• Title/Summary/Keyword: Appraisal and Assessment

Search Result 133, Processing Time 0.021 seconds

The effect of Neurofeedback training on brain wave activity and cognitive performance in chronic stroke patients (뉴로피드백(Neurofeedback) 훈련이 만성 뇌졸중 환자의 뇌파활성도와 인지수행력에 미치는 효과)

  • Lee, Young-Sin;Kim, Sang-Yeob;Kim, Chan-Kyu;Jung, Dae-In;Kim, Kyung-Yoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.5
    • /
    • pp.2329-2337
    • /
    • 2013
  • This study was done objected to the chronic stroke patients in order to evaluate change in brain wave activity and cognitive performance when Neurofeedback training. The subjects were over 6 months ago in chronic stroke patients screened-test through the 20 patients, 10 persons in each group were randomly placed. This was carried out in 4 weeks in total, with control group(n=10) on general physical therapy and experimental group(n=10) on general physical therapy along with Neurofeedback training. The general physical therapy was applied 5 times a week, 30 minutes at once, Neurofeedback training was applied as equally as the general physical therapy, which makes 20 times in total. To learn about the effect before the training, after training, and 2 weeks after the training in electric physiological measurement method of the brain, electroencephalogram(EEG) to examine challenges by calculating the absolute spectrum power for standard EEG change(%), followed by evaluation with clinical assessment tool MMSE-K, Stroop Test, Digit Span Test. As a result of comparing the change in brain wave through EEG, after training and 2 weeks after training showed that absolute ${\alpha}$-power and absolute ${\beta}$-SMR power of experimental group have increased and absolute ${\theta}$-power decreased significantly compared to experimental group I. Moreover, the MMSE-K score in trial appraisal has increased significantly, and the error in Stroop Test and Digit Span Test has decreased significantly. such results, with the chronic stroke patient's brain wave control, Neurofeedback training was determined to improve the cognitive performance. this study suggests a new training possibility of stroke patients by identifying the training effects of Neurofeedback training that trains the brain directly with brain wave control.

APPLICATION OF FUZZY SET THEORY IN SAFEGUARDS

  • Fattah, A.;Nishiwaki, Y.
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 1993.06a
    • /
    • pp.1051-1054
    • /
    • 1993
  • The International Atomic Energy Agency's Statute in Article III.A.5 allows it“to establish and administer safeguards designed to ensure that special fissionable and other materials, services, equipment, facilities and information made available by the Agency or at its request or under its supervision or control are not used in such a way as to further any military purpose; and to apply safeguards, at the request of the parties, to any bilateral or multilateral arrangement, or at the request of a State, to any of that State's activities in the field of atomic energy”. Safeguards are essentially a technical means of verifying the fulfilment of political obligations undertaken by States and given a legal force in international agreements relating to the peaceful uses of nuclear energy. The main political objectives are: to assure the international community that States are complying with their non-proliferation and other peaceful undertakings; and to deter (a) the diversion of afeguarded nuclear materials to the production of nuclear explosives or for military purposes and (b) the misuse of safeguarded facilities with the aim of producing unsafeguarded nuclear material. It is clear that no international safeguards system can physically prevent diversion. The IAEA safeguards system is basically a verification measure designed to provide assurance in those cases in which diversion has not occurred. Verification is accomplished by two basic means: material accountancy and containment and surveillance measures. Nuclear material accountancy is the fundamental IAEA safeguards mechanism, while containment and surveillance serve as important complementary measures. Material accountancy refers to a collection of measurements and other determinations which enable the State and the Agency to maintain a current picture of the location and movement of nuclear material into and out of material balance areas, i. e. areas where all material entering or leaving is measurab e. A containment measure is one that is designed by taking advantage of structural characteristics, such as containers, tanks or pipes, etc. To establish the physical integrity of an area or item by preventing the undetected movement of nuclear material or equipment. Such measures involve the application of tamper-indicating or surveillance devices. Surveillance refers to both human and instrumental observation aimed at indicating the movement of nuclear material. The verification process consists of three over-lapping elements: (a) Provision by the State of information such as - design information describing nuclear installations; - accounting reports listing nuclear material inventories, receipts and shipments; - documents amplifying and clarifying reports, as applicable; - notification of international transfers of nuclear material. (b) Collection by the IAEA of information through inspection activities such as - verification of design information - examination of records and repo ts - measurement of nuclear material - examination of containment and surveillance measures - follow-up activities in case of unusual findings. (c) Evaluation of the information provided by the State and of that collected by inspectors to determine the completeness, accuracy and validity of the information provided by the State and to resolve any anomalies and discrepancies. To design an effective verification system, one must identify possible ways and means by which nuclear material could be diverted from peaceful uses, including means to conceal such diversions. These theoretical ways and means, which have become known as diversion strategies, are used as one of the basic inputs for the development of safeguards procedures, equipment and instrumentation. For analysis of implementation strategy purposes, it is assumed that non-compliance cannot be excluded a priori and that consequently there is a low but non-zero probability that a diversion could be attempted in all safeguards ituations. An important element of diversion strategies is the identification of various possible diversion paths; the amount, type and location of nuclear material involved, the physical route and conversion of the material that may take place, rate of removal and concealment methods, as appropriate. With regard to the physical route and conversion of nuclear material the following main categories may be considered: - unreported removal of nuclear material from an installation or during transit - unreported introduction of nuclear material into an installation - unreported transfer of nuclear material from one material balance area to another - unreported production of nuclear material, e. g. enrichment of uranium or production of plutonium - undeclared uses of the material within the installation. With respect to the amount of nuclear material that might be diverted in a given time (the diversion rate), the continuum between the following two limiting cases is cons dered: - one significant quantity or more in a short time, often known as abrupt diversion; and - one significant quantity or more per year, for example, by accumulation of smaller amounts each time to add up to a significant quantity over a period of one year, often called protracted diversion. Concealment methods may include: - restriction of access of inspectors - falsification of records, reports and other material balance areas - replacement of nuclear material, e. g. use of dummy objects - falsification of measurements or of their evaluation - interference with IAEA installed equipment.As a result of diversion and its concealment or other actions, anomalies will occur. All reasonable diversion routes, scenarios/strategies and concealment methods have to be taken into account in designing safeguards implementation strategies so as to provide sufficient opportunities for the IAEA to observe such anomalies. The safeguards approach for each facility will make a different use of these procedures, equipment and instrumentation according to the various diversion strategies which could be applicable to that facility and according to the detection and inspection goals which are applied. Postulated pathways sets of scenarios comprise those elements of diversion strategies which might be carried out at a facility or across a State's fuel cycle with declared or undeclared activities. All such factors, however, contain a degree of fuzziness that need a human judgment to make the ultimate conclusion that all material is being used for peaceful purposes. Safeguards has been traditionally based on verification of declared material and facilities using material accountancy as a fundamental measure. The strength of material accountancy is based on the fact that it allows to detect any diversion independent of the diversion route taken. Material accountancy detects a diversion after it actually happened and thus is powerless to physically prevent it and can only deter by the risk of early detection any contemplation by State authorities to carry out a diversion. Recently the IAEA has been faced with new challenges. To deal with these, various measures are being reconsidered to strengthen the safeguards system such as enhanced assessment of the completeness of the State's initial declaration of nuclear material and installations under its jurisdiction enhanced monitoring and analysis of open information and analysis of open information that may indicate inconsistencies with the State's safeguards obligations. Precise information vital for such enhanced assessments and analyses is normally not available or, if available, difficult and expensive collection of information would be necessary. Above all, realistic appraisal of truth needs sound human judgment.

  • PDF

Review of 2015 Major Medical Decisions (2015년 주요 의료판결 분석)

  • Yoo, Hyun Jung;Lee, Dong Pil;Lee, Jung Sun;Jeong, Hye Seung;Park, Tae Shin
    • The Korean Society of Law and Medicine
    • /
    • v.17 no.1
    • /
    • pp.299-346
    • /
    • 2016
  • There were also various decisions made in medical area in 2015. In the case that an inmate in a sanatorium was injured due to the reason which can be attributable to the sanatorium and the social welfare foundation that operates the sanatorium request treatment of the patient, the court set the standard of fixation of a party in medical contract. In the case that the family of the patient who was declared brain dead required withdrawal of meaningless life sustaining treatment but the hospital rejected and continued the treatment, the court made a decision regarding chargeable fee for such treatment. When it comes to the eye brightening operation which received measure of suspension from the Ministry of Health and Welfare for the first time in February, 2011, because of uncertainty of its safety, the court did not accept the illegality of such operation itself, however, ordered compensation of the whole damage based on the violation of liability for explanation, which is the omission of explanation about the fact that the cost-effectiveness is not sure as it is still in clinical test stage. There were numerous cases that courts actively acknowledged malpractices; in the cases of paresis syndrome after back surgery, quite a few malpractices during the surgery were acknowledged by the court and in the case of nosocomial infection, hospital's negligence to cause such nosocomial infection was acknowledged by the court. There was a decision which acknowledged malpractice by distinguishing the duty of installation of emergency equipment according to the Emergency Medical Service Act and duty of emergency measure in emergency situations, and a decision which acknowledged negligence of a hospital if the hospital did not take appropriate measures, although it was a very rare disease. In connection with the scope of compensation for damage, there were decisions which comply with substantive truth such as; a court applied different labor ability loss rate as the labor ability loss rate decreased after result of reappraisal of physical ability in appeal compared to the one in the first trial, and a court acknowledged lower labor ability loss rate than the result of appraisal of physical ability considering the condition of a patient, etc. In the event of any damage caused by malpractice, in regard to whether there is a limitation on liability in fee charge after such medical malpractice, the court rejected the hospital's claim for setoff saying that if the hospital only continued treatments to cure the patient or prevent aggravation of disease, the hospital cannot charge Medical bills to the patient. In regard to the provision of the Medical Law that prohibit medical advertisement which was not reviewed preliminarily and punish the violation of such, a decision of unconstitutionality was made as it is a precensorship by an administrative agency as the deliberative bodies such as Korean Medical Association, etc. cannot be denied to be considered as administrative bodies. When it comes to the issue whether PRP treatment, which is commonly performed clinically, should be considered as legally determined uninsured treatment, the court made it clear that legally determined uninsured treatment should not be decided by theoretical possibility or actual implementation but should be acknowledged its medical safety and effectiveness and included in medical care or legally determined uninsured treatment. Moreover, court acknowledged the illegality of investigation method or process in the administrative litigation regarding evaluation of suitability of sanatorium, however, denied the compensation liability or restitution of unjust enrichment of the Health Insurance Review & Assessment Service and the National Health Insurance Corporation as the evaluation agents did not cause such violation intentionally or negligently. We hope there will be more decisions which are closer to substantive truth through clear legal principles in respect of variously arisen issues in the future.

  • PDF