• Title/Summary/Keyword: Annexation Survey

Search Result 3, Processing Time 0.017 seconds

An Empirical Study on Introduction of Annexation Survey for Efficiency of Public Land Management (국공유지관리 효율화를 위한 합병측량 도입의 실증 연구)

  • Lih, Bong-Joo;Choi, Yun-Soo
    • Journal of Cadastre & Land InformatiX
    • /
    • v.50 no.1
    • /
    • pp.5-23
    • /
    • 2020
  • According to the Korean Statistical Information Service(2019), the number of public land in Korea is 10,734,439parcels and 33,395㎢, accounting for 33.2% of the land area. In the meantime, the central government and local governments have been promoting the efficiency of public land management through annexation, but if the scale of cadastral record is different or the public land is registered in different types of cadastral maps, it is impossible to annexation and it is a major obstacle to the efficiency of public land management. As a way to solve these problems, the annexation method accompanied by survey was presented and the effect was analyzed. As a result, the number of parcels to be managed decreased by 91.7% and 99.6% of the actual survey cost was reduced despite the expenditure of only 54.9% of the existing method. It was found that the annexation survey of the public land, which are clustered by connection, can ultimately contribute to the efficiency of the public land management by newly establishing the indication of the public land. In the future, we hope that follow-up research on the public land management based on cadastral surveys will be conducted in various and in-depth ways.

A Study on the Problem and Improvement Plan of Management of Public Land Parcels (국공유지 필지 관리의 문제점 및 개선 방안)

  • Kim, Jin;Jung, Young-Jin;Kim, Jun-Ho;Lee, Hyun-Joon;Hong, Sung-Eon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.1
    • /
    • pp.136-145
    • /
    • 2015
  • This study analyzes the status and problems of current parcel management in the public land, and it suggests measures for improvement based on the analysis. For this, it looked into the status and problems of the public land's parcel management. One of the major problems was that the number of parcels was continuously increasing due to insufficient parcel management. The study found that the number was increasing every year by 128,520 parcels on average as of 2008. It also found that there was also non-coincidence between the status and the land use conditions in the cadastral records. An increasing set of minute parcels (minute polygon) has appeared because of these outstanding issues, and these errors have been included in the statistics survey on parcels, negatively influencing the credibility of the data. This study suggests ways to improve these issues including reduction in the number of parcels through annexation, enhancement of credibility of cadastral information through cadastral confirmation survey, and registration and management of public land parcels in consideration of the current status.

A Study on the Damages of Head Works by the Storm Flood in the Area of Cheong Ju and Boeun -Emphasis onFactors Influenced on the Disasters and their Countermeasures- (淸州 및 報恩地方의 頭首工洪水災害에 關한 調査硏究(II) -災害原因 및 對策方案을 中心으로-)

  • Nam, Seong-Woo;Kim, Choul-Kee
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.24 no.2
    • /
    • pp.49-55
    • /
    • 1982
  • The purpose of this study is to classify the factors influenced on the damages of head works suffered from the storm flood occurred on July 22 1980 in both Musim and Bochong rivers and to find out an integral counter measures against the causes influenced on the disaster of head works in the engineering aspect of planning, design, construction and maintenance. In this survey, number of samples was taken 25 head Works, and the counter measures against the causes of their disasters summarized was as follows, 1. In the aspect of planning a. As the flood water level after the establishment of head works is more increased than the level before setting of head works owing to having more gentle slope of river bed between the head works than nature slope of river bed. Number of head works should be reduced for the appropriate annexation of them b. In the place where head works is established on the curved point of levee, the destruction of levee becomes severe by the strong deflective current. Therefore the setting of head works on the curved point should be kept off as long as possible and in case of unavoidable circumstances the construction method such as reinforced concrete wall or stone wall filed with concrete and anchored bank revetments should be considered. 2. In the aspect of design a. As scoring phenomena at up stream is serious around the weir Where the concentration of strong current is present in such a place, up stream apron having impermeability should be designed to resist and prevent scoring. b. As the length of apron and protected bed is too short to prevent scoring as down stream bed, the design length should be taken somewhat more than the calculated value, but in the case the calculated length becomes too long to be profitable, a device of water cushion should be considered. c. The structure of protected river bed should be improved to make stone mesh bags fixed to apron and to have vinyl mattress laid on river bed together with the improvement for increasing the stability of stone mesh bags and preventing the sucked sand from the river bed. d. As the shortage of cut-off length, especialy in case of the cutoffs conneting both shore sides of river makes the cause of destruction of embankment and weir body, the culculation of cut-off length should be taken enough length based on seepage length. 3. In the aspect of design and constructions a. The overturing destruction of weir by piping action was based on the jet water through cracks at the construction and expansion joints. therefore the expansion joint should be designed and constructed with the insertion of water proof plate and asphalt filling, and the construction joint, with concaved shape structure and steel reinforcement. b. As the wrong design and construction of the weep holes on apron will cause water piping and weir destruction, the design and construction of filter based on the rule of filter should be kept for weep holes. c. The wrong design and construction of bank revetment caused the severe destruction of levee and weir body resulting from scoring and impulse by strong current and formation of water route behind the revetment. Therefore bank revetment should be designod and constructed with stone wall filled with concrete and anchored, or reinforced concrete wall to prevent the formation of water flow route behind the wall and to resist against the scoring and impulse of strong stream. 4. In the aspect of maintenance When the damaged parts occurred at head works the authorities and farmers concerned should find and mend them as soon as possible with mutual cooperation, and on the other hand public citizen should be guided for good use of public property.

  • PDF