• Title/Summary/Keyword: Artificial Rock

Search Result 308, Processing Time 0.028 seconds

Development of an Artificial Neural Network Expert System for Preliminary Design of Tunnel in Rock Masses (암반터널 예비설계를 위한 인공신경회로망 전문가 시스템의 개발)

  • 이철욱;문현구
    • Geotechnical Engineering
    • /
    • v.10 no.3
    • /
    • pp.79-96
    • /
    • 1994
  • A tunnel design expert system entitled NESTED is developed using the artificial neural network. The expert system includes three neural network computer models designed for the stability assessment of underground openings and the estimation of correlation between the RMR and Q systems. The expert system consists of the three models and the computerized rock mass classification programs that could be driven under the same user interface. As the structure of the neural network, a multi -layer neural network which adopts an or ror back-propagation learning algorithm is used. To set up its knowledge base from the prior case histories, an engineering database which can control the incomplete and erroneous information by learning process is developed. A series of experiments comparing the results of the neural network with the actual field observations have demonstrated the inferring capabilities of the neural network to identify the possible failure modes and the support timing. The neural network expert system thus complements the incomplete geological data and provides suitable support recommendations for preliminary design of tunnels in rock masses.

  • PDF

Landscape Structure in the Greenbelt Zone around the Seoul, the Metropolis of Korea

  • Lee, Chang-Seok;Hong, Sun-Kee;Moon, Jeong-Suk;You, Young-Han
    • The Korean Journal of Ecology
    • /
    • v.24 no.6
    • /
    • pp.385-394
    • /
    • 2001
  • An attempt to clarify the landscape structure of urban areas was carried out in the greenbelt around Seoul, Korea's metropolis. By means of aerial photographs and a field survey, a vegetation map including land-use pattern was made. Landscape structure was described by analyzing this vegetation map and the results of phytosociological survey. Landscape element types identified were (1) secondary forest, (2) plantation, (3) cultivated field, (4) urbanized area, (5) graveyard, and (6) bare rock. Vegetation units, resulting from the phytosociological analysis, included Quercus mongolica, Q. variabilis, Q. acutissima, Pinus densiflora, Q. aliena, and Alnus japonica communities. Plantations were composed of Robinia pseudoacacia, Populus tomentiglandulosa, P. rigida, Larix leptolepis, P. koraiensis, and Castanea crenata stands. Patches near to human settlements in the lower zones of the mountains were fragmented and small but they became larger towards the higher mountain zones. On the other hand, the number of patches was fewer and their size was larger in Mt. Cheonggye more distant from the principal residential area, larger in size, and higher in elevation compared with the other 2 mountains, Mt. Daemo and Mt. Acha. Floristic composition of Mongolian oak(Q. mongolica) stand distributing in the upper part of each mountain, in which artificial interference is rare, showed a difference among those study areas different in parent rock and disturbance regime. But that of black locust(R. pseudoacacia) stand located in lowland of mountainous area, in which artificial interference is frequent was similar to each other. As the results of analyses on the frequency distribution of diameter classes of major species, dominant landscape elements, Mongolian oak forest showed different responses depending on artificial interference as continuous maintenance and retrogressive succession in the sites far from and near to the residential areas, respectively. On the other hand, black locust stands showed a probability to be restore to the native oak forest through progressive succession.

  • PDF

Application of Artificial Neural Network to the Prediction of Pollutant Concentration in Road Tunnels (인공신경망을 이용한 도로터널 오염물질 농도 예측)

  • Lee, Duck-June;Yoo, Yong-Ho;Kim, Jin
    • Tunnel and Underground Space
    • /
    • v.13 no.6
    • /
    • pp.434-443
    • /
    • 2003
  • In this study, it was purposed to develop the new method for the prediction of pollutant concentration in road tunnels. The new method was the use of artificial neural network with the back-propagation algorithm which can model the non-linear system of tunnel environment. This network system was separated into two parts as the visibility and the CO concentration. For this study, data was collected from two highway road tunnels on Yeongdong Expressway. The tunnels have two lanes with one-way direction and adopt the longitudinal ventilation system. The actually measured data from the tunnels was used to develop the neural network system for the prediction of pollutant concentration. The output results from the newly developed neural network system were analysed and compared with the calculated values by PIARC method. Results showed that the prediction accuracy by the neural network system was approximately five times better than the one by PIARC method. In addition, the system predicted much more accurately at the situation where the drivers have to be stayed for a while in tunnels caused by the low velocity of vehicles.

A Case Study of Prediction and Analysis of Unplanned Dilution in an Underground Stoping Mine using Artificial Neural Network (인공신경망을 이용한 지하채광 확정선외 혼입 예측과 분석 사례연구)

  • Jang, Hyongdoo;Yang, Hyung-Sik
    • Tunnel and Underground Space
    • /
    • v.24 no.4
    • /
    • pp.282-288
    • /
    • 2014
  • Stoping method has been acknowledged as one of the typical metalliferous underground mining methods. Notwithstanding with the popularity of the method, the majority of stoping mines are suffering from excessive unplanned dilution which often becomes as the main cause of mine closure. Thus a reliable unplanned dilution management system is imperatively needed. In this study, reliable unplanned dilution prediction system is introduced by adopting artificial neural network (ANN) based on data investigated from one underground stoping mine in Western Australia. In addition, contributions of input parameters were analysed by connection weight algorithm (CWA). To validate the reliability of the proposed ANN, correlation coefficient (R) was calculated in the training and test stage which shown relatively high correlation of 0.9641 in training and 0.7933 in test stage. As results of CWA application, BHL (Length of blast hole) and SFJ (Safety factor of Joint orientation) show comparatively high contribution of 18.78% and 19.77% which imply that these are somewhat critical influential parameter of unplanned dilution.

Geomechanical properties of synthesised clayey rocks in process of high-pressure compression and consolidation

  • Liu, Taogen;Li, Ling;Liu, Zaobao;Xie, Shouyi;Shao, Jianfu
    • Geomechanics and Engineering
    • /
    • v.20 no.6
    • /
    • pp.537-546
    • /
    • 2020
  • Oil and natural gas reserves have been recognised abundantly in clayey rich rock formations in deep costal reservoirs. It is necessary to understand the sedimentary history of those reservoir rocks to well explore these natural resources. This work designs a group of laboratory experiments to mimic the physical process of the sedimentary clay-rich rock formation. It presents characterisation results of the physical properties of the artificial clayey rocks synthesized from illite clay, quartz sand and brine water by high-pressure consolidation tests. Special focus is given on the effects of illite clay content and high-stress consolidation on the physical properties. Multi-step loaded consolidation experiments were carried out with stress up to 35 MPa on mixtures constituting of the illite clay, quartz sand and brine water with five initial illite clay contents (w=85%, 70%, 55%, 40% and 25%). Compressibility and void ratio were characterised throughout the physical compaction process of the mixtures constituting of five illite clay contents and their water permeability was measured as well. Results show that the applied stress induces a great reduction of clayey rock void ratio. Illite clay contents has a significant influence on the compressibility, void ratio and the permeability of the physically synthesized clayey rocks. There is a critical illite clay content w=70% that induces the minimum void ratio in the physically synthesised clayey rocks. The SEM study indicates, in the high-pressure synthesised clayey rocks with high illite clay contents, the illite clay minerals are located in layers and serve as the material matrix, and the quartz minerals fill in the inter-mineral pores or are embedded in the illite clay matrix. The arrangements of the minerals in microscale originate the structural anisotropy of the high-pressure synthesised clayey rock. The test findings can give an intuitive physical understanding of the deep-buried clayey rock basins in energy reservoirs.

Study on the Ecological Restoration of Rock-exposed-cut-slope by Natural Topsoil Restoration Methods : In Case of Won-Ju Experiment (자연표토 복원공법에 의한 암절취비탈면의 생태적 복원에 관한 연구 : 원주사례지역을 중심으로)

  • Nam, Sang-Joon;Suk, Won-Jin;Kim, Nam-Choon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.2 no.4
    • /
    • pp.54-63
    • /
    • 1999
  • This study was conducted to suggest the ecological restoration and environmentally friendly revegetation technology for the rock-exposed cut-slopes by the Natural Topsoil Restoration Methods (NTRM) with the following restoration objectives; (1) prevention or reduction of wind and water erosion, (2) provision of food and cover for variety of animal species, (3) improvement of the visual or aesthetic quality of the disturbed slopes. On Nov. in 1995, the 5cm thick layer of artificial soil and 2cm thick layer of straw-mulching was attached at rock-exposed cut-slopes by NTRM without using anchor wire and anchor pin. The main results during four years surveying on the ground-coverage effect, plant growth, species diversity and importance values were summarized as follows. 1. Artificial soil attached at rock exposed cut-slopes was not eroded until recovered by tree and herbaceous vegetation in spite of not using anchor wire and anchor pin. Also it shows low soil hardiness and has almost the same amount of bacteria and fungi with in surrounding natural topsoil. 2. In 'combination for the woody vegetation', Lespedeza cyrtobotrya, Albizzia julibrissin, Rhus chinensis, Indigofera pseudo-tinctoria occupied upper layer vegetation. Since three years after seeding, Indigofera pseudo-tinctoria had overwhelmed the other woody plants and cool season foreign grasses, Erigeron canadensis, Taraxacum mongolicum, Commelina communis, Arundinella hirta (Thunberg) and Oenothera erythrosepala grows at lower part of the vegetation, 3. The heights of the Rhus chinensis grows 1.8m, Indigofera pseudo-tinctoria 2.0m, so it seems that the objectives of woody vegetation with native plants could be accomplished. 4. After 4 years later after seeding in 'combination for the herbaceous vegetation', the most dominant plant was Indigofera pseudo-tinctoria, the next was in order of cool-season grasses, Taraxacum mongolicum, Erigeron canadensis, lxeris dentata (Thunberg), Oenothera erythrosepala, Arundinella hirta (Thunberg). The diversity index in 'combination for woody vegetation' was higher than that in 'combination for the herbaceous vegetation'. The tendency of the intrusion of secondary succession plants was more effective in 'combination for the herbaceous vegetation' than in 'combination for the woody vegetation'.

  • PDF

A Study on the Effect of Artificial Cutting Slot on the Fragmentation and Vibration Propagation in the Full-scaled Concrete Block Blasting (콘크리트 블록 발파 실험을 통한 인공 슬롯 자유면이 진동전파 및 파쇄효과에 미치는 영향에 관한 연구)

  • Oh, Se-Wook;Min, Gyeong-Jo;Park, Se-Woong;Park, Hoon;Noh, You-Song;Suk, Chul-Gi;Cho, Sang-Ho
    • Tunnel and Underground Space
    • /
    • v.28 no.6
    • /
    • pp.692-705
    • /
    • 2018
  • Ground vibration is one of the remarkable issues in tunnel blasting. In recent studies, to improve the fragmentation with reduction of ground vibration in tunnel blasting, a vibration-controlled blasting method with artificial cutting slot near the center-cut holes has been suggested. This study examines the effect of the different arrangement of artificial cut-slot on the vibration reduction and fragmentation by performing the full-scaled concrete block blast experiments and the numerical simulations with 3D-DFPA. The results show that the existence of artificial slot contributes to the improvement of vibration reduction, blast fragmentation and the efficiency of the cutting slot blast. It can be explained that the artificial slot play a free surface role and should decrease the burden between the cut holes. Crater volumes of the blasted concrete blocks were measured by 3-dimensional digital image analysis and compared with the ideal standard crater volume which can be calculated by theoretical standard blast design method. As a result, the ratio of burden and hole diameter which should achieve the standard crater in the cut-hole blasting were suggested.

The design of outlet in inter-cross slope with tunnel which it applied forming artificial ground (인공지반을 적용한 사교하는 사면에서의 터널 갱구부 설계)

  • Park, Chal-Sook;Kwan, Han;Lee, Kyu-Tak;Kim, Bong-Jae;Yun, Yong-Jin;Kim, Kwang-Hee
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1532-1548
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. The tunnel outlet was planned to be made after installing slope stabilization system on natural slope there. Generally, the tunnel outlet is made perpendicularly to the slope, but in this case, it had to be made obliquely to the slope for not interrupting flow of river. Because of excavation in condition of natural slope caused to deflecting earth pressure, the outlet couldn't be made. So, artificial ground made with concrete that it was constructed in the outside of tunnel for producing the arching effect which enables to make a outlet. We were planned tunnel excavation was carried out after artificial ground made. Artificial ground made by poor mix concrete of which it was planned that the thickness was at least 3.0m height from outside of tunnel lining and 30cm of height per pouring. Spreading and compaction was planned utilized weight of 15 ton roller machine. In order to access of working truck, slope of artificial ground was designed 1:1.0 and applied 2% slope in upper pert of it for easily drainage of water. In addition to, upper pert of artificial ground was covered with soil, because of impaction of rock fall from upper slope was made minimum. The tunnel excavation of the artificial ground was designed application with special blasting method that it was Super Wedge and control blasting utilized with pre-percussion hole.

  • PDF

Dynamic Frictional Behavior of Artificial Rough Rock Joints under Dynamic Loading (진동하중 하에서 거친 암석 절리면의 동력 마찰거동)

  • Jeon Seok-Won;Park Byung-Ki
    • Tunnel and Underground Space
    • /
    • v.16 no.2 s.61
    • /
    • pp.166-178
    • /
    • 2006
  • Recently, the frequency of occurring dynamic events such as earthquakes, explosives blasting and other types of vibration has been increasing. Besides, the chances of exposure for rock discontinuities to free faces get higher as the scale of rock mass structures become larger. For that reason, the frictional behavior of rock joints under dynamic conditions needs to be investigated. In this study, artificially fractured rock joint specimens were prepared in order to examine the dynamic frictional behavior of rough rock joint. Roughness of each specimen was characterized by measuring surface topography using a laser profilometer and a series of shaking table tests was carried out. For mated joints, the static friction angle back-calculated ken the yield acceleration was $2.7^{\circ}$ lower than the tilt angle on average. The averaged dynamic friction angle for unmated joints was $1.8^{\circ}$ lower than the tilt angle. Displacement patterns of sliding block were classified into 4 types and proved to be related to the first order asperity of rock joint. The tilt angle and the static friction angle for mated joints seem to be correlated to micro average inclination angle which represents the second order asperity. The tilt angle and the dynamic friction angle for unmated Joints, however, have no correlation with roughness parameters. Friction angles obtained by shaking table test were lower than those by direct shear test.

On the Evaluation of Construction Standards Based on Seismic Velocities Obtained In-Situ and through Laboratory Rock Tests (현장 및 실내 측정 탄성파 속도에 근거한 암반평가 기준에 대한 고찰)

  • Lee, Kang Nyeong;Park, Yeon Jun
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.230-242
    • /
    • 2017
  • Seismic velocities measured from in-situ tests (n=177) and through rock core samples (n=1,035) are reviewed in light of construction standards, widely used standards as a first-hand approximation of rock classification solely based on seismic velocities. In-situ down hole tests and refraction survey for soft rocks showed seismic velocities of 1,400~2,900 m/s which is faster than those specified in construction standards. For moderate~ hard rocks, in-situ down hole tests and refraction survey showed 2,300~3,800 m/s which roughly corresponds with the range specified in the construction standards. A similar trend is also observed for seismic velocities measured from rock core samples. The observed differences between construction standards and seismic velocities can be explained in two ways. If construction standards are correct the observed differences may be explained with seismic velocities affected by underlying fast velocities and also possibly with selection of intact cores for velocity measurement. Alternatively, construction standards may have intrinsic problems, namely artificial discrete boundaries between soft rocks and moderate rocks, application of foreign standards without consideration of geologic setting and lack of independent verification steps. Therefore, we suggest a carefully designed verification studies from a test site. We also suggest that care must be exercised when applying construction standards for the interpretation and accessment of rock mass properties.