• Title/Summary/Keyword: Automatic Integrated Test Station

Search Result 2, Processing Time 0.017 seconds

Circuit card inspection method through digital circuit design based AITS

  • Han, Ji-Hoon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.8
    • /
    • pp.1-7
    • /
    • 2018
  • Previous test equipment was bulky, took a long time to check, and was somewhat less economical. Since most of the checks were about analog signals, we preferred to check them using reference equipments. In this paper, a digital circuit design based on AITS is used to implement signals that can not utilize commercial measurement resources, and also designed and manufactured equipment that can inspect SRU. These test equipments were tested and evaluated by development, operation, and field evaluation, and they were installed to the Korean Field Force. This contributed to the improvement of operability by shortening the inspection time from 83.2 minutes to 7.8 minutes on average In addition, it did not utilize the reference equipment, so it could play a big role in lowering the mass production cost.

Case Studies on Applications of Convergence Measurement Systems at the Stages of Tunnel Construction and Maintenance (터널 시공 및 유지관리 단계 내공변위 계측시스템 적용사례 연구)

  • Lee, Dae-Hyuck;Han, Il-Yeong;Kim, Ki-Sun;Jin, Suk-Woo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.3
    • /
    • pp.59-69
    • /
    • 2000
  • Three-dimensional total station system which integrated the instrument with Target Pin and TEMS 3D software developed by SKEC R&D center was applied to a tunnel excavation for monitoring of convergence and crown settlement. The efficiency of the system was proved as the result in the aspects of exact monitoring and prediction of rock conditions ahead of the face. To monitor the behavior of tunnel lining at the maintenance stage, DOCS system was applied to the subway tunnel section. Such many effects as the vibration of sensors, verification of the system efficiency, the effect of test trains operation, the variation of temperature and the effect of high voltage was checked. Thus the management scheme for tunnel maintenance was laid out as a proposal.

  • PDF