• Title/Summary/Keyword: Assessment unit

Search Result 1,165, Processing Time 0.031 seconds

Human and organizational factors for multi-unit probabilistic safety assessment: Identification and characterization for the Korean case

  • Arigi, Awwal Mohammed;Kim, Gangmin;Park, Jooyoung;Kim, Jonghyun
    • Nuclear Engineering and Technology
    • /
    • v.51 no.1
    • /
    • pp.104-115
    • /
    • 2019
  • Since the Fukushima Daiichi accident, there has been an emphasis on the risk resulting from multi-unit accidents. Human reliability analysis (HRA) is one of the important issues in multi-unit probabilistic safety assessment (MUPSA). Hence, there is a need to properly identify all the human and organizational factors relevant to a multi-unit incident scenario in a nuclear power plant (NPP). This study identifies and categorizes the human and organizational factors relevant to a multi-unit incident scenario of NPPs based on a review of relevant literature. These factors are then analyzed to ascertain all possible unit-to-unit interactions that need to be considered in the multi-unit HRA and the pattern of interactions. The human and organizational factors are classified into five categories: organization, work device, task, performance shaping factors, and environmental factors. The identification and classification of these factors will significantly contribute to the development of adequate strategies and guidelines for managing multi-unit accidents. This study is a necessary initial step in developing an effective HRA method for multiple NPP units in a site.

Multi-unit Level 3 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site

  • Kim, Sung-yeop;Jung, Yong Hun;Han, Sang Hoon;Han, Seok-Jung;Lim, Ho-Gon
    • Nuclear Engineering and Technology
    • /
    • v.50 no.8
    • /
    • pp.1246-1254
    • /
    • 2018
  • The importance of performing Level 3 probabilistic safety assessments (PSA) along with a general interest in assessing multi-unit risk has been sharply increasing after the Fukushima Daiichi nuclear power plant (NPP) accident. However, relatively few studies on multi-unit Level 3 PSA have been performed to date, reflecting limited scenarios of multi-unit accidents with higher priority. The major difficulty to carry out a multi-unit Level 3 PSA lies in the exponentially increasing number of multi-unit accident combinations, as different source terms can be released from each NPP unit; indeed, building consequence models for the astronomical number of accident scenarios is simply impractical. In this study, a new approach has been developed that employs the look-up table method to cover every multi-unit accident scenario. Consequence results for each scenario can be found on the table, established with a practical amount of effort, and can be matched to the frequency of the scenario. Preliminary application to a six-unit NPP site was carried out, where it was found that the difference between full-coverage and cut-off cases could be considerably high and therefore influence the total risk. Additional studies should be performed to fine tune the details and overcome the limitations of the approach.

Life Cycle Assessment for the Business Activities of Green Company -1. Analysis of Process Flow and Basic Unit (녹색기업의 사업활동 전 과정에 대한 환경성 평가 -1. 공정 흐름 및 원단위 분석)

  • Shin, Choon-Hwan;Park, Do-Hyun
    • Journal of Environmental Science International
    • /
    • v.22 no.3
    • /
    • pp.269-279
    • /
    • 2013
  • In this paper, an environmental assessment was carried out on the whole process of industrial business activities to establish a basic plan for climate change mitigation and energy independency. The whole process was divided into each discharge process in terms of water, air, solid waste, green house gases and refractory organic compounds. The flowcharts and basic unit of process were analysed for three years (2008-2010), being utilized as basic information for the life cycle assessment. It was found that the unit loading for the whole process significantly depends on changes in the operation rate change and highly concentrated wastewater inflow. About 35% of solid waste production was reduced by improving the incineration method with co-combustion in coal boiler, generating about 57% of electricity used for the whole process, and consequently reducing the energy costs. As the eco-efficiency index was found to be more than 1, compared to the previous years, it can be said that improvement in general has taken place.

Probability subtraction method for accurate quantification of seismic multi-unit probabilistic safety assessment

  • Park, Seong Kyu;Jung, Woo Sik
    • Nuclear Engineering and Technology
    • /
    • v.53 no.4
    • /
    • pp.1146-1156
    • /
    • 2021
  • Single-unit probabilistic safety assessment (SUPSA) has complex Boolean logic equations for accident sequences. Multi-unit probabilistic safety assessment (MUPSA) model is developed by revising and combining SUPSA models in order to reflect plant state combinations (PSCs). These PSCs represent combinations of core damage and non-core damage states of nuclear power plants (NPPs). Since all these Boolean logic equations have complemented gates (not gates), it is not easy to generate exact Boolean solutions. Delete-term approximation method (DTAM) has been widely applied for generating approximate minimal cut sets (MCSs) from the complex Boolean logic equations with complemented gates. By applying DTAM, approximate conditional core damage probability (CCDP) has been calculated in SUPSA and MUPSA. It was found that CCDP calculated by DTAM was overestimated when complemented gates have non-rare events. Especially, the CCDP overestimation drastically increases if seismic SUPSA or MUPSA has complemented gates with many non-rare events. The objective of this study is to suggest a new quantification method named probability subtraction method (PSM) that replaces DTAM. The PSM calculates accurate CCDP even when SUPSA or MUPSA has complemented gates with many non-rare events. In this paper, the PSM is explained, and the accuracy of the PSM is validated by its applications to a few MUPSAs.

Comparative LCA(life cycle assessment) between two different model of Electric Motor Unit(EMU) (서로다른모델의 전동차에 대한 비교 전과정평가)

  • Kim, Jin-Yong;Choi, Yo-Han;Kim, Young-Ki;Lee, Kun-Mo
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.6-14
    • /
    • 2007
  • The objective of this research is to comparative LCA(life cycle assessment) between two different model of Electric Motor Unit(EMU).the environmental impact of Aluminum body Electric Motor Unit(EMU) and Stainless Steel(STS) body Electric Motor Unit(EMU). LCA process consists of four steps which are goal, scope definition, life cycle impact analysis(LCIA) and life cycle interpretation. ISO 14044 provides the LCA standard method which can be conducted by using comparative LCA. From the research it is foung that the Aluminium Body Electric Motor Unit (EMU) is 3.6ton heaver than Stainless Steel(STS) body Electric Motor Unit(EMU). The system boundary of both Electric Motor Unit (EMU) are same life span and travel same distance. These both Electric Motor Unit (EMU) has same kind of environmental impact which is maximum Ozone Depletion(OD). During using period of these two models, the Aluminium Body Electric Motor Unit(EMU) has more global warming(GW) effect but Stainless Steel(STS) body Electric Motor Unit(EMU) has more Ozone Depletion(OD) effect. The above result is obtained by using LCA software PASS verson 3.1.3.

  • PDF

A Study on the Student Assessment of Elementary School Mathematics (초등학교 수학과 학생평가 실태 분석)

  • Lee, Jong-Euk
    • The Mathematical Education
    • /
    • v.48 no.1
    • /
    • pp.21-32
    • /
    • 2009
  • The purpose of this study is to diagnose the current states and the problems of student assessment of Elementary School Mathematics. For that purpose, this study conducted a survey and had the individual interviews. The surrey items consisted of the six main parts: questions about the development of assessment tools, the method to assess, the grading, the special supplementary courses, the opening of learning effect, and the follow-up guidances. The results of this study are as the follow First, elementary teachers depended heavily on internet sites for developing assessment problems. Second, elementary teachers made use of a performance assessment, a unit assessment, and a term examination at ordinary times. Third, unit assessment was largely referred for grading by elementary teachers. Fourth, in selecting the students for the special supplementary courses, both criterion-referenced assessment and norm-referenced assessment were considered. After finishing the special supplementary courses, additional tests were usually taken. Fifth, elementary teachers took a negative attitude in opening of learning effect. specialty opening of test paper to parents of students was done under 30%. Sixth, fellow-up guidances were the most through the classroom guidances. but consulting with parents of students was not frequently conducted by teachers.

  • PDF

Life Cycle Assessment on the Interior Panel of Electric Motor Unit (EMU) (전동차 내장판넬에 대한 전과정평가 연구)

  • Lee, Jae-Young;Choi, Yo-Han;Kim, Yong-Ki
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.5 s.36
    • /
    • pp.517-523
    • /
    • 2006
  • The sustainable development is a key issue in the whole field of economy, culture and society, which can be accomplished by the improvement of environment. Recently, life cycle assessment(LCA) has been applied to reduce environmental impacts preliminarily by evaluating the environmental performance of a product through its life cycle. In this study, life cycle assessment was performed to analyze quantitatively the environmental impact on the interior panel of electric motor unit(EMU). As a result, the interior panel with aluminum showed the most global warming(GW), while that with phenol and plastic showed high fresh water aquatic ecotoxicity(FAET) and marine water aquatic ecotoxicity(MAET), respectively. Global warming was occurred mainly due to the emission of $CO_2$ by energy consumption. FAET and MAET were caused by the pollutants released from acid-washing and paints coating process. Therefore, an environmental-friendly EMU can be designed considering the environmental impacts of interior panel.

The Development of Achievement and Assessment Standards for the 'Representation and Management of Information' Unit of 'Informatics' Curriculum for Middle School Revised in 2007 (2007년 개정 중학교 정보 과목 '정보의 표현과 관리' 영역 성취 및 평가기준 개발)

  • Kim, Kyung-Hoon;Lee, EunKyoung;Lee, YoungJun
    • The Journal of Korean Association of Computer Education
    • /
    • v.11 no.6
    • /
    • pp.53-64
    • /
    • 2008
  • The 'Informatics' curriculum for middle school revised in 2007 will be applied since 2010 in school. However, it is difficult to utilize directly school setting because educational contents presented in the curriculum are very comprehensive. Therefore, we need to present specific standards and examples to guide teaching and learning and assessment activities in school setting and right comprehension about new revised curriculum. In this study, we developed the achievement and assessment standards for the 'Representation and Management of Information' unit of Informatics curriculum for middle school revised in 2007. And then, we presented sample questions base on achievement and assessment standards we developed. The levels of the achievement unit were set in the small unit level through the understanding and the analysis of the new curriculum. We described the achievement standards from student's viewpoint and the assessment standards divide into three level(high/middle/low).

  • PDF

Stochastic FMECA Assessment for Combustion-Turbine Generating Unit in Order to RCM Schedule (복합화력발전기의 신뢰도 기반 유지보수를 위한 확률론적 FMECA 평가)

  • Joo, Jae-Myung;Lee, Seung-Hyuk;Kim, Jin-O
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.351-353
    • /
    • 2006
  • Preventive maintenance can avail the generating unit to reduce cost and gain more profit in a competitive supply-side power market. so, it is necessary to perform reliability analysis on the systems in which reliability is essential. In this paper, FMECA assessment adopted using real historical failure data in Korean power plants for apply RCM analytical method. The stochastic FMECA is an engineering analysis and a core activity performed by reliability engineers to review the effects of probable failure modes of generating unit and assemblies of the power system on system performance. Optimal RCM schedule which is considered the severity level of each generating unit and failure probability from failure prediction of generating unit can be planned using proposed FMECA with IOE index.

  • PDF

Stochastic FMECA Assessment for Optimal RCM of Combustion-Turbine Generating Unit (복합화력발전기의 신뢰도 기반 유지보수를 위한 확률론적 FMECA 평가)

  • Joo, Jae-Myung;Lee, Seung-Hyuk;Shin, Jun-Seok;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.2
    • /
    • pp.254-259
    • /
    • 2007
  • PM(Preventive Maintenance) can avail the generating unit to reduce cost and gain more profit in a competitive supply-side power market. So, it is necessary to perform reliability analysis on the power systems in which reliability is essential. Thus, to schedule optimal PM planning based on reliability that is defined RCM(Reliability-Centered Maintenance), FMECA(Failure Mode Effects and Criticality Analysis) assessment is very important. Therefore, in this paper, the procedure of FMECA assessment for optimal RCM is proposed by probabilistic approach using real historical failure data of combustion-turbine generators in Korean power systems. The stochastic FMECA is performed based on the effects of probable failure modes of combustion-turbine generating unit.