• Title/Summary/Keyword: Assembly model

Search Result 1,096, Processing Time 0.022 seconds

Heuristics Method for Sequencing Mixed Model Assembly Lines with Hybridworkstation (혼합작업장을 고려한 혼합모델 조립라인의 투입순서결정에 관한 탐색적기법)

  • 김정자;김상천;공명달
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.48
    • /
    • pp.299-310
    • /
    • 1998
  • Actually mixed assembly line is mixed with open and close type workstation. This workstation is called hybridworkstation. The propose of this paper is to determine the sequencing of model that minimize line length for actual(hybridworkstation) mixed model assembly line. we developed three mathematical formulation of the problem to minimize the overall length of a line with hybrid station. Mathematical formulation classified model by operato schedule. Mixed model assembly line is combination program and NP-hard program. Thus computation time is often a critical factor in choosing a method of determining the sequence. This study suggests a tabu search technique which can provide a near optimal solution in real time and use the hill climbing heuristic method for selecting initial solution. Modified tabu search method is compared with MIP(Mixed Integer Program). Numerical results are reported to demonstrate the efficiency of the method.

  • PDF

Simulation and Analysis of an Automative Assembly Operation at Mercedes-Benz

  • 박영홍
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1999.10a
    • /
    • pp.217-217
    • /
    • 1999
  • The main objective of this study is to simulate the design and operational policies of the assembly shop of an automotive plant for planning purposes and to find possible improvements. The simulation study was used to answer the following questions: How does the sequence affect the daily throughput\ulcorner What are the bottlenecks to the assembly lines in a given scenario\ulcorner A Simulation model was developed in accordance with the objective of this study. The model incorporates detailed workstation logic to accurately model downtime results through the use of a pull cord system. It is written with SIMAN. The discrete event feature of SIMAN does not adequately model the conveyor systems of the asembly shop. As a result, a few subroutines were added to the SIMAN modeling structures to mimic the operations of the assembly shop. Use of the model uncovered attractive improvement opportunities, such as a tremendous gain in annual volume if four additional spaces were added to a between-line buffer.

  • PDF

A Simulation Study for Analyzing a LED Assembly Process (LED 공정분석을 위한 시뮬레이션 연구)

  • Yoon, Cheol-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.4
    • /
    • pp.924-929
    • /
    • 2007
  • This paper introduces a simulation model regarding the process analysis of a LED assembly process. The objective of the simulation model is to evaluate the performance of various design aspects of process alternatives. To develop the simulation model, a time study is performed for each process. Next, by using ARENA, a simulation model is conducted based on the process analysis and the line balancing methodology. We found out several problems for the assembly process, and then suggest several alternatives to improve the system.

  • PDF

Design of a Magnet Assembly for an NMR Based Sensor Using Finite Element Analysis

  • Cho, S.I.;Chung, C.H.;Kim, S.C.
    • Agricultural and Biosystems Engineering
    • /
    • v.1 no.1
    • /
    • pp.49-53
    • /
    • 2000
  • A magnet assembly is a critical element of a nuclear magnetic resonance(NMR) based sensor. Magnetic flux density and homogeneity are essential to its optimum performance. Geometry and magnet material properties determine the magnetic flux density and homogeneity of the assembly. This study was carried out to develop the design for a magnet assembly. A 2-D finite element model for the magnetic assembly was developed using ANSYS and evaluated the effects of adding shimming frames and steel bars in the corners of the rectangular steel cover which surrounded the magnet. The assembly was manufactured and evaluated. According to the ANSYS model, modified pole frames increased magnetic flux density by 8.3% and increased homogeneity by 83%. Addition of steel bars in the corners increased the magnetic flux density by 1%, and improved homogeneity up to three times. The difference between simulated and measured magnetic flux densities at the center point of the air gap was within 2.4%.

  • PDF

A Synchronized Job Assignment Model for Manual Assembly Lines Using Multi-Objective Simulation Integrated Hybrid Genetic Algorithm (MO-SHGA) (다목적 시뮬레이션 통합 하이브리드 유전자 알고리즘을 사용한 수동 조립라인의 동기 작업 모델)

  • Imran, Muhammad;Kang, Changwook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.4
    • /
    • pp.211-220
    • /
    • 2017
  • The application of the theoretical model to real assembly lines has been one of the biggest challenges for researchers and industrial engineers. There should be some realistic approach to achieve the conflicting objectives on real systems. Therefore, in this paper, a model is developed to synchronize a real system (A discrete event simulation model) with a theoretical model (An optimization model). This synchronization will enable the realistic optimization of systems. A job assignment model of the assembly line is formulated for the evaluation of proposed realistic optimization to achieve multiple conflicting objectives. The objectives, fluctuation in cycle time, throughput, labor cost, energy cost, teamwork and deviation in the skill level of operators have been modeled mathematically. To solve the formulated mathematical model, a multi-objective simulation integrated hybrid genetic algorithm (MO-SHGA) is proposed. In MO-SHGA each individual in each population acts as an input scenario of simulation. Also, it is very difficult to assign weights to the objective function in the traditional multi-objective GA because of pareto fronts. Therefore, we have proposed a probabilistic based linearization and multi-objective to single objective conversion method at population evolution phase. The performance of MO-SHGA is evaluated with the standard multi-objective genetic algorithm (MO-GA) with both deterministic and stochastic data settings. A case study of the goalkeeping gloves assembly line is also presented as a numerical example which is solved using MO-SHGA and MO-GA. The proposed research is useful for the development of synchronized human based assembly lines for real time monitoring, optimization, and control.

A Simulation Study on the Operation of the Painted Body Storage in an Automobile Factory (자동차 공장의 Painted Body Storage 운영에 대한 시뮬레이션 연구)

  • Moon, Dug-Hee;Song, Cheng;Ha, Jae-Hoon
    • IE interfaces
    • /
    • v.18 no.2
    • /
    • pp.136-147
    • /
    • 2005
  • This paper introduces a simulation study regarding the operation of the Painted Body Storage (PBS) in an automobile factory. In the paint shop of the factory, same colored bodies are grouped together in order to increase the effectiveness of process, for example decrease the loss of cleaning the painting-gun when the color of body changes from one to another. However the production of automobiles in the assembly shop is a typical example of the mixed model assembly production. Therefore PBS locates between the paint shop and the assembly shop for control the input sequence of bodies to the assembly shop, and it enables to meet the smoothing requirement of assembly sequence. There are highly restricted constraints on the assembly sequence in a assembly shop. Those are spacing restriction and smoothing restriction. If such restrictions are violated, conveyor-stop or utility work will be necessary. Thus the major objective of PBS is to control the assembly sequence in a way to meet the two restrictions. In this paper a case study of PBS in an automotive factory is introduced. The storage/retrieval algorithms are suggested and the proposed system is verified using simulation models. Sensitivity analysis for operating factors is also conducted.

Seismic retrofit of framed structures using a steel frame assembly

  • Michael Adane;Seungho Chun;Jinkoo Kim
    • Steel and Composite Structures
    • /
    • v.46 no.6
    • /
    • pp.857-865
    • /
    • 2023
  • This study aimed to develop a seismic retrofit technique using a steel frame which can be easily transported and assembled on site. This enables the retrofit steel frame to be easily attached to an existing structure minimizing the unwanted gap between the structure and the steel frame assembly. A one-story one-bay RC frame was tested with and without seismic retrofit using the proposed steel frame to verify the seismic retrofit effect of the proposed system, and an analysis model was developed in Opensees for seismic performance evaluation of a case study soft first-story model structure retrofitted with the developed steel frame assembly. Seismic performance of the model structure was also evaluated considering soil structure interaction effect. The experimental study confirmed that the proposed seismic retrofit system can be applied effectively to improve the seismic performance of framed structures. Time history analysis results of the model structure showed that the proposed steel frame assembly was effective in increasing the seismic load resisting capacity of the soft first-story structure. However more steel frame assemblies were required to satisfy the given performance limit state of the model structure located on weak soil due to the negative soil-structure interaction effect.

Mixed Model Assembly Sequencing using Neural Net (신경망을 이용한 혼류조립순서 결정)

  • Won, Young-Cheol;Koh, Jae-Moon
    • IE interfaces
    • /
    • v.10 no.2
    • /
    • pp.51-56
    • /
    • 1997
  • This paper concerns with the problem of mixed model assembly sequencing using neural net. In recent years, because of two characteristics of it, massive parallelism and learning capability, neural nets have emerged to solve the problems for which more conventional computational approaches have proven ineffective. This paper proposes a method using neural net that can consider line balancing and grouping problems simultaneously. In order to solve the mixed model assembly sequencing of the motor industry, this paper uses the modified ART1 algorithm.

  • PDF

Load Concentration Factor Analysis of Fuel Assembly Guide Thimble (핵연료집합체 안내관의 하중집중계수 해석)

  • Lee Young-Shin;Jeon Sang-Youn
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.22 no.3 s.168
    • /
    • pp.93-100
    • /
    • 2005
  • The top and bottom nozzles of PWR fuel assembly are connected by guide thimbles and an instrumentation tube that are connected with spacer grids. The fuel rods are inserted into the each cell of spacer grids. The loads acting on the fuel assembly are transmitted to the guide thimbles through the flow plate of top nozzle The axial loads applied to the fuel assembly are not equally distributed among the guide thimble due to the geometry of the top nozzle flow plate and spacer grid. In this study, the load concentration factors for the $17\times17$ fuel assembly were calculated. The analytical model fur the calculation of the load concentration factor of top nozzle flow plate was developed using ANSYS 5.6. The finite element analyses were performed using the model composed of top nozzle, guide thimble, and spacer grid. And, the analysis results were compared with the test results.

Sequencing for Mixed-model Assembly Lines Considering Part Supplier in Just-in-time Production Systems (JIT생산시스템에서 부품공급업자를 고려한 혼합조립순서결정에 관한 연구)

  • 남궁석;이상용
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.43
    • /
    • pp.1-16
    • /
    • 1997
  • This paper improves the autonomy for supplier's schedule and the flexibility of the final assembly line. The final assembly line is a single work station and each product taking different assembly time is considered. In the assembly schedule, the heuristic method based on the goal chasing method is used. Consequently, suppliers can independently determine their output rates and thus, change their workload pattern according to their needs and priorities. Moreover, this flexibility can help to avoid expensive final-assembly-line stoppages in case of sudden part supply disruptions. The sequencing method can be easily implemented into an existing just-in-time system. In addition, the mathematical model was formulated and the algorithm was explained through the flow chart. The numerical example was given and the efficiency of this method is shown through the analysis of computational results of that example.

  • PDF