Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

도로터널 굴착공사의 적정공기 판단기준 (Optimum Construction Duration for Road Tunnel Excavation Works)

  • 김하나;김대영;김대영;정성춘;허영기
    • 대한건축학회논문집:구조계
    • /
    • 제34권4호
    • /
    • pp.59-64
    • /
    • 2018
  • Construction schedule acceleration due to unreasonable construction planning frequently leads to construction accidents. In order to avoid such inevitable acceleration and to ensure safety in construction sites, there is a need for objective standards to determine appropriate construction duration for each construction process earlier in the process. In order to achieve the goal, intensive experts interviews were firstly conducted to identify candidate drivers affecting construction schedule of road tunnel excavation works. Then, a total of 34 field data was collected from on-going sites to analyze. It was found that actual excavation length per one day on site is varied mostly by Rock Mass Rating(RMR) types from various statistical analyses. Therefore an one-way table of excavation length per a day by RMR types were presented in a form of percentile. The results will help industry experts determine the most appropriate construction schedule for the works, which eventually lead to a zero accident site in many ways.

Formwork System Selection Model for Tall Building Construction Using the Adaboost Algorithm

  • Shin, Yoon-Seok
    • 한국건축시공학회지
    • /
    • 제11권5호
    • /
    • pp.523-529
    • /
    • 2011
  • In a tall building construction with reinforced concrete structures, the selection of an appropriate formwork system is a crucial factor for the success of the project. Thus, selecting an appropriate formwork system affects the entire construction duration and cost, as well as subsequent construction activities. However, in practice, the selection of an appropriate formwork system has depended mainly on the intuitive and subjective opinion of working level employees with restricted experience. Therefore, in this study, a formwork system selection model using the Adaboost algorithm is proposed to support the selection of a formwork system that is suitable for the construction site conditions. To validate the applicability of the proposed model, the selection models Adaboost and ANN were both applied to actual case data of tall building construction in Korea. The Adaboost model showed slightly better accuracy than that of the ANN model. The Adaboost model can assist engineers to determine the appropriate formwork system at the inception of future projects.

철도 교량공사의 적정공사기간 산정을 위한 비작업일 산정에 관한 연구 (A Study on Considering Non-Working Days for Determination Normal Project Duration in the Railway Bridgework Construction)

  • 채수민;이상혁;박형근
    • 대한토목학회논문집
    • /
    • 제41권5호
    • /
    • pp.601-608
    • /
    • 2021
  • 최근 건설공사에서 근로기준법의 개정, 이상 기후의 증가로 인한 작업가능일수의 감소와 비작업일수의 증가에도 불구하고 이를 반영한 표준 건설공사기간이 마련되어 있지 않다. 이로 인해 현장에서 적정공사기간을 산정하더라도 예기치 못한 상황에 의해 공기지연이 발생하고 있는 실정이다. 따라서 본 연구에서는 기존의 방식에 건설 제반여건의 변화와 기후변화를 반영한 철도 교량공사의 비작업일수 산정방법을 제시하고, 이 산정방법을 철도 교량공사에 반영하여 전국의 지역별·월별 비작업일수를 산정하였다. 그 결과, 국내의 지역별·월별 비작업일수를 도출하였고, 이를 통해 지역적 특성과 공종별 특성을 반영한 정확한 공사기간의 규정 및 기준의 필요성을 제시했다.

공사기간 영향요인에 따른 생산성의 OLAP 분석과 의사결정트리 분석 (OLAP and Decision Tree Analysis of Productivity Affected by Construction Duration Impact Factors)

  • 류한국
    • 한국건축시공학회지
    • /
    • 제11권2호
    • /
    • pp.100-107
    • /
    • 2011
  • 건설공사의 공사기간은 건설프로젝트의 성공적인 완수를 위하여 중요한 부분을 차지하기 때문에 공사기간에 영향을 미치는 요인들을 체계적으로 관리하는 것이 필요하다. 최근에는 건설 제도적 변화로 건설공사의 공사기간에 대한 관심이 증대되고 있다. 그러나 건설 프로젝트의 공사기간에 미치는 영향요인은 매우 다양하며, 각 요인들 중 어떤 요인이 어느 정도 작업의 생산성에 영향을 미치는지에 대한 데이터의 체계적인 활용이 부족하다. 또한 특정 프로젝트, 특정 작업, 특정 협력업체 등에 영향을 미치는 요인이 무엇인지 또는 전체 프로젝트에 공통적으로 영향을 미치는 요인이 무엇인지를 인식하는 것조차 어려운 경우가 많다. 그러나 데이터 웨어하우스 기술의 다차원 분석을 활용함으로써 다양한 각도에서의 공사기간 영향요인이 미치는 생산성을 파악할 수 있다. 이에 본 연구는 건설공사에서 발생하는 다양한 영향요인에 따른 작업 생산성 데이터를 다차원적으로 분석하고 의사결정에 활용할 수 있는 데이터 마이닝 기술을 적용하여 기존 생산성 데이터들을 효과적으로 활용하는 방법을 제시한다.

공공기관 발주 대형건축공사 실시설계 기간에 대한 분석 및 개선방안 -2009년부터 2014년까지 공공발주 맞춤형 서비스 프로젝트를 중심으로 - (An Analysis of the Duration of the Construction Document Phase of Large Public Building Projects Delivered by the Total Solution Service from 2009 to 2014)

  • 정우영;이태원;이풍욱;이강
    • 한국건설관리학회논문집
    • /
    • 제16권4호
    • /
    • pp.89-97
    • /
    • 2015
  • 실시설계도서의 품질은 시공, 그리고 운영 및 관리단계에도 큰 영향을 미친다. 그리고 적절한 실시설계기간의 확보는 실시설계도서의 품질을 위해 중요한 요소이다. 따라서 이 연구는 2009년부터 2014년까지 조달청 맞춤형 서비스를 통해 발주된 총 42개의 건설프로젝트의 실시설계단계의 기간을 분석하였다. 분석에 의하면, 실제 실시설계기간은 계획 실시설계기간보다 1.33배에서 1.79배가 소요되었다. 계획 실시설계기간은 건설교통부 제2000-235호에서 고시하고 있는 방식대로 공사금액에 의해 산정하고 있었지만, 실제 실시설계기간은 공사금액과 아주 낮은 상관관계를 보였다. 이 결과를 토대로 실무자들과 인터뷰를 진행하였고, 공사금액이 실시설계기간과 낮은 상관관계를 보인 것은 이들에게 아주 잘 알려진 사실이었다. 그들은 공사의 복잡도, 설계변경의 정도, 그리고 발주처의 성향에 따라서 실시설계기간이 크게 좌우된다는 점을 언급하였다. 따라서, 실시설계도서의 품질을 향상시키기 위해서는 다양한 요소들을 실시설계기간 산정에 적용하여 적절한 기간을 산정해야하며, 고품질의 실시설계도서는 건설산업에 긍정적 효과를 불러일으킬 것으로 보인다.

학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석 (Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work)

  • 방종대;손정락
    • 토지주택연구
    • /
    • 제8권3호
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

Comparative Analysis of Lifting Loads of Tower Cranes by Core Structure Construction Methods

  • Choi, Yong Seok;Kim, Taehoon;Kim, Sangdae
    • 국제초고층학회논문집
    • /
    • 제9권3호
    • /
    • pp.301-306
    • /
    • 2020
  • In tall building construction, the appropriate control of lifting loads on tower cranes is critical in terms of the construction duration of structural works. The adoption of efficient construction methods can be the most effective way of minimizing the inputs of tower cranes and making a lifting plan and management easier. Based on actual data from a tall building project, this study comparatively analyzes lifting loads of tower cranes by the core structure preceding construction method (CSPCM) and the core structure succeeding construction method (CSSCM). The results revealed that the CSSCM could reduce up to about 56.3% of lifting loads for core works and significantly enhance lifting efficiency compared with the CSPCM. Consequently, this enabled a substantial reduction in the construction duration of structural works. This study provides a practical reference to assist engineers and managers in applying efficient construction methods and lifting equipment operation in tall building projects.

작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법 (Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities)

  • 이규진
    • 한국건설관리학회논문집
    • /
    • 제1권3호
    • /
    • pp.75-80
    • /
    • 2000
  • 공간의 분할이 많은 건축공사에서는 반복적 특성으로 인해 공정계획상에 다수의 대안이 존재한다. 공사기간은 각 액티비티의 기간뿐 아니라 반복되는 액티비티의 배열방법에 의해서도 많은 영향을 받는다. 본 연구는 각 액티비티에 적정한 선행 액티비티를 할당함으로써 여유시간을 최소화하는 공정계획기법을 제시하는 것을 목적으로 진행되었다. Line of Balance 기법을 기본으로 하는 기존연구와는 달리 본 연구에서는 AON방식의 네트워크 기법을 기본으로 하여 공간과 자원의 두 축 사이에 액티비티를 배열하였다. 각 액티비티별로 자원과 공간의 양방향으로 가장 적절한 선행 액티비티를 검색하여 여유시간을 최소화한다. 본 연구에서 제시한 액티비티 배열방법을 공동주택공사 건설공사를 대상으로 적용한 결과, 액티비티 배열을 달리함에 따라서 다수의 대안이 존재함을 확인할 수 있었으며 그중 적정대안을 찾아낼 수 있었다. 본 기법은 공동주택공사와 같은 다수의 유사공간으로 구성된 건설공사의 공정 계획에 도움을 줄 수 있을 것으로 판단된다.

  • PDF

건설사업관리자의 역량기반 경력관리체계 구축 방안 (Competency-Based Career Management System Plan for Construction Manager)

  • 정서영;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.60-61
    • /
    • 2016
  • The specialty of Construction Manager's work is largely depends on the project progress stage and the type of management work. However, at present, career management system manages only the type and duration of the construction project, disregarding specialty and competence. However, in order to select a right construction manager for the client's needs or project characteristics, career management should be subdivided and managed according to the project progress stages or the types of management. In addition, this career management plan is essential for construction managers to receive appropriate wages for their careers and competences. Therefore, this study proposes a classification system for the integration of career, work, and competency to promote effective career management.