With the rapid development of Urban Mass Transit in China, the Intelligent Transport System becomes inevitable. Based on the brief introduction of the blueprint of Urban Mass Transit in Shanghai, this paper analyses in detail the components and functions of Automatic Train Control (ATC) system applied in Shanghai Metro, presents the key technology of the main three subsystems of the ATC system : Automatic Train Supervision (ATS) subsystem, Automatic Train Protection (ATP) subsystem, Automatic Train Operation (ATO) subsystem. After reading this paper, you will have an general grasp of ATC system. At the end of the paper, it suggests a good resolution about the ATC system equipment to be made in China. If you are interested in the resolution, we'd like to exchange our thought.
Park, Gie-Soo;Kim, Ja-Young;Park, Chae-Jung;Lee, Sung-Hoon;Ryou, Myung-Seon
Proceedings of the KSR Conference
/
2011.10a
/
pp.2292-2299
/
2011
The CBTC(Communication Based Train Control) system, a recent train control system, is a wireless communication based train control system that is operated in the moving block system control by tracking trains in real time. In additioin, the system helps to increase the volume of traffic by shortening driving headways through controlling moving block system control. Furthermore, driverless modes are performed by controlling ATP(Automatic Train Protection)/ATO(Automatic Train Operation). In this paper, controllable elements in ATO driverless train control system, affecting comfortable ride, will be analysed and applied to CBTC train control system that developed by POSCO ICT. Finally, the test results of improved comfortable ride will be showed by appling the developed system to the Gyeong-san light rail transit test track.
Kim, Seok-Heon;Han, Jae-Mun;Park, Tan-Se;Cho, Yong-Gee
Proceedings of the KSR Conference
/
2011.05a
/
pp.363-367
/
2011
In this paper a simulator for Integrated Onboard Signalling System(IOSS) will be presented and illustrated. IOSS which is integrated with there signalling systems such as ERTMS/ETCS Level 1 ATP(Automatic Train Protection), ATC(Automatic Train Control) and ATS(Automatic Train Stop) is a signalling system for HEMU-400X(Highspeed Electric Multiple Unit - 400km/h eXperiment). HEMU-400X is under development as the next generation high-speed train in Korea. Before conducting a trial run of HEMU-400X with IOSS, we must carry out functional test of IOSS. The simulator is suggested in this paper for testing and verification of IOSS. The simulator can help to test all function of IOSS although a real train and trackside equipments are not existed. Also the simulator can make a fault in trackside equipment intentionally. In that scenario, we can figure out how IOSS handle emergency situations.
The Transactions of The Korean Institute of Electrical Engineers
/
v.66
no.1
/
pp.237-242
/
2017
This paper presents development of the transponder system which provides an accurate train position, especially for supporting 400km/h high speed train. Here, we analyzed an operating frequency band of the transponder system which can be interoperable with the Eurobalise system already installed in Korea railroad as to be used for the automatic train protection (ATP). By investigating the power frequency band and its data frequency band of the transponder system, we presents the adoptable frequency band for the developed transponder system. Additionally, through the real testbed using HEMU-430X, we evaluate its performance requirement and shows interoperable operation with the Eurobalise system.
This paper is a study on the reliability management of onboard signaling equipment for the Koran Tilting Train (TTX) to run the existing railway to express railway. For safe running of tilting train which operates at Automatic Train Protection (ATP) and Automatic Train Stop (ATS), a reliability management plan for TTX onboard is proposed for preventing train safety from driver oversight and malfunction by establishing braking curves based on movement authority and speed limit, according to preceding train location and rail conditions. Also, reliability of TTX onboard equipment on the basis of proposed plan was estimated, and actual case studies based on the international requirements IEC 62278 (EN 50126) were provided to verify its reliability.
In this paper we deal with the APARP theory which has been applied for UK railway system and risk assessment method which has been using in the domestic railway system for the safety demonstration. Both techniques are applied to the ATP wayside equipment for interface. Also, fur the applications of each techniques a analysis of the safety activity and a possibility of the application of ALARP theory are evaluated. Finally, we generate requirements of the safety demonstration for the future domestic railway system by way of the analysis of some assumptions and requirement data which can be applied to the risk assessment of ALARP.
Kim, Min-Seok;Yoon, In-Mo;Ko, Jun-Seog;Lee, Jong-Woo
Journal of the Korean Society for Railway
/
v.11
no.6
/
pp.536-542
/
2008
In concrete slab track, the signal current using wayside transmitter of ATP (Automatic Train Protection) system is influenced by reinforcing bars. The magnetic coupling between reinforcing bars and wayside transmitter of ATP system as a filter makes an input current distorted. So, it makes an alternating current signal with a desirable size not transmit to on-board system of a train. Way to decrease the distortion of an input current signal frequency is to avoid maximum induction current frequency. And the induction phenomenon between reinforcing bars insulated and wayside transmitter of ATP system does not occur. In this paper, we represent the model about wayside transmitter of ATP system and reinforcing bars on the concrete slab tracks, and calculated the parameters demanded for the model. Also, we demonstrated it through the Maxwell program. Furthermore, we calculated impedance on wayside transmitter used in KVB system and ERTMS/ETCS system which are a kind of ATP system, frequency response of induction current, using Matlab, and demonstrated the validity of it, using PSpice program.
Journal of the Korea Academia-Industrial cooperation Society
/
v.11
no.10
/
pp.3911-3916
/
2010
In this paper we describe contents and results on running test for ATP on-board equipment, which has propelled as one of the research projects, so called, "Reliability assessment and operation technology development for Korean-type tilting trains" in order to ensure the safety and operation efficiency of tilting trains. We developed tilting trains for the speed-up of conventional lines and for the passenger service improvement where the KTX is not available. And we made progress the operation trial test in the 120,000 km distance with the use of ATS equipment, used in existing lines, for the purpose of the reliability assessment of the developed tilting trains. We decided to accelerate the speed for more than 200km/h with respect to the 6 existing lines including Jungang-line and Chungbuk-line where KTX has not operated. According to this decision, Train control system is to be changed from ATS to ATP. We should have installed an ATP on-board unit in tilting trains and verified the operational suitability, therefore we installed the same ATP on-board unit on tilting trains as that used in the ATP construction project on Gyeongbu-line and Honam-line, and verified that the function and performance of the installed ATP on-board unit conformed to the tilting trains operation.
In this paper, we provide safety requirements and advices to guarantee the safety of an interface in a level crossing system which is an interface between the conventional facilities and the new ATP (Automatic Train Protection) system, as well as we accomplish a safety management for the facilities of a country that has a different standard with already standardized ATP system. The system model has been made based on a safety activity of the international standard, and then a tolerance of a risk by the safety activity through PHA (Preliminary Hazard Analysis) has been analyzed. finally we achieved HIA (Hazard Identification and Analysis) for the assumptions that have been produced from a operating scenario and a functional interface. Thus, the safety requirements for the interface has been provided from the safety plan of HIA, and we showed the safety activity to guarantee the system safety through HIA which was depend on the design.
Kim, Min-Kyu;Cha, Gi-Ho;Kim, Min-Seok;Lee, Jong-Woo
Journal of the Korean Society for Railway
/
v.15
no.1
/
pp.42-47
/
2012
There are ATC (Automatic Train Control), ATP (Automatic Train Protection), ATS (Automatic Train Stop) and ATO (Automatic Train Operation) etc. in train control systems. As various train control systems are installed according to sections, on-board signaling systems are installed to apply to the section. Hence, operation flexibility of trains is decreased. In other words, when trains are operated in the section where other train control systems are used, the on-board signaling systems are changed. Recently, a study on the combined on-board signaling system has been researched to solve this problem. The combined on-board signaling system consists of ATC, ATP and ATS device. Because the train control systems are vital, it needs to design the combined on-board signaling system by using k out of n system. In this paper, when k out of n system is applied in the combined on-board signaling system, the reliability and loss cost are analyzed by using failure rate in each device. Hence, the ideal number of systems is presented according to the number of outputs.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.