• Title/Summary/Keyword: Architectural Activity

Search Result 220, Processing Time 0.027 seconds

Vision-Based Activity Recognition Monitoring Based on Human-Object Interaction at Construction Sites

  • Chae, Yeon;Lee, Hoonyong;Ahn, Changbum R.;Jung, Minhyuk;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.877-885
    • /
    • 2022
  • Vision-based activity recognition has been widely attempted at construction sites to estimate productivity and enhance workers' health and safety. Previous studies have focused on extracting an individual worker's postural information from sequential image frames for activity recognition. However, various trades of workers perform different tasks with similar postural patterns, which degrades the performance of activity recognition based on postural information. To this end, this research exploited a concept of human-object interaction, the interaction between a worker and their surrounding objects, considering the fact that trade workers interact with a specific object (e.g., working tools or construction materials) relevant to their trades. This research developed an approach to understand the context from sequential image frames based on four features: posture, object, spatial features, and temporal feature. Both posture and object features were used to analyze the interaction between the worker and the target object, and the other two features were used to detect movements from the entire region of image frames in both temporal and spatial domains. The developed approach used convolutional neural networks (CNN) for feature extractors and activity classifiers and long short-term memory (LSTM) was also used as an activity classifier. The developed approach provided an average accuracy of 85.96% for classifying 12 target construction tasks performed by two trades of workers, which was higher than two benchmark models. This experimental result indicated that integrating a concept of the human-object interaction offers great benefits in activity recognition when various trade workers coexist in a scene.

  • PDF

ACTIVITY-BASED STRATEGIC WORK PLANNING AND CREW MANAGEMENT IN CONSTRUCTION: UTILIZATION OF CREWS WITH MULTIPLE SKILL LEVELS

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;SangHyun Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.359-366
    • /
    • 2013
  • Although many research efforts have been conducted to address the effect of crew members' work skills (e.g., technical and planning skills) on work performance (e.g., work duration and quality) in construction projects, the relationship between skill and performance has generated a great deal of controversy in the field of management (Inkpen and Crossan 1995). This controversy can lead to under- or over-estimations of the overall project schedule, and can make it difficult for project managers to implement appropriate managerial policies for enhancing project performance. To address this issue, the following aspects need to be considered: (a) work performances are determined not only by individual-level work skill but also by the group-level work skill affected by work team members, each member's role, and any working behavior pattern; (b) work planning has significant effects on to what extent work skill enhances performance; and (c) different types of activities in construction require different types of work, skill, and team composition. This research, therefore, develops a system dynamics (SD) model to analyze the effects of both individual-and group-level (i.e., multi-level) skill on performances by utilizing the advantages of SD in capturing a feedback process and state changes, especially in human factors (e.g., attitude, ability, and behavior). The model incorporates: (a) a multi-level skill evolution and relevant behavior development mechanism within a work group; (b) the interaction among work planning, a crew's skill-learning, skill manifestation, and performances; and (c) the different work characteristics of each activity. This model can be utilized to implement appropriate work planning (e.g., work scope and work schedule) and crew management policies (e.g., work team composition and decision of each worker's role) with an awareness of crew's skill and work performance. Understanding the different characteristics of each activity can also support project managers in applying strategic work planning and crew management for a corresponding activity, which may enhance each activity's performance, as well as the overall project performance.

  • PDF

Risk Assessment Method for Activities of Apartment Construction (공동주택 건축공사 단위작업의 위험성 평가 방법)

  • Park, Sungpyo;Choi, Jae-Wook;Lee, Chansik
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.135-145
    • /
    • 2020
  • Recently, the disaster rate of the construction industry has increased with high-rise, and complexity of the building, unlike the decrease in the disaster rate in other industries. Although risk assessment is performed to reduce the occurrence of disasters, it is difficult to estimate the risks accurately due to activity in which no disaster has occurred, and inconsistencies in the level of details of work. In this study, in order to evaluate the risk of the major activity for the apartment construction work, the activity was identified by referring to the risk assessment model of construction industry type by the KOSHA. The construction work types and activities were consistently organized in level of work into nine work types and 82 activities were through experts consultation. Analyzing the disaster types that occurred during work through KOSHA disaster cases, calculating the probability of disaster occurrence according to the type of disaster, and combining the probability of disaster with the severity of disaster to estimate the risk assessment method was presented. Using the daily report of the construction site of the apartment, the results of a case study confirmed the validity of the risk calculation method presented in this study.

The Effect of Seasonal Change in Characteristics of Hygiene Activity on Domestic Hot Water Energy Consumption (거주자 위생활동 특성의 계절적 변화가 급탕 에너지 소비량에 미치는 영향)

  • Park, Kwang-il;Kwak, In-Gyu;Mun, Sun-Hye;Huh, Jung-Ho
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.5
    • /
    • pp.51-58
    • /
    • 2018
  • The purpose of this study was to analyze the effect of seasonal change in characteristics of hygiene activity on domestic hot water energy consumption. With 16 residents of 4 households, the data about frequency of hygiene activity and water temperature was collected from February to August, 2017. The results of collected data discovered that the frequency of hygiene activity was higher especially in summer, whereas the consumption of warm water they used was higher in winter. The seasonal change in characteristics of hygiene activity was analyzed to be changed and strongly influenced by outdoor temperature. The influence of characteristics of hygiene activity on hot water consumption was analyzed. There was 13% of difference between consumption that was calculated taking characteristics of hygiene activity into account and consumption that was not. Therefore, this study suggested hygiene activity schedule, hot water profile and hot water consumption pattern, which can be utilized for improving simulation as well.

Determination of 226Ra in TENORM Sample Considering Radon Leakage Correction

  • Lim, Sooyeon;Syam, Nur Syamsi;Maeng, Seongjin;Lee, Sang Hoon
    • Journal of Radiation Protection and Research
    • /
    • v.46 no.3
    • /
    • pp.127-133
    • /
    • 2021
  • Background: Phosphogypsum is material produced as a byproduct in fertilizer industry and is generally used for building materials. This material may contain enhanced radium-226 (226Ra) activity concentration compared to its natural concentration that may lead to indoor radon accumulation. Therefore, an accurate measurement method is proposed in this study to determine 226Ra activity concentration in phosphogypsum sample, considering the potential radon leakage from the sample container. Materials and Methods: The International Atomic Energy Agency (IAEA) phosphogypsum reference material was used as a sample in this study. High-purity germanium (HPGe) gamma spectrometry was used to measure the activity concentration of the 226Ra decay products, i.e., 214Bi and 214Pb. Marinelli beakers sealed with three different sealing methods were used as sample containers. Due to the potential leakage of radon from the Marinelli beaker (MB), correction to the activity concentration resulted in gamma spectrometry is needed. Therefore, the leaked fraction of radon escaped from the sample container was calculated and added to the gamma spectrometry measured values. Results and Discussion: Total activity concentration of 226Ra was determined by summing up the activity concentration from gamma spectrometry measurement and calculated concentration from radon leakage correction method. The results obtained from 214Bi peak were 723.4 ± 4.0 Bq·kg-1 in MB1 and 719.2 ± 3.5 Bq·kg-1 in MB2 that showed about 5% discrepancy compared to the certified activity. Besides, results obtained from 214Pb peak were 741.9 ± 3.6 Bq·kg-1 in MB1 and 740.1 ± 3.4 Bq·kg-1 in MB2 that showed about 2% difference compared to the certified activity measurement of 226Ra concentration activity. Conclusion: The results show that radon leakage correction was calculated with insignificant discrepancy to the certified values and provided improvement to the gamma spectrometry. Therefore, measuring 226Ra activity concentration in TENORM (technologically enhanced naturally occurring radioactive material) sample using radon leakage correction can be concluded as a convenient and accurate method that can be easily conducted with simple calculation.

LEAN CONSTRUCTION MANAGEMENT OF BPIMT(BUILDIN-CONSTRUCTION PROCESS INNOVATION MANAGEMENT TOOLS & TECHNIQUES) THAT BASED VSM &TACT

  • Sang-Hyuk Lee;Chul-Woo Lim;Chang-duk Kim;Sang-Wook Suh;Yoon-Ki Choi;Jae-Youl Chun;Jung-Ho Yu
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1089-1093
    • /
    • 2005
  • Proving the effect of lean construction has yet to be done for its staying poor basic building though there has been efforts and wants to introduce the theory and concept of lean construction in practical site. Therefore, we need to specify the methods of productivity improvement and construction process through various adaptations in the site. Also, to apply such improvement methods systematically, we need active participation of owners, contractors and supply chain members in relation to construction industry and are also require appropriate methods to adapt. At first, this study thinks over the techniques of lean construction that has been verified through studies carried before. For second, it selects the technique of lean construction with the practicality in the construction site. For third, it is aimed to make a manual of lean process management by the use of TACT and V.S.M. For fifth, it will show the method of management for repeated activity and develop a guide-line and procedure that applies the concept of work sequence and resource equalization to each phase of process management. At last, it will show methods of reflecting V.S.M. to improve and grasp the waste factor from the step of managing an activity process and develop the form to analyze the waste in construction site by mapping the value flow.

  • PDF

Analysis and improvement plan for job stress relief activities of technical personnel in architectural design offices -based on staff- (건축 설계사무소 기술인력의 직무스트레스 해소활동 분석 및 개선방안 -사원을 중심으로-)

  • Cho, Sang-Hyeok;Gil, Min-Wook;Ahn, Jong-Hyeok;Shin, Won-Sang;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.125-126
    • /
    • 2022
  • Office workers at the architectural design office are under job stress for various reasons such as excessive working hours, friction with the site, and unpredictability of work. This can increase not only the negative image of office workers in the construction industry, but also the avoidance of young manpower in the future. This study investigated the specific purpose of each activity as a problem of job stress relief activities in the architectural design office, and the specific purpose and goal setting of each activity as a way to improve job stress relief activities.

  • PDF

A Study on the Connection between Contemporary Ecological-Architecture and Nature (현대건축에서의 생태적 건축공간과 자연과의 관계 양상에 관한 고찰)

  • 이윤희;이영수
    • Korean Institute of Interior Design Journal
    • /
    • v.13 no.4
    • /
    • pp.56-65
    • /
    • 2004
  • Contemporary Architecture is showing many aspects on the ground of ecological paradigm, while, searching for a new architectural direction to make importance of environment that has been still little accounted of a subject of discussion. And 'sustainability'will become a central concept of a Contemporary architectural topic, continuously. With a demand of the time, ecological inclinations have been started to develop a collective low-rise housing project. It is going to expands several fields, but for reasons of social economic activity for human fundamental being, potentialities of basic problem solution are enough for ecologyㆍenvironment, but distinct direction and measures are still not obvious conditions. This study is for healing restoration in global environment, with architectural approach, through analyzing relation between ecological architectural space and nature, and abstracts various inter-relational aspect's specific character. the purpose of this study is another approach of intimate relation of ecological architecture and nature. Therefore, this study is significant to be on the search for a start to suggest a new point of view to ecological architectural space.