• 제목/요약/키워드: Apartment Building Defect Lawsuit

검색결과 17건 처리시간 0.024초

공동주택 하자소송에서의 조경하자유형 사례분석 (Case Study on Landscape Defect Type of Defect Lawsuit in Apartment Building)

  • 박준모;서덕석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.263-264
    • /
    • 2016
  • Since 2000s in Korea, apartment building tended to become goods or assets rather than houses. Therefore, conflicts between supplier and consumer were aggravated, and the defect dispute has been increased rapidly. This dispute enlarges to defect lawsuit and it is social and economical matter. The landscape work in apartment building is main work for a resident that appearance and convenient facility which lawn, tree, fountain, chair, playground, and etc. A number of defects surround landscape work are important issue in defect lawsuit, but, a related research is a minority, and a regulation is incomplete. Therefore, this study is basic study for standard of landscape defect type. As case study on defect lawsuit, draw a landscape defect type in apartment building.

  • PDF

공동주택 하자감정을 위한 하자조사단계의 현장조사 업무 모델링 (Field Investigation Work Modeling on Defect Inspecting Step of Defect Consulting in Apartment Building of Korea)

  • 박준모;서덕석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.87-88
    • /
    • 2015
  • A defect dispute surrounding an apartment building is in constant trouble, a defect consulting is necessary that objective and impartial for solving a defect. The defect dispute about a defect lawsuit is conducted in the order that filling of lawsuit, consulting order, defect inspecting, estimating a repairing cost, writing a consulting report, submitting a consulting report, and decision by court. Of these, a step of defect inspecting is extensively investigated an occurred defect that each defect index and type from each part and place. At this time, it is collected of many data and created many information. For this, it need to organize and manage. The study is a modeling of field investigation work process that second phase of defect inspecting step. A literature study is defined a work until level 2. This study is defined the work until level 3 to 4. In addition, the modeling can do for using a job name, a place to job, a job to do, and a person concerned about defect consulting case. The modeling is expected a contribution of improving a defect consulting process and systematizing a judgment standard.

  • PDF

공동주택 하자보증금 청구소송에 의한 하자담보책임기간 연구 (A Study on the Term of Warranty Liability by the Law-suit Requesting of the Guarantee against Defects in the Apartment Building)

  • 구해식
    • KIEAE Journal
    • /
    • 제12권3호
    • /
    • pp.11-18
    • /
    • 2012
  • The purpose of this study is to contribute to solution of the defect dispute in apartment house in advance. We want to propose the improved devices in defect problems by investigating the money that exacted from the practical business of the inspection company and the money that a judge gave a decision in a civil court in 50 cases of the lawsuit to requesting the guarantee against defects and the improved schemes of the applied rate by analyzing the diagnosis money of each applied years about the term of warranty liability in 40 cases of the lawsuit separately from that. As the result, we have to reflect the defect of non construction and error construction on apartment building defects, which recognizes very important factor when we compute the defect repair warranty money and it needs to be rearranged the applied ratio in guarantee peried of housing law practically.

공동주택 하자실적자료 분석을 통한 철근콘크리트 공사의 하자담보책임기간 비교연구 (Comparative Review on Term of Warranty Liability of Reinforced Concrete Work through Occurred Defect Data Analysis in Apartment Building)

  • 서덕석;박준모
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.266-267
    • /
    • 2017
  • As apartment buildings defect lawsuits become socioeconomic problems, an objective basis system for the term of warranty liability of reinforced concrete constructions is urgent. This study was carried out as a basic study for developing a basis system for the term of warranty liability. To do this, defect data actual collected in apartment complexes were collected and analyzed. As the result of checking the cumulative rate of defect occurrence in reinforced concrete construction by year, the point of time of reaching the 90% level was the 5th years, which was similar with the provision of the Apartment Building Management Act. However, the current Supreme Court precedent has decided that the term of warranty liability for the main structural parts in reinforced concrete construction shall be 10 years and the dispute is expected to continue in the future in the defect lawsuit.

  • PDF

공동주택 하자소송단계에서의 하자인정항목에 관한 연구 (A Study on the Newly Recognized Defect Factors in Defect Lawsuits of Apartment Housing)

  • 고영태;신윤석;이명도
    • 한국건축시공학회지
    • /
    • 제20권6호
    • /
    • pp.567-576
    • /
    • 2020
  • 본 연구는 공동주택의 하자소송의 사례분석을 통해 하자소송단계에서 추가적으로 하자로 인정되는 하자 항목을 제안한다. 이 하자 항목은 하자소송에서 추가적인 비용의 증가, 일정 지연, 재감정 혹은 추가소송을 방지할 수 있을 것이다. 하자소송에서는 입주자 및 건설사에서 사전에 인지하지 못한 새로운 하자항목이 발생되며, 이를 새로운 하자인정항목으로 정의하였다. 이를 위해 본 연구에서는 국내의 15개의 하자소송의 사례분석을 실시하였다. 이를 통해 77개의 소송하자를 1차 선별하고 전문가 자문을 통해 최종적으로 23개의 소송하자를 도출하였다. 이후 하자의 요인을 분석하여 최종적으로 23개의 소송항목을 총 10개의 요인항목으로 정립하였으며, 사례연구를 통해 효용성을 분석하였다. 본 연구의 결과는 하자의 발생을 저감하고 분쟁을 최소화하는 데 기여할 수 있을 것이다.

공동주택 하자감정업무 표준절차개발을 위한 사례분석 (Case Study for Developing of Standard Process about Defect Consulting Work in Apartment Building)

  • 박준모;서덕석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.158-159
    • /
    • 2014
  • There is urgent for defect consulting work to standardize the investigated method, repaired and reinforced method, and estimated cost about defect in increasing a defect lawsuit of apartment building. For the purpose of developing the standard process of defect consulting work, the review that a used process in law and institution should take precedence. There is not prepared the national standard for defect consulting but is dependent on an experience and a practice of consultants. This study analyzes defect consulting case, defines main steps for developing the standard process, and draws phased work factors. As systemizing this, it is expected to apply to basic structure for developing the standard process of defect consulting work for the next.

  • PDF

공동주택 하자소송의 균열하자보수비 비교.분석 연구 (Comparative Analysis on Repairing Cost of Lawsuit on Concrete Crack Defect in Apartment Building)

  • 김법수;박준모;최정현;서덕석;김옥규
    • 한국건설관리학회논문집
    • /
    • 제12권6호
    • /
    • pp.142-150
    • /
    • 2011
  • 공동주택의 가치와 품질, 관리에 대한 요구와 관심이 증가하면서, 2000년대 이래로 입주자에 의한 권리주장이 하자분쟁으로 나타나, 꾸준히 증가하여 왔다. 이에 본 연구에서는 하자소송판례를 통해 균열 쟁점의 비용적 특성을 알아보기 위하여, 하자보수비용 중 77%를 차지하고 있는 균열하자보수비에 대한 세부쟁점을 분석하였다. 또한, 각 세부 쟁점에 대한 하자보수 비용의 구성 및 하자보수방법에 따른 비용의 차이 등을 분석하였다. 그 결과, 허용균열폭의 인정여부에 따라 균열보수비용의 차이가 발생함을 확인할 수 있었고, 보수보강방법을 표면처리, 충전식, 주입식 공법 중 어느 것을 선택하느냐에 따라 비용 차이가 크게 발생함을 알게 되었다. 한편, 도장방법에 따른 하자보수비용의 차이도 상당한 것으로 나타났다.

Proposing provisions of Standard Repair Method of Painting Work Defect by Lawsuit Case Study

  • Seo, Deokseok
    • 교육녹색환경연구
    • /
    • 제16권2호
    • /
    • pp.1-9
    • /
    • 2017
  • Defect dispute in apartment building has become a debating social issue. The system of defect lawsuit and the conciliation process are applicable to solve defect problems in South Korea. Among various defects, painting work defect is a critical issue because it requires large area works and entails a lot of cost. Accordingly, disputes on work procedure and cost calculation are argued oftenly between residents and housing providers. This study reviewed detailed main issues of painting work and propose relevant systems and standards. In this analysis, the main issues are categorized into pre-works, main work, and others. The most recent cases are compared and analyzed for each issue. After the analysis, following conclusions are obtained, (1) In defect lawsuit system, even though surface treatment work in pre-work step is part of main work, it has been separated and regarded as a separate work. (2) Although the main painting work are not significantly different from two systems, it is still necessary to achieve a consensus to close the gap in the methodology of painting area calculation and determining whole painting or partial painting. (3) In addition, unlike the profit rate of general construction works, that of painting work remained the maximum rate and additional charge rate for works carried out in higher place are different among cases. Therefore, it is determined that establishing consistent standards is urgent.

사용자 중심의 스마트 하자정보관리 시스템 개발을 위한 SWOT 분석 (SWOT Analysis on development to User-Oriented Smart Information Management System of defect in Apartment Building)

  • 김법수;박준모;김옥규;서덕석;최정현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.5-6
    • /
    • 2011
  • Defect dispute has been a continuous claim that concerning a apartment building. However, objective standard of judgment is inadequate to solve defect dispute. Furthermore, it need to scientific evidence that composited standard of judgment. This evidence has a necessary to collect a data for a long time and systematically analyze. Therefore, it need to develop smart information management system, in this study, it review user-oriented condition as swot analysis.

  • PDF

Analysis of Consulting Reports on Defect Disputes in Apartment Building

  • Seo, Deok-Seok;Park, Jun-Mo
    • 한국건축시공학회지
    • /
    • 제13권5호
    • /
    • pp.498-505
    • /
    • 2013
  • The main processes involved in a defect dispute are consulting, reviewing, and finally judging as an arbiter. This process of defect consulting produces a defect consulting report, but business practices and standards of judgment will differ among consultants, and have many problems. This study reviews the structure of a defect consulting report and considers the structure's problem, which is that it is not standardized. To achieve this, data of sixteen defect consulting report were collected involving defect lawsuit cases before or after 2010. The structure and index of the defect consulting reports were then reviewed, and the results are as follows. As for a structure based on fourteen index, there are suitable that judge a outline, a cost estimate data and a consulting work item by a consulting standard. Furthermore, analysis by each common parts and private parts is considered as appropriate about consulting items and estimate by standard. However, consulting item in construction progress and responsibility period for security that related on a cause and a responsibility of defect need to complement. Meanwhile, the first thing of issues are connected a defect consulting is urgent a standardization for a defect type.