• Title/Summary/Keyword: Approval of business plan

Search Result 13, Processing Time 0.018 seconds

Risk Factor Classification and Weight Estimation for Urban Regeneration Project (도시재생사업의 리스크요인 분류 및 중요도 산정)

  • Cho, Jae-Kyung;Hyun, Chang-Taek;Yoon, You-Sang;Jin, Run-Zhi;Cha, Yong-Woon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.89-99
    • /
    • 2012
  • Urban regeneration projects tingeing the shape of mixed-use development, due to the nature of the business, involve risk factors such as protracted business conflict among participations, subjects, complex approval and permission procedure, frequent policy changes, etc. Therefore, systematic risk management is needed to effectively manage the numerous risk factors that may occur during the process course of project. However, risk management of large and complex development projects such as urban regeneration projects is in the introduction stage yet and somewhat one time risk management plan has been established. Therefore, in this study, in order to systematic risk management of urban regeneration projects inhered numerous risk factors, risk factors for urban regeneration projects through preceding studies and case studies were presented. Also risk factors are classified in accordance with business propulsion phase, by estimating the importance for these, step by step emphasis on managed subjects of risk management was proposed.

A Study on the Realities and the Subject of Environmental Management for Small and Medium-Sized Companies in Gangwon Area (강원지역 중소기업의 환경경영 실태와 과제)

  • Jeon, Yeong-Seung;Park, Eun-Jeong
    • Korean Business Review
    • /
    • v.17
    • /
    • pp.53-81
    • /
    • 2004
  • The purpose of this study is to understand the realities and the subject of environmental management for small and medium-sized companies in Gwangwon area, through surveying the present status as to acquiring the certification of ISO14001, and to seek for a plan to facilitate environmental management. Given summarizing key results, those are as follows. First, while the number of companies in our country which acquired the certification of ISO14001, amounts to 1,215 businesses as of April of 2003, the number of small and medium-sized companies in Gwangwon area which obtained the certification of ISO14001 reached only 26 businesses, the lowest level among metropolitan municipalities. Second, for the reason that companies who didn't acquire the certification, strive not to receive the certification, it did present the point that' costs to be needed in acquiring and maintaining the certification are larger than practical benefit. Third, the biggest reason for either companies which did not acquire the certification of ISO14001 or companies which did (try to) acquire the certification of ISO1400, was, enhancement of a corporate image,' and the effect after a company who obtained the certification introduced the environmental management system, was also shown to be 'the improvement of a corporate image.' Fourth, many companies who acquired the certification of ISO1400 pointed out the response related to 'burden on document creation and costs' and 'lack of manpower' as problems when introducing the environmental management system. On the basis of major results of a study as the above, given presenting the subject and a plan for activating the environmental management of small and medium-sized companies in Gwangwon area, those are as follows. First, because most of companies who did not obtain the certification of ISO1400 have low recognition of ISO14001, it needs continuous and positive publicity, education and a training system. Second, it requires to carry out an educational program to nurture professional manpower due to lack of manpower relevant to environmental management, to expand payment of subsidies, to open exclusive-charge department and consulting contact, to have the relevant information be database and to develop software. Third, in order to make the certification obtained through inexpensive costs and simple procedures, it needs to positively consider the creation of public approval system for a small and medium-sized company, group approval system, industrial-complex approval system, and others.

  • PDF

A Study on the Factors affecting the Duration of Urban Redevelopment Projects - Based on the Project Area, Economic and Locational Characteristics - (도시정비형 재개발사업 소요기간의 영향요인 - 사업구역과 경제적 및 입지적 특성을 바탕으로 -)

  • Lee, Jaewon;Bae, Sangyoung;Jeong, Bosun;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.61-68
    • /
    • 2021
  • This study analyzed the influencing factors for urban redevelopment projects with a relatively long project duration in the context of Seoul's increasing urbanization rate and aging. Among the business areas that have been designated since 2005 and have been approved for the management and disposal plan of the entire Seoul area, 75 business areas have been set as targets. A hedonic price model was used to analyze the project area, economic, and locational characteristics as independent variables with the project duration from designation of zones to approval of management and disposal plans as dependent variables. As a result of the analysis, the smaller the project area, the larger the area occupied per union member, the larger the land price change rate, and the smaller the KOSPI index, the shorter the required period. This study has the distinction of empirically analyzing the effect of characteristic variables considering size and economic and locational characteristics on period. It provides implications that the area of the business area, the number of union members, and economic conditions should be considered when establishing a business area.