• Title/Summary/Keyword: Asphalt pavement overlay

Search Result 66, Processing Time 0.024 seconds

An Evaluation of Crack Resistance for Slag Asphalt Concrete Mixture Using Steel Slag Aggregates (제강슬래그 골재를 사용한 슬래그 아스팔트 혼합물의 균열저항성 평가)

  • Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.71-77
    • /
    • 2023
  • With the continuous industrial development, not only natural resource depletion, waste generation, but also various weather conditions are becoming more frequent. Efforts are continuing to recycle industrial by-products to overcome the climate crisis and save resources. Slag is a representative by-product generated in the steel industry, and it is characterized by improving rutting resistance and moisture sensitivity by increasing strength and reducing deformation when used as a material for asphalt concrete. On the other hand, slag has expansion properties so it is used as a relatively low-value-added material such as embankment and refilling materials. In order to expand the application of slag, an experiment was conducted to evaluate the crack resistance of slag asphalt concrete pavement. As a result of the indirect tensile strength test, it was found that the asphalt mixture using slag aggregate showed a value 1.13 times higher than that of the general HMA with the same particle size, and the toughness was 1.17 units, improving crack resistance. In addition, it was found that the failure number of the 4-point beam fatigue experiment and the slag asphalt mixture was 20,409, which was more than doubled compared to the general HMA. Furthermore, Overlay Test showed a tensile load residual rate of 4 times or more, improving crack resistance to repeated fatigue. Accordingly, the use of slag aggregate will likely have various advantages in improving the performance of asphalt concrete pavement.

A Study on Evaluation of High Early Strength Concrete as Pavement Overlay Materials for Early Traffic Opening(2) (신속개방형 콘크리트 도로포장재의 설계를 위한 평가 연구(2))

  • 엄태선;임채용;유재상;이종열;엄주용;조윤호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.233-238
    • /
    • 2001
  • In road Pavements, it is known that cement concrete pavement has superior durability, safety compared with asphalt pavement. But in repairing pavement, cement concrete pavement is not usually applied because of the length of time while the road is interrupted when using Ordinary and Rapid-hardening Portland Cement. And Super High Early Strength Cement and Ultra Super High Early Strength Cement are not favorable for ready mixed concrete because of rapid setting time, high slump loss and other restrictions. We aim to develope special cement and concrete developing 1 day strength of over 300 kg/$\textrm{cm}^2$ to open the road within one day and workable time is maintained over 1 hour that can be used as ready mixed concrete. In this study, we produced cement using rapid-hardening cement, Hauyne clinker, anhydride gypsum and accelerator and studied on its properties. The comperssive strength was over 400 kg/$\textrm{cm}^2$ and tensile at 1 day and workable time was maintained for over 1 hour.

  • PDF

A Study for Determining the Rehabilitation Method Group using NHPCI on Asphalt Concrete Pavement of National Highway (국도 아스팔트 포장의 NHPCI(National Highway Pavement Condition Index)를 활용한 보수공법그룹 결정에 관한 연구)

  • Son, Hyeon Jang;Kwon, Soo-Ahn;Lee, Jae Jun;Baek, Cheolmin;Lim, Jae Kuy;Sin, Hyun Jin
    • International Journal of Highway Engineering
    • /
    • v.15 no.2
    • /
    • pp.1-9
    • /
    • 2013
  • PURPOSES : The PMS(Pavement Management System) has been utilized in order to efficiently allocate the limited budget for the maintenance of national highway system. In the PMS of national highway, surface pavement condition is evaluated by using the VI (Visual Index). However, the VI is determined only by considering the cracking rate (%) and rut depth (mm), which is not reflecting the IRI (International Roughness Index) that is known as an important factor of pavement performance. In this study, the NHPCI (National Highway Pavement Condition Index) which includes the cracking rate (%), rut depth (mm), and IRI (m/km) is suggested for determining the rehabilitation methods group. METHODS : First, the rehabilitation methods performed between 2008 and 2010 on the national highway is classified and then, NHPCI is determined for each rehabilitation method. Next, the NHPCI for each rehabilitation method is grouped through the interval estimation of the population mean and T-test analysis. RESULTS : According to NHPCI range, the rehabilitation methods are divided into four categories: Not Required, Preventive Maintenance, Overlay Treatment (with or without cutting), and Full-scale Treatment (i.e., reconstruction). CONCLUSIONS : Based on this study, it is recommended that the appropriate NHPCI range should be determined through the combination of the rehabilitation categories and Decision Procedure of Pavement Distress Condition Visual Index.

Evaluation of Bond Performance for AC overlay on PCC Pavement (AC / PCC 복합포장 경계면 재료의 부착 성능 평가)

  • Kim, Dong kyu;Hwang, Hyun sik;Christopher, Jabonero;Ryu, Sung woo;Cho, Yoon ho
    • International Journal of Highway Engineering
    • /
    • v.18 no.5
    • /
    • pp.1-9
    • /
    • 2016
  • PURPOSES : This study focuses on the evaluation of interface performance with varying surface texture and tack coat application in an asphalt overlay. METHODS : The evaluation is carried out in two phases: tracking test and interface bond strength test. Using an image processing tool, tracking test is conducted to evaluate the susceptibility of the tack coat material to produce excessive tracking during application. Using the pull-off test method, the bond strength test is performed to determine the ability of the interface layer to resist failure. RESULTS : Results show that the underseal application yields less tracking compared to other applications. However, the bond strength is barely within the minimum acceptable value. On the other hand, RSC-4 produces higher bond strength for all surface types, but the drying time is long, which produces excessive tracking. CONCLUSIONS : While underseal application may be suitable for a trackless condition, the bond strength is less appealing compared to the rest of the tack applications available. RSC-4 demonstrated a high and consistent bond strength performance, but more time is required for drying to avoid excessive tracking. Tack coat application and surface type combination produce varying results. Therefore, these should be considered when selecting suitable future tack coat application options.

Development and Evaluation of Accelerated Reflection Cracking Test System in Shear Mode (전단 반사균열 모사 실험방법 개발 및 적용성 연구)

  • Kim, Kwang-Woo;Yim, Sung-Bin;Doh, Young-Soo;Rhee, Suk-Keun
    • International Journal of Highway Engineering
    • /
    • v.1 no.1
    • /
    • pp.97-106
    • /
    • 1999
  • This study was conducted to develop a test system for evaluating resistance against reflection cracking in shear mode caused by wheel load in asphalt concrete overlaid on the deteriorated cement concrete pavement. Reflection cracking resistance of selected polymer modified asphalt(PMA) mixtures with and without reinforcement was evaluated using this test system. It was shown that the test results accounted for the effectiveness of materials and reinforcement characteristics in terms of the difference in the resistance against reflection cracking. A shear failure life of a certain mixture was estimated with a high coefficient of determination. when the test results were used in a well known prediction model. Therefore, it seemed to be possible to use this technique for predicting a relative service life of on overlay.

  • PDF

Fractal evaluation of the level of alligator cracking in pavements

  • Vallejo, Luis E.
    • Geomechanics and Engineering
    • /
    • v.4 no.3
    • /
    • pp.219-227
    • /
    • 2012
  • Pavement management systems require systematic monitoring of pavement surfaces to determine preventive and corrective maintenance. The process involves the accumulation of large amounts of visual data, typically obtained from site visitation. The pavement surface condition is then correlated to a pavement distress index that is based on a scoring system previously established by state or federal agencies. The scoring system determines if the pavement section requires maintenance, overlay or reconstruction. One of the surface distresses forming part of the overall pavement distress index is the Alligator Crack Index (AC Index). The AC Index involves the visual evaluation of the crack severity of a section of a pavement as being low, medium, or high. This evaluation is then integrated into a formula in order to obtain the AC Index. In this study a quantification of the visual evaluation of the severity of alligator cracking is carried out using photographs and the fractal dimension concept from fractal theory. Pavements with low levels of cracking were found to have a fractal dimension equal to 1.051. Pavements with moderate levels of cracking had a fractal dimension equal to 1.1754. Pavements with high degrees of cracking had a fractal dimension that varied between 1.5037 (high) and 1.7111 (very high). Pavements with a level of cracking equal to 1.8976 represented pavements that disintegrated and developed potholes. Thus, the visual evaluation of the state of cracking of a pavement (the AC Index) could be enhanced with the use of the fractal dimension concept from fractal theory.

A Study on Life Cycle Cost Analysis of Latex Modified Concrete Pavement for Bridges (LMC 교면 포장 공법의 생애주기비용분석에 관한 연구)

  • Cho, Hyo-Nam;Choi, Hyun-Ho;Jung, Pyoung-Ki;Lim, Jong-Kwon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.4
    • /
    • pp.185-195
    • /
    • 2001
  • Latex Modified Concrete(LMC) has been widely used for the pavement of highway bridges over the past 35years around the world since it is more resistant to the intrusion of chloride ions, has higher tensile, compressive, and flexural strength, and has greater freeze-thaw resistance. However, in Korea, it has not been introduced to fields due to higher initial construction cost for its overlay compared with that of conventional pavement materials. Due to durable characteristics, it should be noted that the LMC may be more cost-effective than conventional pavements such as asphalt pavement, when life-cycle cost(LCC) concept is considered. The objective of this study is intended to suggest a practical LCC analysis model for pavement projects and to demonstrate relative cost-effectiveness of the LMC overlays in comparison with conventional pavement techniques. It may be stated that the procedure proposed in this study may be utilized for making optimal decision on cost-effective pavement design.

  • PDF

Rubblization of Thick Concrete Pavement (두꺼운 콘크리트포장의 원위치파쇄 기층화공법)

  • Lee Seung-Woo;Han Seung-Hwan;Ko Suck-Bum;Kim Ji-Won
    • International Journal of Highway Engineering
    • /
    • v.8 no.3 s.29
    • /
    • pp.105-114
    • /
    • 2006
  • A popular alternative to extend the life of aged pavement is asphalt overlay. However, it has a very serious and inherent shortcoming in deterring a reflection crack. Although joint-rehabilitation and stress-relief techniques have been applied to deter such reflection cracks in aged pavement, the techniques had a limited success only in slowing down the progress of a reflection crack. Rubblization technique rubblizes the concrete pavement slab in situ and uses the rubblized slab as the base material. Then, pavement overlay is applied to finish off the rehabilitation of aged pavement. This rubblization technique has the advantage of solving the problem of reflection cracking completely. When rubblization technique is applied, the upper layer of aged concrete pavement is rubblized between 40mm-70mm in depth. However, the lower layer is typically rubblized more than 100mm in depth. Nevertheless, it is difficult to turn the entire concrete pavement of more than 30cm in depth into rubblized aggregate of appropriate size. Thus, a simulation experiment was carried out to find the appropriate rubblized depth, which avoids the reflection cracking and still maintains the function of subbase, by varying the depth of rubblized depth in loom increments of 0cm, 10cm, and 20cm. The result indicated the optimum rubblized depth was 10cm (Lee, 2006). Additionally, a small rubblizinge equipment was developed in order to derive the rubblization technique appropriate for thick concrete pavement. This equipment was tested out on an experimental pavement, which was constructed with the same standard and specification for the road in actual use, by varying its rubblizing head shape and energy as well as the effective area of rubblization. This experiment led to a prototype equipment for rubblization of thick concrete pavement. The prototype was put into use on a highway, undergoing a test construction and monitoring afterwards. This entire process was necessary for the validation of the proposed rubblization technique.

  • PDF

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

Development of Moisture Loss Index Based on Field Moisture Measurement using Portable Time Domain Reflectometer (TDR) for Cold In-place Recycled Pavements (휴대용 TDR 함수량계로 측정한 현장 함수비를 이용한 현장 상온 재활용 아스팔트 포장의 수분 감소계수 개발)

  • Kim, Yong-Joo;Lee, Ho-Sin David;Im, Soo-Hyok
    • International Journal of Highway Engineering
    • /
    • v.13 no.2
    • /
    • pp.139-145
    • /
    • 2011
  • The practice of asphalt pavement recycling has grown rapidly over the decade, one of which is the cold in-place recycling with the foamed asphalt (CIR-foam) or the emulsified asphalt (CIR-emulsion). Particularly, in Iowa, the CIR has been widely used in rehabilitating the rural highways because it significantly increases the service life of the existing pavement. The CIR layer is typically overlaid by the hot mix asphalt (HMA) to protect it from water ingress and traffic load and obtain the required pavement structure and texture. Most public agencies have different curing requirements based on the number of curing days or the maximum moisture contents for the CIR before placing the overlay. The main objective of this study is to develop a moisture loss index that the public agency can use to monitor the moisture content of CIR layers in preparation for a timely placement of the wearing surface. First, the moisture contents were measured in the field using a portable time domain reflectometry (TDR) device. Second, the weather information in terms of rain fall, air temperature, humidity and wind speed was collected from the same location. Finally, a moisture loss index was developed as a function of initial moisture content, air temperature, humidity and wind speed. The developed moisture loss index based on the field measurements would help the public agency to determine an optimum timing of an overlay placement without continually measuring moisture conditions in the field.