• Title/Summary/Keyword: At-Speed test

Search Result 2,580, Processing Time 0.029 seconds

A Study on Identifying Dynamic Characteristic Parameters of Rotor Bearing Systems Using Field Measurement Data of Unbalance Responses (현장 불평형 응답을 이용한 로터-베어링 시스템의 매개변수 규명 연구)

  • Lee, Dong-Hwan;Kim, Paul-Y.;Park, Noh-Gil
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.605-611
    • /
    • 2000
  • Presented in this paper is a new method of identifying the critical speed of rotor-bearing systems without actually reaching at the critical speed itself. Using the method, it is not only possible to calculate the critical speed by measuring a series of rotor responses at much lower rotating speeds away from and without reaching at the critical speeds but also the damping ratio and eccentricity of the system can be identified at the same time. Two types of test rotors were tested on the Rotor Dynamics Test Facility at the Rotordynamics Lab., KIMM, and the theory has been confirmed experimentally. The method can be adopted to monitor changes of the dynamic characteristics of critical rotating machinery before and after overhauls, repairs, exchanges of various parts, or to detect trends of direction of subtle changes in the dynamic characteristic parameters over a long periods of time.

  • PDF

Application of a standardized exercise test by measuring serum lactate concentration in Thoroughbred racehorses (더러브렛 경주마에서 혈청 젖산농도 측정에 의한 표준운동능력검사의 적용)

  • Mun, Kyu-whan;Kim, Joon-gyu;Kim, Byung-sun;Um, Young-ho;Yang, Il-suk
    • Korean Journal of Veterinary Research
    • /
    • v.39 no.6
    • /
    • pp.1081-1090
    • /
    • 1999
  • To establish the protocol of a standardized exercise test for evaluating exercise intolerance and degree of fitness in Thoroughbred racehorses, we examined serum lactate concentrations related to exercise intensities using the high speed treadmill. Twelve clinically healthy Thoroughbred racehorses with or without previous training or racing history were assigned to two gorups, fit and unfit group, respectively. The protocol used for the standardized exercise test was consisted of two stages : stage of warm-up and that of acceleration. During the warm-up, the horses exercised 5 min at 1.8m/s and 3 min 3.4m/s without inclination. At the acceleration stage, exercise test was performed at 10% slope and the speed was increased from the initial 5m/s to the maximal speed which each tested horse could keep up with. The speed was increased with incremental steps of 1 m/s every minute. During the last 15 sec of each step, blood samples were collected for serum lactate determination. $V_{max}$(maximal treadmill speed which tested horses could keep up with) of the fit group ($10.93{\pm}0.33m/s$, mean${\pm}$SE, n = 6) was higher than that of the unfit group ($9.52{\pm}0.23m/s$, mean${\pm}$SE, n = 6). Serum lactate concentrations increased exponentially according to exercise intensities. $V_{La4}$(speed producing a serum lactate concentration of 4mmol/l) of the fit group, $6.45{\pm}0.26m/s$, was higher than that of the unfit group, $5.45{\pm}0.23m/s$. $La_{peak}$(peak plasma lactate concentration during the exercise test) was lower in the fit group ($20.34{\pm}1.62mmol/l$ at 1 min after maximal intensity exercise) than in the unfit group ($24.78{\pm}1.09mmol/l$ at 2 min after maximal exercise step). $t_{50%}$(time required for the recovery of lactate concentration to be one-half of $La_{peak}$ after maximal exercise) of the unfit group and the fit group were 40.0 and 18.0 min, respectively. Therefore, the protocol of the incremental standardized exercise test utilized in this study seems to be reliable for the assessment of fitness and exercise intolerance for the Thoroughbred racehorses.

  • PDF

Performance Analysis of a Flow Passage Opening Device through Low Speed Aircraft Captive Flight Tests

  • Jung, Sung-Min;Park, Jeong-Bae
    • International Journal of Aerospace System Engineering
    • /
    • v.4 no.2
    • /
    • pp.5-9
    • /
    • 2017
  • In a pressurized fuel supply system of aircraft, a flow passage opening device is required to keep fuel continuously transferred from one tank to the other. The device utilizes balancing weights in order to follow up an acceleration at special conditions such as negative g. It is very difficult to test the device in a real high-speed and high-altitude test since severe test conditions and expensive supports are needed. Therefore, this paper deals with performance analysis of a flow passage opening device through low speed aircraft captive flight tests (CFT) including roll and negative-g maneuvers. It is shown that balancing weights in the device can open the passage in accordance with fuel position.

Review on the Dynamic Behavior of G7 High Speed Train(KHST) in the KTX Test Line (경부고속철도 시험선 구간에서 G7 고속전철 차량의 동특성 검토)

  • 박찬경;김영국;배대성;박태원
    • Journal of the Korean Society for Railway
    • /
    • v.4 no.4
    • /
    • pp.131-137
    • /
    • 2001
  • The dynamic behavior of high speed train is very important because of its safety and passengers' ride comfort. The railway vehicle is composed of many suspension components, such as 1st springs, 1st dampers, 2nd springs and 2nd dampers, that have an influence on the dynamic characteristics of high speed train. Also, the wheel/rail shapes and the track geometry affect the dynamic behavior of high speed train. This paper reviews the dynamic behavior of KHST in the KTX test line. The VAMPIRE program is used for this simulation. The simulation results are within the limits of safety criteria. Thus the KHST can operate safely at 350 km/h in the KTX test line.

  • PDF

A simulation study on predicting current collection performance with respect to the contact wire tension in 400km/h test run of the next high speed train HEMU-400X (차세대 고속철도 최고속도 시험에서 전차선 장력 증가 단계별 집전 성능 예측 시뮬레이션)

  • Kwon, Sam-Young;Park, Chun-Soo;An, Seung-Hwa
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.201-206
    • /
    • 2009
  • In the testing stage of HEMU-400X(next Korean high speed train) developing project, maximum speed(400km/h) tests will be conducted. On present and near future conditions of the overhead contact lines, 400km/h is over the design speed criteria. The predictions of current collection performance including the percentage loss of contact(arcs level) parameter through dynamic interaction simulation of HEMU-400X maximum speed test run are described in this paper. Various simulations are conducted at the condition of two different contact wire tensions to draw the proper contact wire increasing values in the 400km/h test line under the available contact wire tension supporting condition of that line.

  • PDF

Aerodynamic effects of subgrade-tunnel transition on high-speed railway by wind tunnel tests

  • Zhang, Jingyu;Zhang, Mingjin;Li, Yongle;Fang, Chen
    • Wind and Structures
    • /
    • v.28 no.4
    • /
    • pp.203-213
    • /
    • 2019
  • The topography and geomorphology are complex and changeable in western China, so the railway transition section is common. To investigate the aerodynamic effect of the subgrade-tunnel transition section, including a cutting-tunnel transition section, an embankment-tunnel transition section and two typical scenarios for rail infrastructures, is selected as research objects. In this paper, models of standard cutting, embankment and CRH2 high-speed train with the scale of 1:20 were established in wind tunnel tests. The wind speed profiles above the railway and the aerodynamic forces of the vehicles at different positions along the railway were measured by using Cobra probe and dynamometric balance respectively. The test results show: The influence range of cutting-tunnel transition section is larger than that of the embankment-tunnel transition section, and the maximum impact height exceeds 320mm (corresponding to 6.4m in full scale). The wind speed profile at the railway junction is greatly affected by the tunnel. Under the condition of the double track, the side force coefficient on the leeward side is negative. For embankment-tunnel transition section, the lift force coefficient of the vehicle is positive which is unsafe for operation when the vehicle is at the railway line junction.

A Study on the Vibration Characteristics due to the Running Conditions for Korean High Speed Train (한국형 고속전철의 주행조건에 따른 진동특성 분석에 관한 연구)

  • 박찬경;한영재;김영국;김석원;최강윤
    • Proceedings of the KSR Conference
    • /
    • 2003.10a
    • /
    • pp.125-130
    • /
    • 2003
  • Korean High Speed Train (KHST) designed to operate at 350km/h has been tested on high speed line in JungBu site since it was developed in 2002. The dynamic performances of railway vehicle are generally stability, safety and ride comfort. The stability performance of KHST was proved that it is stable at 400Km/h through Roller Rig test. The safety and ride comfort need to be predicted the capability of it at 350km/h by the on-line test because KHST is testing at 300km/h up to now. Therefor, in this paper, the safety and ride comfort at 350km/h are predicted the performance using the acceleration results at 300kw/h and these results show that the KHST's dynamic performances are very good. Also, it illustrate the two cases occurred the abnormal vibration of KHST during some on-line tests. The first case is that the variation of vertical acceleration of wheel is analyzed when an abrasion occur on wheel. The second case is that the lateral acceleration of wheel, bogie and body are analyzed when the KHST is unstable at high speed. The occurrences of these special phenomena were due to the some faults of the suspension and braking systems and the faults were improved. In present, it is testing with safety.

  • PDF

A Study on the Low Cost Testing System Development of the Low Speed and High Torque Harsh Reducer (저속 고토크 가혹감속기의 저비용 테스트 시스템 개발에 관한 연구)

  • Park, Taehyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.3
    • /
    • pp.379-386
    • /
    • 2022
  • The goal of this research is to verify a performance test system for a low speed, high torque, and harsh reducer at low cost. The reducer rotates a cooling fan with a diameter of 10 meters, in a high temperature (50℃) cooling tower in a geothermal power plant. It requires about 500 kgf·m torque and 47.75 kW power to rotate the fan at a maximum power condition. An expensive dynamometer is commonly used for performance test of a motor or a reducer. In this paper, a low cost system is developed using a hydraulic pump as a load unit to generate torque instead of a dynamometer. We accurately calculated the required power, the flow meter, and the pressure of the pump, and selected to design and optimize the system at minimal cost. The system also applied another reverse reducer and a gearbox to increase the rotational speed and to reduce the torque from the low speed and high torque target reducer. This allows low-cost systems to be built using inexpensive components. The developed system was able to successfully measure the high torque and the low rotational speed of the target reducer at high temperature.

A study on the pressure test of the glass window for high speed train (고속철도차량용 창문유리의 압력시험에 관한 연구)

  • Chang, Dae-Sung;Lee, Heung-Jae;Yi, Won
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.295-300
    • /
    • 2011
  • In this paper, the pressure endurance test of passenger glass window which was developed for next high speed train was studied. At first, pressure test equipment which will be able to generate the maximum pressure same as crossing between two trainsets in the tunnel was developed. Afterwards the pressure test and evaluation that were based on NFF31-314 were studied and carried out.

  • PDF

Noise Test of High-speed Train at 300km/h (경부고속철도 300km/h 주행시 소음 평가)

  • 나희승;김준엽
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.452-457
    • /
    • 2002
  • High speed railroad noise is one of the main causes of environmental impact. An estimate of the relevant noise levels is usually required in order to evaluate the noise barrier and the anti-noise trailer. This paper introduce the test procedure and the estimate for HST noise. The aim of this is to measure, by means of a test, the level of acoustic pressure present during the passing of a KTX(Korea Train Express), in order to satisfy the contractual requirements and the noise criteria. A number of measurements are carried out in order to estimate noise impact by HST along test track.

  • PDF