• Title/Summary/Keyword: Andong dam

Search Result 165, Processing Time 0.025 seconds

Flood Risk Assessment with Climate Change (기후 변화를 고려한 홍수 위험도 평가)

  • Jeong, Dae-Il;Stedinger, Jery R.;Sung, Jang-Hyun;Kim, Young-Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1B
    • /
    • pp.55-64
    • /
    • 2008
  • The evidence of changes in the climate system is obvious in the world. Nevertheless, at the current techniques for flood frequency analysis, the flood distribution can not reflect climate change or long-term climate cycles. Using a linear regression and a Mann-Kendall test, trends in annual maximum precipitation and flood data for several major gauging sites were evaluated. Moreover, this research considered incorporating flood trends by climate change effects in flood frequency analyses. For five rainfall gauging sites (Seoul, Incheon, Ulleungdo, Jeonju, and Gangneung), upward trends were observed in all gauged annual maximum precipitation records but they were not statistically significant. For three streamflow gauging sites (Andong Dam, Soyanggang Dam, and Daecheong Dam), upward trends were also observed in all gauged annual maximum flood records, but only the flood at Andong Dam was statistically significant. A log-normal trend model was introduced to reflect the observed linear trends in annual maximum flood series and applied to estimate flood frequency and risk for Andong Dam and Soyanggang Dam. As results, when the target year was 2005, 50-year floods of the log-normal trend model were 41% and 21% larger then those of a log-normal model for Andong Dam and Soyanggang Dam, respectively. Moreover, the estimated floods of the log-normal trend model increases as the target year increases.

Analyzing Climate Zones Using Hydro-Meteorological Observation Data in Andong Dam Watershed, South Korea (수문기상 관측정보를 활용한 안동댐 유역 기후권역 구분 및 분석)

  • Kim, Sea Jin;Lim, Chul-Hee;Lim, Yoon-Jin;Moon, Jooyeon;Song, Cholho;Lee, Woo-Kyun
    • Journal of Climate Change Research
    • /
    • v.7 no.3
    • /
    • pp.269-282
    • /
    • 2016
  • Watershed area can be submerged due to constructions and management of dams, and these change can impact not only on ecosystem and environment of river basin area but also on local climate. This study is conducted to construct and classify climate zones of Andong Dam watershed where the area is submerged due to the construction of the dam. By applying Principal Components Analysis (PCA) and Getis-Ord $Gi^*$ statistics, three climate zones were classified for the result. Each zone was then analyzed and validated with climatic and geological features including topography, land cover, and forest type map. As a result of the analysis, there was a difference in temperature, elevation, precipitation and tree species distribution among the zones. Also, an analysis of land cover map showed that there were more agricultural land near Andong Reservoir. This study on the climatic classification is considered to be useful as the basis for decision-making or policy enforcement regarding ecosystem, environmental management or climate change response.

Basic Investigation about Hydro-Geomorphologic and Vegetation Cover Changes on the Regulated River - A Case of the Downstream River of Andong Dam/Imha Dam on the Nakdong River (조절된 하천의 수문지형학적 변화와 식생 피복의 변화에 관한 기초 조사 - 낙동강 안동댐/임하댐 하류 하천 사례)

  • Woo, Hyo Seop;Rhee, Dong Sup;Ahn, Hong Kyu;Lee, Chang Seok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.1335-1339
    • /
    • 2004
  • A hydro-geomorphologic change in a sand bed channel reach and vegetation expansion by changes in the How regime is analyzed in this study. Field and aerial photo surveys, basic hydrological analysis about flow regime change due to two dams, Andong Dam and Imha Dam, on the upstream river and computer modeling are conducted. Two Dams in the study reach have obviously affected downstream channel in many ways including the bed particle coarsening, vegetation expansion on the sandbars and following river channel braiding. The phenomenon of no vegetation on the large point bar in front of Hahwe Village seems due to disturbance of the sandbar surface probably due to the cross flow in the meander reach during the flood. Another reason for no vegetation is that the sandbar on this reach has lower subsurface water lovels, as compared with the others in the up- and downstream of the reach where vegetation expanded, which would hinder vegetation from germinating and growing on the sandbar.

  • PDF

The Study of Reservoir Operation for Drought Period (가뭄기간의 저수지 운영방안에 관한 연구)

  • Park Ki-Bum;Lee Soon-Tak
    • Journal of Environmental Science International
    • /
    • v.13 no.12
    • /
    • pp.1041-1048
    • /
    • 2004
  • In this study the results of optimal water supply analysis by operating constraints of reservoirs during drought period are as follows. During drought period, water supply reliability is possible about $97\~61{\%}$ by CASE 1-CASE 5. Water supply reliability is possible about $97.3{\%}$ in case of the Andong dam and $87.7{\%}$ in case of the Imha dam by CASE 3. Also, under the constraints of CASE 4, water supply reliability is possible about $87.5{\%}$ in case of the Andong dam and $73.3{\%}$ in case of the Imha dam. The reason what low of available water supply ratio is decreased inflow of Imha dam. When compare standard deviation of average storage with standard deviation of storage, stable storage can be secured during successive drought period. And it also can minimize shortage of water during drought. therefore, it is impossible that reservoir supply sufficient water but change of operating condition is better than pervious on that followed by full reservoir level. It is need that the study for optimal water supply during drought period has to be continued.

Analysis of Hydrograph by Dam Breach Shapes (댐 파괴형상에 따른 수문곡선 해석)

  • Park, Ki-Bum
    • Journal of Environmental Science International
    • /
    • v.16 no.4
    • /
    • pp.487-493
    • /
    • 2007
  • In this study is analysis which dams breach shapes are effect on peak discharge of dam-failure. The dam breach shapes and failure time are important peak discharge when dam failure. When dam failure times are 1hr, 2hr and 3hr condition for the ECRD and 0.1hr and 0.2hr for the CG and CFRD that breach shapes changed base length $B_b=1Hd,\;B_b=2Hd\;and\;B_b=3Hd$. As the results from DAMBRK(Dam Break model) peak discharge are increase base widths lengthen. As failure time is longer then peak discharge is decrease. So peak discharge is increase more short of dam failure time. Also peak discharge is increase become larger dam breach shapes.

Analysis of Parallel Reservoir Water Supply Capacity According to Water Supply Changes (용수공급 변화에 따른 병렬저수지 용수공급 능력 해석)

  • Jea Min Park;Ki bum Park
    • Journal of Environmental Science International
    • /
    • v.32 no.10
    • /
    • pp.675-684
    • /
    • 2023
  • In this study, the water supply reliability of the andong and Imha dam was analyzed using inflow data for 360 months from 1993 to 2022 through allocation model. First, in the analysis results of additional water supply to Deagu city, the water supply reliability of Rule (B) was the highest at 86% for andong dam, 84% for imha dam, and 80% for the control point. However, when the planned supply was supplied, the analysis results showed 94%, 93%, and 90%. Next, in the quantitative reliability analysis results, when considering additional water supply to Deagu city, Rule (A), Rule (B), and Rule (C) were analyzed as 88%, 88%, and 88%, respectively, based on the control point. When supplying the planned water supply, the quantitative reliability analysis results were 95% equally based on Rule (A), Rule (B), and Rule (C). Because of evaluating the two reliability methods, the number of shortages increases significantly when additional water is supplied to Daegu City, but the shortage is generally 5-7%, resulting in a relatively small shortage compared with the increase in the number of shortages. In the case of resilience and vulnerability, additional water supply to Daegu City takes more than two months to restore than the existing planned water supply, and the average shortage was calculated to be smaller than that of supplying the planned water. According to the results of the analysis, Andong dam has an average water storage of 130x106 m2 and Imha dam has 50x106 m2. In this deficient water supply can be compensated by water from the Nakdong river.

Coping with Climage Change through Coordinated Operations of the Andong & Imha Dams (안동-임하댐 연계운영을 통한 미래 기후변화 대응)

  • Park, Junehyeong;Kim, Young-Oh
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.12
    • /
    • pp.1141-1155
    • /
    • 2013
  • A number of studies have been performed to analyze climate change impacts of water resources system. In this study, a coordinated dam operation is compared with an existing operation strategy for coping with projected future runoff scenarios. GCMs (Global Circulation Models) and the LARS-WG downscaling method was used to project future climate scenarios. The water balance model called abcd was employed to estimate future runoff scenarios. The existing dam operation comes from the national dam construction guideline, which is called the "level-operation method." The alternative coordinated dam operation are constructed as a linear programming using New York City rule for refill and drawdown seasons. The results of annual total inflow in future is projected to decrease to 72.81% for Andong dam basin and 65.65% for Imha dam basin. As a result of applying future runoff scenarios into the dam operation model, the reliability of coordinated dam operation, 62.22%, is higher than the reliability of single dam operation, 46.55%. Especially, the difference gets larger as the reliability is low because of lack of water. Therefore, the coordinated operation in the Andong & Imha dams are identified as more appropriate alternative than the existing single operation to respond to water-level change caused by climate change.

Evaluation of High-Resolution Hydrologic Components Based on TOPLATS Land Surface Model (TOPLATS 지표해석모형 기반의 고해상도 수문성분 평가)

  • Lee, Byong-Ju;Choi, Young-Jean
    • Atmosphere
    • /
    • v.22 no.3
    • /
    • pp.357-365
    • /
    • 2012
  • High spatio-temporal resolution hydrologic components can give important information to monitor natural disaster. The objective of this study is to create high spatial-temporal resolution gridded hydrologic components using TOPLATS distributed land surface model and evaluate their accuracy. For this, Andong dam basin is selected as study area and TOPLATS model is constructed to create hourly simulated values in every $1{\times}1km^2$ cell size. The observed inflow at Andong dam and soil moisture at Andong AWS site are collected to directly evaluate the simulated one. RMSEs of monthly simulated flow for calibration (2003~2006) and verification (2007~2009) periods show 36.87 mm and 32.41 mm, respectively. The hourly simulated soil moisture in the cell located Andong observation site for 2009 is well fitted with observed one at -50 cm. From this results, the cell based hydrologic components using TOPLATS distributed land surface model show to reasonably represent the real hydrologic condition in the field. Therefore the model driven hydrologic information can be used to analyze local water balance and monitor natural disaster caused by the severe weather.