• Title/Summary/Keyword: Asphalt pavement overlay

Search Result 66, Processing Time 0.026 seconds

Comparison of Performance of Non-Mill-and-Overlay and Mill-and-Overlay on Concrete Pavement (콘크리트 포장을 덧씌운 비절삭과 절삭 아스팔트 포장의 공용성 비교)

  • Choi, Mi Ran;Park, Hae Won;Jeong, Jin Hoon
    • International Journal of Highway Engineering
    • /
    • v.19 no.6
    • /
    • pp.97-103
    • /
    • 2017
  • PURPOSES : In this study, the pavement condition of non-mill-and-overlay and mill-and-overlay on deteriorated concrete pavement was compared. In addition, the suitable time to perform the initial overlay was investigated. METHODS : The condition of the pavement sections that were not additionally overlaid on non-mill-and-overlay or mill-and-overlay on deteriorated concrete pavements was investigated according to overlay pavement age. The condition of non-mill-and-overlay and mill-and-overlay sections of expressway route 25, which has more information on overlay history than other routes, was compared according to the number of times of overlay. The relation between the concrete pavement condition just before the overlay and the number of times of overlay was investigated for the non-mill-and-overlay and mill-and-overlay sections for which the first overlay was performed in the same year. RESULTS : The pavement condition of the non-mill-and-overlay sections was better than that of the mill-and-overlay sections, showing higher Highway Pavement Condition Index(HPCI) regardless of overlay pavement age. The number of reflection crackings of the non-mill-and-overlay sections was smaller than that of the mill-and-overlay sections. As a result of observing the cores obtained from the overlay sections, the proportion of the deteriorated non-mill-and-overlay sections was smaller than that of the mill-and-overlay sections. The SD measured just before the overlay on the concrete pavement for which additional overlay was not performed was smaller than that for which additional overlay was performed regardless of the milling of the concrete slab surface. The HPCI of the concrete pavement for which overlay was performed just once was higher than that for which overlay was performed more than one time. CONCLUSIONS : Accordingly, it was concluded that the condition of the non-mill-and-overlay sections was better than that of the mill-and-overlay sections. In addition, the better the condition of concrete pavement just before the initial overlay, the longer the duration of the overlay effect.

Development of Rehabilitation Criteria of National Highway Pavement (국도 아스팔트 콘크리트 포장의 보수공법 결정 기준 연구)

  • Kim, Da-Hae;Kwon, Soo-Ahn;Suh, Young-Chan;Lim, Kwang-Soo
    • International Journal of Highway Engineering
    • /
    • v.11 no.2
    • /
    • pp.37-44
    • /
    • 2009
  • Currently the reasonability of threshold values for rutting and cracking does not clearly defined at the Pavement Rehabilitation Decision Tree on national highway PMS(Pavement Management System). The goal of this study is to provide the reasonable threshold values for the national highway asphalt concrete pavement rehabilitation. To achieve this goal, test section that represents typical asphalt concrete pavement of national highway was selected and pavement export were participated. Pavement condition survey has been conducted and pavement performance data at the selected roadway section were analyzed. From this study, reasonable threshold values of Pavement Rehabilitation Decision Tree were suggested based on the pavement expert's engineering judgement. In terms of crack repairs, the application of overlay after cutting is required to deteriorated area where existing crack ratio is over 35% and just overlay is required to where crack ratio is over 20%. On rutting, rut depth over 13mm is required to overlay after cutting and rut depth over 10mm is just needed to overlay.

  • PDF

A Study on the Factors Affecting on the Life of Bonded Concrete Overlay Pavement using the LTPP Data of U.S.A (미국 LTPP Data를 활용한 접착식 콘크리트 덧씌우기 포장 수명에 영향을 미치는 인자에 관한 연구)

  • Lee, Seung Woo;Son, Hyeon Jang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4D
    • /
    • pp.555-564
    • /
    • 2011
  • More than sixty percentages of the highway constructed by concrete pavements in South Korea and over half of the concrete pavements were twenty years or older. The most of South Korea road is hard to provide a bypass in conditions of network of roads. Asphalt concrete overlay has been used for the overlay of aged concrete pavement. However, the cost of maintenance and rehabilitation in an asphalt overlay is expensive by early damage. Therefore, bonded concrete overlay was recently attempted in South Korea as an alterative method of rehabilitation for aged concrete pavement. Hence, it needed to investigate the factors to find performance of the bonded concrete overlay life. However, there is no performance data of the concrete overlay in South Korea. This study was to make a database of an affecting of the pavement life and draws statistical analysis of the performance data on the LTPP (Long Term Pavement Performance) database of U.S.A.

A Preliminary Study on Effective Rehabilitation Technique of Asphalt Concrete Pavement (아스팔트 콘크리트 포장의 최소단면 보수공법 개발을 위한 기초연구)

  • Jo, Myoung-Hwan;Kim, Nak-Seok;Cho, Gyu-Tae;Jin, Jung-Hoon
    • 한국방재학회:학술대회논문집
    • /
    • 2007.02a
    • /
    • pp.475-478
    • /
    • 2007
  • The major distresses in asphalt concrete pavement are rutting and fatigue cracking. Once the distresses are observed on pavement surface, an appropriate rehabilitation method should be found. Usually, asphalt patching or overlay methods are used to improve the pavement performance. The research presents the fundamental study on effective longitudinal rehabilitation methods for asphalt concrete pavements. The rehabilitation method will be applied to rutting that is occurred asphalt Pavement surface course and longitudinal cracking or fatigue cracking with light to moderate distress levels.

  • PDF

Evaluation of Functional and Structural Performance of Semi Rigid Overlay Pavements (반강성 덧씌우기 포장의 기능적 및 구조적 성능 평가)

  • Park, Kang Yong;Lee, Jae Jun;Kwon, Soo Ahn;Jeong, Jin Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3D
    • /
    • pp.271-278
    • /
    • 2010
  • Semi rigid pavement is a pavement type using advantages of both flexibility of asphalt pavement and rigidity of concrete pavement by infiltrating cement paste into voids of open graded asphalt mixtures. The semi rigid pavement has better smoothness and smaller driving vibration or noise comparing to the concrete pavement, and has smaller permanent deformation and has temperature falling effect comparing to the asphalt pavement. The temperature falling effect were investigated at a semi rigid overlay pavement test section, and the temperature falling and water retaining effects were verified by measuring the temperature and weight of specimens at a housetop. Horizontal and vertical stresses and strains were compared by structural analysis of the semi rigid pavement and asphalt pavement using the Abaquser o, a commercial 3D finite element analysis program. The results were verified by Bisar 3.0, a multi-layered elastic analysis program. Performance of the semi rigid pavement and asphalt pavement were compared by predicting fatigue cracking based on the structural analysis results.

Efficiency of Retarding Reflection Crack in Reinforced-and-Modified Asphalt Pavement Overlay (개질재.보강재를 이용한 덧씌우기 아스팔트 포장의 반사균열 지연 효과)

  • Kim, Kwang-Woo;Doh, Young-Soo;Lim, Sung-Bin;Rhee, Suk-Keun;Eum, Joo-Yong
    • International Journal of Highway Engineering
    • /
    • v.1 no.1
    • /
    • pp.85-96
    • /
    • 1999
  • This study was performed to evaluate performance of polymer-modified asphalt mixtures and specially designed reinforcement techniques against reflection cracking of the asphalt pavement overlay. Selected polymers were used for asphalt modification and polyester fiber, a polypropylene film (vinyl) and a grid were used for mixture reinforcement. Using the asphalt mixture with optimum asphalt content, a slab was made and cut into two pieces of specimen. A layer of grid or vinyl was placed at the bottom of specimen to strengthen the pavement layer against crack. A repeated loading was applied to the asphalt mixture specimen which is Placed on a cement concrete with a pseudo-crack. Crack propagation under repeated loading was monitored and effectiveness of the devised crack retarding techniques was evaluated. From the test results. a significant retardation of mode I crack progress was monitored from some of the modified and reinforced asphalt mixtures.

  • PDF

Performance Evaluation of Asphalt Pavement Reinforced with Glass Fiber Sheet Type of Geosynthetics (유리섬유시트 형태의 토목섬유로 보강된 아스팔트 포장의 공용성 평가)

  • Cho, Sam-Deok;Lee, Dae-Young
    • Journal of the Korean Geosynthetics Society
    • /
    • v.10 no.3
    • /
    • pp.1-8
    • /
    • 2011
  • This paper presents the performance evaluation of asphalt pavement reinforced with fiber sheet type of geosynthetics and observations conducted to evaluate the practical efficiencies and performance of overlay asphalt pavement reinforced with geosynthetics. In this study, performance evaluation were performed for the six section of construction site. The performance indcators of asphalt pavement reinforced with geosynthetics has been collected Automatic Road Analyzer (ARAN), Falling Weight Deflectometer (FWD) and have been analyzed for rutting, cracking ratio, falling weight and international roughness index. As a result of performance evaluations, geosynthetics reinforced asphalt pavement is sigficant effect on increasing a cracking resistance than the non-reinfroced asphalt pavement, also rutting and crak is slowly increase as incerasingly performance period.

Estimation of Fatigue Life of Reinforced Asphalt Pavement Overlay against Reflection Cracking due to Flexural Fracture (보강 덧씌우기 아스팔트 포장의 휨파괴에 의한 반사균열 피로수명 추정)

  • Doh, Young-Soo;Kim, Kwang-Woo
    • International Journal of Highway Engineering
    • /
    • v.2 no.4 s.6
    • /
    • pp.101-109
    • /
    • 2000
  • This study was performed to estimate fatigue life of polymer-modified and reinforced overlay asphalt mixtures with respect to reflection cracking in asphalt overlay pavement. In order to achieve the goal, the expedited reflection cracking test method was developed and applied to various mixtures and the results were compared one another with respect to the resistant characteristics of reflection cracking. The theoretical prediction equation of fatigue life for each mixture was suggested based on statistical analysis of experimental test results in the flexural failure mode. Since coefficients of correlation between estimated values and measured values were very high ($r^2=0.95$ or higher), the prediction model can be used for relative comparison of various pavement overlay choices to be used in the field.

  • PDF

Investigation into Bonding Characteristics of Tack Coat Materials for Asphalt Overlay on Concrete Pavement (콘크리트포장 위 아스팔트 덧씌우기용 택코팅 재료의 접착강도특성 연구)

  • Cho, Mun Jin
    • International Journal of Highway Engineering
    • /
    • v.15 no.4
    • /
    • pp.85-94
    • /
    • 2013
  • PURPOSES: The performance of tack coat, commonly used for layer interface bonding, is affected by application rate and curing time. In this study, bonding strength tests were performed according to the application rate and curing time of asphalt emulsion. Based on finding from this study, optimum application rates and curing times are proposed. METHODS: In order to investigate bonding characteristic of asphalt emulsion, tests were performed on both asphalt concrete pavement and portland concrete pavement. Also, asphalt emulsions were tested at the application rate of 0, 0.2, 0.4, 0.6, and $0.8{\ell}/m^2$ and at the curing time of 0, 0.5, 1, 2, and 24 hours. Pull-off test and shear bonding strength test, which commonly used for bonding strength measurement of asphalt emulsion, were adopted for this study. To assess field performance under different testing condition, asphalt emulsions were applied to in-service pavement. Throughout coefficient of determination analysis between material index properties from asphalt emulsion and mechanical response from bonding strength tests, performance correlativity was analyzed. RESULTS: Test results show that optimum application rate for asphalt overlay on asphalt concrete pavement (AOA) and asphalt overlay on concrete pavement (AOC) was $0.4{\sim}0.5{\ell}/m^2$ and $0.3{\sim}0.5{\ell}/m^2$, respectively. According to the curing time increment, tensile strength and shear strength of AOC were increased to 22~44% and 20~39%, respectively. AOA case also show strength increment in tensile strength (42%) and shear strength (9%). We tested the applicability of tack coat materials at the field sites, and our findings demonstrated that the bonding (for D and E) and rapid curing (for B, C, and D, E) performances were superior than others. Among material index properties, there was a high correlation between penetration ratio and bonding strength test result. CONCLUSIONS : Result show that interlayer bonding strength was affected by asphalt emulsion type, application rate and curing time. AOC required slightly higher application ($0.1{\ell}/m^2$) than AOA. Both AOA and AOC cases show higher strength at longer curing time. Up to 2hours of curing, rapid strength increments were observed, but strength increment ratio was decreased after 2hours of curing. From the observed correlation between penetration ratio and bonding strength, it is expected that penetration ratio can be used as one of important factors affecting bonding strength analysis.

Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance (성능보증제도를 적용한 일반국도 유지보수공사 시범사업)

  • Lim, Jaekyu;Kim, Yongjoo;Kim, Myeongil;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.