• Title/Summary/Keyword: Annual cost

Search Result 699, Processing Time 0.022 seconds

Analysis of Economic Life Cycle for Hydro-Generator Based on Annual Equivalent Cost Method (연간등가비용법을 이용한 수력발전기의 경제적 수명주기 분석)

  • Lee, Sung-Hun;Chang, Jeong-Ho;Kim, Jin-O;Lee, Heung-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.11
    • /
    • pp.1993-1999
    • /
    • 2011
  • Today, the power utilities is setting on the slow load growth and the aging of power equipment, and then could spend the efforts on the stability of system performance. Asset management may be defined as the process of maximizing corporate profit by maximizing performance and minimizing cost over the entire life cycle of power equipment. Therefore, asset management is great way to fulfill the economic investment and the stability of system performance. This paper presents the application of effective asset managem ent from an economic perspective. A proposed method is considering the life cycle analysis using life cycle cost methodology for hydro-generator during the total life cycle. The life cycle cost methodology include a way to calculating maintenance and operating costs. The proposed method will be expected to play an important role in investment decision making considering economic evaluation.

The Socioeconomic Burden of Coronary Heart Disease in Korea

  • Chang, Hoo-Sun;Kim, Han-Joong;Nam, Chung-Mo;Lim, Seung-Ji;Jang, Young-Hwa;Kim, Se-Ra;Kang, Hye-Young
    • Journal of Preventive Medicine and Public Health
    • /
    • v.45 no.5
    • /
    • pp.291-300
    • /
    • 2012
  • Objectives: We aimed to estimate the annual socioeconomic burden of coronary heart disease (CHD) in Korea in 2005, using the National Health Insurance (NHI) claims data. Methods: A prevalence-based, top-down, cost-of-treatment method was used to assess the direct and indirect costs of CHD (International Classification of Diseases, 10th revision codes of I20-I25), angina pectoris (I20), and myocardial infarction (MI, I21-I23) from a societal perspective. Results: Estimated national spending on CHD in 2005 was $2.52 billion. The majority of the spending was attributable to medical costs (53.3%), followed by productivity loss due to morbidity and premature death (33.6%), transportation (8.1%), and informal caregiver costs (4.9%). While medical cost was the predominant cost attribute in treating angina (74.3% of the total cost), premature death was the largest cost attribute for patients with MI (66.9%). Annual per-capita cost of treating MI, excluding premature death cost, was $3183, which is about 2 times higher than the cost for angina ($1556). Conclusions: The total insurance-covered medical cost ($1.13 billion) of CHD accounted for approximately 6.02% of the total annual NHI expenditure. These findings suggest that the current burden of CHD on society is tremendous and that more effective prevention strategies are required in Korea.

Direct Costs of Cervical Cancer Management in Morocco

  • Berraho, Mohamed;Najdi, Adil;Mathoulin-Pelissier, Simone;Salamon, Roger;Nejjari, Chakib
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.13 no.7
    • /
    • pp.3159-3163
    • /
    • 2012
  • Background: For cervical cancer the epidemiological profile is poorly known in Morocco and no data is available concerning the direct medical costs. The purpose of this work is to estimate the direct cost of medical management of invasive cervical cancer during the first year after diagnosis in Morocco. Methods: The estimation of direct costs of medical management of invasive cervical cancer during the first year after diagnosis in Morocco is based on the estimation of individual cost in each stage which covers diagnosis, treatment and follow-up during first year. The cost was estimated per patient and whole cycle-set using the costs for each drug and procedure as indicated by the Moroccan National Agency for Health Insurance. Extrapolation of the results to the whole country was used to calculate the total annual cost of cervical cancer treatments in Morocco. Results: Overall approximately 1,978 new cases of cervical cancer occur each year in Morocco. The majority (82.96%) of these cases were diagnosed at a late stage (stageII or more). The cost of one case of cervical cancer depends on stage of diagnosis, the lowest cost is $382 for stageCis followed by the cost of stageIA1 for young women (< 40 years) which is $2,952. The highest cost is for stageIV, which is $7,827. The total cost of cervical cancer care for one year after diagnosis is estimated at $13,589,360. The share allocated to treatment is the most important part of the global care budget with an annual sum of $13,027,609 whereas other cost components are represented as follows: $435,694 for annual follow-up activity and $126,057 for diagnosis and preclinical staging. Conclusion: This study provides health decision-makers with a first estimate of costs and the opportunity to achieve the optimal use of available data to estimate the needs of health facilities in Morocco.

Application study of heat storage type GSHP system in Apartment building with central cooling and heating facilities using life cycle cost analysis (LCC 분석을 이용한 중앙공급식 공동주택의 수축열식 지열원 히트펌프시스템의 적용연구)

  • Lee, Sang-Hoon;Park, Jong-Woo;Cho, Sung-Hwan
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.1497-1502
    • /
    • 2009
  • The present study has been conducted economic analysis of heat storage type ground source heat pump system(HSGSHP) and normal ground source heat pump (GSHP) and central boiler system with individual air conditioning facility which are installed at the same building in the shared an apartment house. Cost items, such as initial construction cost, annual energy cost and maintenance cost of each system are considered to analyze life cycle cost (LCC) and simple payback period (SPP) with initial cost different are compared. The initial cost is a rule to the Government basic unit cost of production. LCC applied present value method is used to assess economical profit of both of them. Variables used to LCC analysis are prices escalation rate and interest rate mean values of during latest 10 years. The LCC result shows that HSGSHP (1,351,000,000won) is more profitable than central boiler system with individual air conditioning facility by 86.7% initial cost. And SPP appeared 8.0 year overcome the different initial cost by different annual energy cost.

  • PDF

Economic Analysis of an Internet Portal, 'NANOIN'

  • Kim, Heung-Kyu
    • Journal of the Korea Society of Computer and Information
    • /
    • v.21 no.6
    • /
    • pp.117-125
    • /
    • 2016
  • In this research, economic analysis of Integrated Information System for Nano-convergence Industy (hereafter 'NANOIN'), which was developed and has been in operation by Organization of Nano-convergence Industrial Cooperation, is conducted. For this purpose, the research has been carried out in the following order. First, NANOIN user's maximum willingness-to-pay is estimated using contingent valuation method, the number for NANOIN users is estimated using Bass Diffusion Model, and annual benefit from NANOIN is estimated. Next, annual cost from NANOIN is estimated using annual budget for NANOIN related planned activities. Finally, economic value of NANOIN is evaluated using economic analysis applied to the estimated annual NANOIN benefit and cost. From the economic analysis, it is found that NANOIN has some economic value. It is expected that the procedures suggested in this research can help to systematically evaluate economic value for public goods which have not only uncertain benefit from user's side but also uncertain demand just like NANOIN.

A Study on the Calculation of ConstrucitIon Costs and Their Annual Equivalent Recovery at PECT and GCT (컨테이너부두의 건설원가 및 연간투자비 회수액 산정에 관한 연구)

  • 이태우;임종길
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.11-18
    • /
    • 1999
  • Major factors that are considered to determine lease charges of container terminals are, among others, construction cost of berth, discount rate, financing cost, and size of annual equivalent recovery. This paper aims to calculate construction costs at PECT and GCT and their annual equivalent recovery on the basis of historical data, and to identify whether or not relationship of the above result and current lease charges at the two terminals are justifiable.

Application analysis to a shared apartment house of heat storage type GSHP system with dual storage tank (이중 축열조를 갖는 축열식 지열원 히트펌프시스템의 노인공동주택 적용 분석연구)

  • Park, Jong-Woo;Lee, Sang-Hoon;Cho, Sung-Hwan
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.27-32
    • /
    • 2008
  • The present study has been conducted economic analysis of heat storage type ground source heat pump system(HSGSHP) and normal ground source heat pump (GSHP) which are installed at the same building in the shared an apartment house. Cost items, such as initial cost, annual energy cost and maintenance cost of each system are considered to analyze life cycle cost (LCC) and simple payback period (SPP) with initial cost different are compared. The initial cost is a rule to the Government basic unit cost of production. LCC applied present value method is used to assess economical profit of both of them. Variables used to LCC analysis are prices escalation rate and interest rate mean values of during latest 10 years. The LCC result shows that HSGSHP (1,050,910,000won) is more profitable than GSHP by 68.9% initial cost. And SPP appeared 3.0 year overcome the different initial cost by different annual energy cost.

  • PDF

A Study on the Determination for the Economic Life-Time of a Self-Propelled Artillery (자주포 경제수명 결정에 관한 연구)

  • 최은성;최석철
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.3 no.1
    • /
    • pp.26-37
    • /
    • 2000
  • This research paper deals with the problem of determining the optimal life time in terms of economical sense for a self-propelled artillery. Equivalent Annual Cost Method(EACM) is used to evaluate the optimal life time, based on the acquisition cost, and the operation and maintenance cost. It is assumed that the operation and maintenance cost includes the costs for spare parts, petroleum and ammunition for training. From the result of this study, the optimal life time for a self-propelled artillery is between 13.9 years and 16.1 years with 95% confidence interval.

  • PDF

An integrated one-vendor multi-buyer production-inventory model with shipment consolidation policy incorporated

  • Sung Chang Sup;Noh Kyung Wan;Lee Ik Sun
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.1-7
    • /
    • 2003
  • This paper considers an Integrated one-vendor multi-buyer production-inventory model where the vendor manufactures multiple products In lot at Her associated finite production rates In the model. It is allowed for earth product to be shipped In lot to the buyers before the whole product production is not completed yet. Each product lot is dispatched to the associated buyer In a number or shipments. The buyers consume their products at fixed rates. The objective is to the production and shipment schedules in the Integrated system. which minimizes the mean total annual cost per unit time. The mean total annual cost consists or production setup cost inventory holding cost and shipment cost. For the model, an Iterative optimal solution procedure with shipment consolidation policy incorporated is derived. It is then tested through numerical experiments to show how efficient and effective He shipment consolidation policy is.

  • PDF

Optimal Heat Exchanger Network Synthesis for Minimum Equipment Cost (최소 유틸리티 및 장치비를 위한 최적 열 교환망 합성)

  • 김경숙;조영상;김호기
    • Journal of Energy Engineering
    • /
    • v.1 no.1
    • /
    • pp.87-96
    • /
    • 1992
  • Two major difficulties with finding an optimal solution to the heat exchanger network synthesis problems are the large solutionspace and the uncertainty in the formulation of the annual cost function. In this work, to overcome the first difficulty a problem reduction technique was developed. The second difficulty was also removed by dividing the annual cost function into four cost items. The optimal network structure for minimum equipment cost is then obtained by repeatedly applying the problem reduction technique and the heuristics in turn. The efficiency and the superiority of the method is demonstrated by examining two selected example problems.

  • PDF