To test the effectiveness of using an energy storage system for frequency regulation, the Energy New Business Laboratory at KEPCO Research Institute installed a 4 MW energy storage system (ESS) demonstration facility at the Jocheon Substation on Jeju Island. And after the successful completion of demonstration operations, a total of 52 MW ESS for frequency regulation was installed in Seo-Anseong (28 MW, governor-free control) and in Shin-Yongin (24 MW, automatic generation control). The control system used in these two sites was based on the control system developed for the 4 MW ESS demonstration facility. KEPCO recently finished the construction of 184 MW ESS for frequency regulation in 8 locations, (e.g. Shin-Gimjae substation, Shin-Gaeryong substation, etc.) and they are currently being tested for automatic operation. KEPCO plans to construct additional ESS facilities (up to a total of about 500 MW for frequency regulation by 2017), thus, various operational tests would first have to be conducted. The high-speed characteristic of ESS can negatively impact the power system in case the 500 MW ESS is not properly operated. At this stage we need to verify how effectively the 500 MW ESS can regulate frequency. In this paper, the effect of using ESS for frequency regulation on the power system of Korea was studied. Simulations were conducted to determine the effect of using a 524 MW ESS for frequency regulation. Models of the power grid and the ESS were developed to verify the performance of the operation system and its control system. When a high capacity power plant is tripped, a 24 MW ESS supplies power automatically and 4 units of 125MW ESS supply power manually. This study only focuses on transient state analysis. It was verified that 500 MW ESS can regulate system frequency faster and more effectively than conventional power plants. Also, it was verified that time-delayed high speed operations of multiple ESS facilities do not negatively impact power system operations. It is recommended that further testing be conducted for a fleet of multiple ESSs with different capacities distributed over multiple substations (e.g. 16, 24, 28, and 48 MW ESS distributed across 20 substations) because each ESS measures frequency individually. The operation of one ESS facility will differ from the other ESSs within the fleet, and may negatively impact the performance of the others. The following are also recommended: (a) studies wherein all ESSs should be operated in automatic mode; (b) studies on the improvement of individual ESS control; and (c) studies on the reapportionment of all ESS energies within the fleet.
This paper proposes an automatic generation technology of test case based on API in source code for software's quality improvement. The proposed technology is comprised of four processes which are analyzing source code by using the Doxygen open source tool, defining API specification by using analyzed results, creating test design, generating a test case by adapting Pairwise test technology. Analyzing source code by using the Doxygen open source tool is the phase in which API information in source code such as the API name, input parameter and return parameter are extracted. Defined API specification by using analyzed results is the phase where API informations, which is needed to generate test case, are defined as a form of database by SQLite database on the basis of extracted API information. Creating test design is the phase in which the scenario is designed in order to be composed as database by defining threshold of input and return parameters and setting limitations based on the defined API. Generating a test case by adapting Pairwise test technique is the phase where real test cases are created and changed into database by adapting Pairwise technique on the base of test design information. To evaluate the efficiency of proposed technology, the research was conducted by begin compared to specification based test case creation. The result shows wider test coverage which means the more cases were created in the similar duration of time. The reduction of manpower and time for developing products is expected by changing the process of quality improving in software developing from man-powered handwork system into automatic test case generation based on API of source code.
Journal of the Korea Academia-Industrial cooperation Society
/
v.9
no.5
/
pp.1154-1163
/
2008
DAS and SCADA system are main systems, which operate and manage the power system by using computer and communication technology. But DAS and SCADA have been operated independently in Korea, so there was some time delay in the fault handling and live-line work. To improve that problems, studies on the interface between DAS and SCADA have been needed. From November 2005 to December 2007, the pilot project has been performed in KEPCO's branch offices, as a result, direct method will be applied widely all over the country until 2010 because the operation information of substation users want can be transmitted fast and it is possible to control 43RC directly although the expense for direct method is about 1.3 times larger than that for web method. To improve problems revealed during the pilot project, substation object to object communication method is proposed and interface database automatic generation and interface system diagnosis and logging functions are developed. Interface data point and communication data type are defined, substation single line diagram automatic generation or manual editing function, SCADA monitoring and controlling function, log data managing function are developed in SCADA HMI program. It is expecting to reduce the average time for each outage about 33% and to improve the reliability, efficiency of operation, execution of DAS from automatic load transfer under a fault, and to contribute to export project.
The Transactions of The Korean Institute of Electrical Engineers
/
v.61
no.10
/
pp.1399-1411
/
2012
The grid frequency is controlled cooperatively by the governor of the Turbine-Generator and the automatic generation controller(AGC) of the KPX(Korea Power Exchange). It is a basic requirement that the reliability of the governor is verified to enhance the power system stability but it is not easy to confirm the response characteristics of the governor because all generators are operated in the grid system that has the constant voltage and frequency. Therefore, it is necessary to study a new test method in order to examine the governor dynamic characteristic in the similar fault conditions. A study has shown that it is verified to simulate the turbine-generator power control system, the governor response characteristic under limited conditions and contribution of AGC with the gas turbine generator simulation model as well as demonstrate the dynamic response of the governor with the developed governor dynamic characteristic tester based on digital controller while the turbine-generator is connected to the grid system. This tester is constructed by the built-in functions of the turbine-generator main controller. In this treatise, the theoretical background, development method and the results of both simulations and demonstrations are described as another way to verify the turbine-generator governor dynamic characteristics.
Formal specification plays important roles in guaranteeing software safety of safety-critical systems such as nuclear power plant's digital control systems. We had developed a technique [1] which synthesizes Function Block Diagram(FBD) programs from NuSCR formal requirements specifications, but it did not be used widely as it had no automatic tool support. FBD is one of the programming languages for Programmable Logic Controllers(PLC) based system. This paper introduces a CASE tool, NuSCRtoFBD, developed to automate the synthesis procedure. The CASE tool NuSCRtoFBD can reduce a number of errors occurred in the process of manual FBD programming.
Journal of the Korean Society of Industry Convergence
/
v.21
no.5
/
pp.207-217
/
2018
Recently, the importance of energy demand management, particularly peak load control, has been increasing due to the policy changes of the Second Energy Basic Plan. Even though the installation of distributed generation systems such as Photovoltaic and energy storage systems (ESS) are encouraged, high initial installation costs make it difficult to expand their supply. In this study, the power consumption of a university building was measured in real time and the measured power consumption data was used to calculate the optimal installation capacity of the Photovoltaic and ESS, respectively. In order to calculate the optimal capacity, it is necessary to analyze the operation methods of the Photovoltaic and ESS while considering the KEPCO electricity billing system, power consumption patterns of the building, installation costs of the Photovoltaic and ESS, estimated savings on electric charges, and life time. In this study, the power consumption of the university building with a daily power consumption of approximately 200kWh and a peak power of approximately 20kW was measured per minute. An economic analysis conducted using these measured data showed that the optimal capacity was approximately 30kW for Photovoltaic and approximately 7kWh for ESS.
The Transactions of The Korean Institute of Electrical Engineers
/
v.66
no.7
/
pp.1039-1046
/
2017
Campus microgrid is designed and built by considering not only power generation but also power consumption management as connected microgrid type because the main goal of the campus microgrid is to save power consumption costs. There are many functions to achieve the goal and they are mainly to use generation-based functions such as islanding operation for peak management and for emergency events. In power distribution operation, Conservation Voltage Reduction (CVR) is applied in order to reduce power consumption. The CVR is defined as a function for load consumption reduction by voltage reduction in order to reduce peak demands and energy consumption. However, application of CVR to microgrid is difficult because the microgrid cannot control a tap of transformer in a substation and the microgrid normally is not designed with phase modifying equipment like a step-voltage-regulator which can control voltage in power distribution system operation. In addition, an impact of the CVR is depended on load characteristics such as a normal load, a rated power, and synchronous motors. Therefore, this paper proposes an application of CVR using linear voltage control based AVR in campus microgrid with power consumption reduction considering characteristics of load and component in the microgrid. The proposed system can be applied to each buildings by a configuration of power distribution cables; and the application results and CVR factor are presented in this paper.
Transactions of the Korean Society of Mechanical Engineers A
/
v.40
no.3
/
pp.327-336
/
2016
Manufacturers of aircraft engines have introduced computer-aided manufacturing (CAM) software to operate and control computerized numerical control (CNC) machine tools. However, the generation of a CAM model is a time consuming and error-prone task since machining procedure and operational details are manually defined. For the automatic generation of a CAM model, feature recognition techniques have been widely studied. However, their recognition coverage is limited so that complex shapes such as a jet engine cannot be fully developed. This study presents a novel approach to quickly generate a CAM model from a CAD model using shape search techniques. Once an operator sets a machining operation as a reference operation, the same shapes as the shapes referenced by the operation are searched. The reference operation is copied to the positions of the searched shapes. The proposed method was verified through experiments with a jet engine compressor case.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.21
no.3
/
pp.96-106
/
2007
The terminal voltage of a synchronous generator is maintained by the field current control of excitation system. Generally AC/DC converter which is component of AVR(Automatic Voltage Regulator) system for excitation current control is connected to diode rectifier and DC/DC converter system. In the case of diode rectifier system of phase controlled converter as AC/DC converter have low power factor and harmonics of lower order in the line current. In this paper, two stage three phase PWM AC/DC converter is studied to solve these problems. The characteristics of a proposed converter reduces the harmonics and reactive power of the distribution line and has fast dynamic response in transient period using boost converter and current control mode buck converts. The proposed method is verified by the computer simulation and experimental results in prototype generation system.
Journal of the Korean Institute of Intelligent Systems
/
v.6
no.2
/
pp.43-51
/
1996
Fuzzy rules in fuzzy logic control play a major role in deciding the control dynamics of a fuzzy logic controller. Thus, control performance is mainly determined by the quality of fuzzy rules. This paper introduces an optimization method for fuzzy rules using GAS with adaptive probabilies of crossover and mutation. Also we design two fitness measures to satisfy control objectives by partitioning the response of a plant into two parts. An initial population is generated by an automatic fuzzy rule generation method instead of random selection for fast a.pproaching to the final solution. We employed a nonlinear plant to simulate our method. It is shown through simulation that our method is reasonable and can be useful for optimizing fuzzy rules.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.