement through demonstration cases.