• Title/Summary/Keyword: Assembly Cost

Search Result 433, Processing Time 0.03 seconds

Automatic Generation of Assembly Sequences (조립순서의 자동생성에 관한 연구)

  • Son, Kyoung-Joon;Jung, Moo-Young
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.19 no.1
    • /
    • pp.1-17
    • /
    • 1993
  • It is well known that an assembly operation is usually constrained by the geometric interference between parts. These constraints are normally presented as AND/OR precedence relationships. To find a feasible assembly sequence which satisfies the geometric constraints is not an easy task because of the TSP(Traveling Salesman Problem) nature with precedence constraints. In this paper, we developed an automated system based on Neural Network for generating feasible assembly sequences. Modified Hopfield and Tank network is used to solve the problem of AND/OR precedence-constrained assembly sequences. An economic assembly sequence can be also obtained by applying the cost matrix that contains cost-reducing factors. To evaluate the performance and effectiveness of the developed system, a case of automobile generator is tested. The results show that the developed system can provide a "good" planning tool for an assembly planner within a reasonable computation time period.

  • PDF

A FEASIBILITY STUDY ON THE NUMERICAL PRE-ASSEMBLY SIMULATION USING 3D LASER SCANNING MEASUREMENT

  • Kyoungmin Kim ;Seok Kim ;Chan-Hyuk Park ;Kyong Ju Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1193-1198
    • /
    • 2005
  • The pre-assembly takes a large portion of the fabrication cost of steel bridges. In order to save the fabrication cost through the improvement of the conventional pre-assembling process, this research investigates a numerical pre-assembly simulation as an alternative to current pre-assembling process. The 3D laser scanning was utilized in site and measuring data for steel box were analyzed. The productivity of pre-assembly simulation system is compared with the conventional pre-assembling system. This paper identifies feasibility on the alternative pre-assembling process and then proposes the scheme of the pre-assembly simulation system development satisfying the current pre-assembly inspection of standards.

  • PDF

Economic Component Screening Procedures for Multi-Component Products Supplied with Warranty (조립제품을 구성하는 부품에 대한 전수검사 방식의 경제적 설계)

  • Chang, Young-Soon;Bai, Do-Sun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.27 no.4
    • /
    • pp.366-373
    • /
    • 2001
  • Economic component screening procedures for multi-component assembly products supplied with warranty are proposed. It is assumed that the screening variable is continuous and the performance variable is dichotomous. Logistic and normal models are considered; the proportion of conforming items is a logistic function of the screening variable in the logistic model and the screening variable given the performance variable is normally distributed in the normal model. Cost models are constructed which involve three cost components; screening inspection cost for each component, cost due to disposing a rejected component, and warranty cost for an assembly product. Methods of finding the optimal screening procedures are presented and numerical examples are given.

  • PDF

Accurate Assembly and Concurrent Design of Airframe Structures (항공기체구조의 정밀조립 및 동시설계 기술)

  • Park, Mun-Sik
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.24 no.4 s.175
    • /
    • pp.811-823
    • /
    • 2000
  • In design and manufacturing airframe structures which are composed of a lot of sub-assemblies and large complex profile shapes it is difficult to reduce so called hardware variations. Accordingly cost increasing factors for manufacturing airframe parts are much more than other machine parts because of the variability of fabricated details and assemlies. To improve cost and quality, accurate assembly methods and DPD techniques are proposed in this paper which are based upon using CAD/CAM techniques, the concept of KC's and the coordinated datum and index throughout the design, tooling, manufacturing and inspection. The proposed methods are applied to produce fuselage frame assemblies and related engineering aspects are described regarding the design of parts and tools in the context of concurrent digital definition. First articles and consequent mass production of frame assemblies shows a great improvement of the process capability ratio from 0.7 by the past processes to 1.0 by the proposed methods in addition to the cost reduction due to the less number of tools, reduced total assembly times and the space compaction needed by massive inventory. The need to achieve better Cpk, however, and future studies to be investigated will be addressed briefly.

System for analysis of product according to assembly time and varant (조립시간과 Variant를 고려한 제품구조 분석 시스템)

  • 목학수;신현창
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1995.10a
    • /
    • pp.707-710
    • /
    • 1995
  • Structure of product, which is not considered by easy of assembly, has many hidden costs. For reduction of hidden costs, concepts of line balancing and assembly-oriented design are used. We find that part of structure can be improved by concept of line balancing. To reduce assembly time and enhance easy of assembly, design principles are developed by concept of assembly-oriented design. And design principles for improvement are applied according to condition of the grasped parts of product structure. Thersfore, we could design assembly-oriented design for better structure and low cost.

  • PDF

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

Development of a High Strength Manufacturing Technology for the Shock Absorber Base Assembly Using Friction Welding (마찰용접을 이용한 고강도 쇼크업소버 베이스 어셈블리의 제조 기술 개발)

  • Chung, Ho-Yeon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.1
    • /
    • pp.90-96
    • /
    • 2011
  • The shock absorber base assembly is one of the parts in the shock absorber equipment that controls the vehicle movement. It absorbs the shock and vibration to guarantee riding stability and comfort. It demands strength, reliability and strict airtightness of the welded section because the shock absorber base assembly is a container which resists pressure and needs durability by being filled with gas and oil. However, the current engineering needs a lot of production time, has a high cost and shows a low production rate. These problem due to the eight production processes, four of which are spot welding, reinforcement welding like metal active welding (MAG), prior process of the base assembly cap and tube for precision and pressing. We will analyze the manufacturing processes of the base assembly and suggest an improved manufacturing method that uses frictional welding. The results will show that the new method of the frictional welding is better than the previous welding technique. Through the use of this concept of frictional welding, the welding conjunction will be strengthened, measurements will be more precise, and the cost and the number of processes will be reduced.

A Knowledge-based System for Assembly Process Planning (조립 공정계획을 위한 지식기반 시스템)

  • Park, Hong-Seok;Son, Seok-Bae
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.16 no.5 s.98
    • /
    • pp.29-39
    • /
    • 1999
  • Many industrial products can be assembled in various sequences of assembly operations. To save time and cost in assembly process and to increase the quality of products, it is very important to choose an optimal assembly sequence. In this paper, we propose a methodology that generates an optimal assembly sequence by using the knowledge of experts. First, a product is divided into several sub-assemblies. Next, the disassembly sequences of sub-assembly are generated using disassembly rules and special information can be extracted through the disassembly process. By combining every assembly sequence of sub-assemblies, we can generate all the possible assembly sequences of a product. Finally, the expert system evaluates all the possible assembly sequences and finds an optimal assembly sequence. It can be achieved under consideration of the parameters such as assembly operation, tool change, safety of part. basepart location, setup change, distance, and orientation. The developed system is applied to UBR(Unit Bath Room) example.

  • PDF

Evaluation System for the Correlation Coefficient of the Assemblability and Assembly Cost of Products in Bolting (볼트를 사용한 제품에서의 조립용이성과 조립비용의 상관관계 평가시스템)

  • 목학수;문광섭;김형주
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.15 no.5
    • /
    • pp.72-84
    • /
    • 1998
  • This paper studies the relationship between assemblability and assembly time. After analyzing characteristic factors of bolts and parts, seven different kinds of assemblability parameters were determined according to assembly process, and assemblability was also evaluated. MTM (Method-Time Measurement) and Work factor methods were used for an estimation of assembly time. It shows the relationship can be found on the basis of characteristic factors of parts and bolts by relational graphs and numerical formulas.

  • PDF

A Knowledge-Based System for Assembly Sequence Planning

  • Park, Hong-Seok
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.1 no.2
    • /
    • pp.35-42
    • /
    • 2000
  • To save time and cost in assembly process and to improve th quality of products, it is very important to choose and optimal assembly sequence. In this paper, we propose a methodology that generates an optimal assembly sequence by using various methods and the knowledge of experts. To illustrate the effectiveness of the proposed methodology, a knowledge-based system is developed, The built system is applied to the case of UBR(Unit Bath Room). The applying result showed the applicability of the developed system.

  • PDF