• 제목/요약/키워드: Anchored Slope

검색결과 17건 처리시간 0.023초

네일 및 지오텍스타일을 이용한 원위치 사면보강공법에 관한 연구 (A Study on In-Situ Slope Reinforcement Methods Using Nailed Geotextiles)

  • 김홍택
    • 한국지반공학회지:지반
    • /
    • 제10권4호
    • /
    • pp.133-152
    • /
    • 1994
  • In the present study, an economic design of Anchored Geosynthetic(AG) System applied mainly to reinforce unstable soil slopes is investigated. For this purpose methods of stability analysis are developed to determine the optimum installation angle, required minimum length and maximum spacing of nails. Anchorage of nails within the soil mass is achieved by frictional resistance to pull out along the effective length of the nails. Cases of infinite slope and finite slope are dealt with individually. Silce methods of stability analysis developed in the present study are limit-equilibrium-based. For the case of finite slope Spencer method which considers interslice force is modified to evalyate the overall stability. In addition, the effects of various design parameters on requried length and spacing of nails corresponding to the optimum orientation of nails are analyzed. Based on the analysis, a simplified equation is given for the optimum nail orientation. Also the importance of optimum nail orientation is illustrated throughout design example, and the appropriateness of judgment criterion are examined.

  • PDF

느슨한 모래지반(地盤)에서 앵커로 지지(支持)된 널말뚝의 배면지반침하(背面地盤沈下) (Settlement of Ground Surface behind Anchored Sheet-Piles in Loose Sand)

  • 천병식;강인성
    • 대한토목학회논문집
    • /
    • 제10권1호
    • /
    • pp.145-153
    • /
    • 1990
  • 본(本) 연구(硏究)는 굴착에 따른 지반심하(地盤沈下)와 벽변형(壁變形)의 관계를 규명하고자 느슨한 모래 지반(地盤)에서 앵커로 지지(支持)된 널말뚝의 모형실험(模型實險)을 한 것이다. 실험(實驗)에 고려된 요소로는 널말뚝의 하단구속(下端狗束), 앵커의 경사각(傾斜角), 널말뚝의 강성(剛性), 굴착단계(段階)이며 실험결과(實驗結果)는 기존의 이론(理論)과 버팀대로지지(支持)된 토류벽(土留壁)의 현장계측결과(現場計測結果)와 비교되었다. 분석결과(分析結果)는 일단(一段)의 앵커로 지지(支持)된 널말뚝의 지반침하(地盤沈下)를 예상하는 데에 이용될 수 있는 회귀식(回歸式)으로 나타냈고, 굴착으로 인한 벽변형(壁變形)과 지반침하(地盤沈下)는 굴착변의 지지방법(支持方法)에 따라 차이가 크다는 것을 확인하였다.

  • PDF

항만공사에 이용되는 널말뚝의 내진설계 (Seismic Design of Sheet Pile Walls Used in Harbor Construction)

  • 김홍택;방윤경;강인규;조원희
    • 대한토목학회논문집
    • /
    • 제11권4호
    • /
    • pp.171-187
    • /
    • 1991
  • 본 연구에서는 항만공사에 이용되는 캔틸레버식 널말뚝 및 앵커로 지지된 널말뚝의 내진설계를 위한 해석방법의 제시가 이루어졌다. 제시된 해석방법은 침투에 의한 수압 및 유효수평응력의 변화를 고려하였으며, 또한 Mononobe-Okabe 토압이론 및 Westergaard, Matsuo-Ohara의 동수압 계산식이 적용되었다. 아울러 앵커로 지지된 널말뚝의 경우에 대해 안전율의 크기 선택에 관한 비교가 이루어졌으며, 또한 조밀한 모래지반의 경우에 대해, 준설저면의 경사각, 널말뚝 양쪽면의 수위차, 앵커의 위치, 벽마찰각 등이 근입깊이, 앵커하중 및 최대모멘트에 미치는 영향이 분석되었다. 이외에도 조밀한 모래지반에 설치되는 앵커로 지지된 널말뚝의 예비설계를 위한 표의 제시가 이루어졌으며, 본 연구 해석방법의 적용범위는 자유지지법의 경우로 한정된다.

  • PDF

연약점성토지반의 얕은 굴착시 줄말뚝을 이용한 흙막이공 (Earth Retaining Structure Using a Row of piles during Shallow Excavation in Soft Clay)

  • 홍원표;윤종민;송영식
    • 한국지반공학회논문집
    • /
    • 제16권1호
    • /
    • pp.191-201
    • /
    • 2000
  • 본 연구에서는 굴착부지가 넓고 지하수위가 높은 점성토지반에 얕은 굴착시 종래에 널리 적용되었던 강널말뚝 흙막이공 대신 줄말뚝을 이용한 흙막이공을 제안하였다. 줄말뚝을 이용한 흙막이 구조물의 거동을 관찰하기 위하여 지하굴착기간 동안 경사계 및 지하수위계를 설치하여 말뚝과 지반의 수평변위와 지하수위 변화를 조사하였다. 현장계측결과 말뚝과 지반의 변형거동은 굴착면 기울기, 말뚝두부구속조건, 말뚝설치간격, 굴착지반의 안정수 등의 요소에 영향을 받는 것으로 나타났다. 그리고 줄말뚝을 이용한 흙막이공의 시공성과 안정성뿐만 아니라 근접시공의 문제점이 없는 연약지반에서는 강널말뚝 흙막이공보다 경제적인 공법임을 확인하였다.

  • PDF

Development of umbrella anchor approach in terms of the requirements of field application

  • Evirgen, Burak;Tuncan, Ahmet;Tuncan, Mustafa
    • Geomechanics and Engineering
    • /
    • 제18권3호
    • /
    • pp.277-289
    • /
    • 2019
  • In this study, an innovative anchoring approach has been developed dealing with all relevant aspects in consideration of previous works. An ultimate pulling force calculation of anchor is presented from a geotechnical point of view. The proposed umbrella anchor focuses not only on the friction resistance capacity, but also on the axial capacity of the composite end structure and the friction capacity occurring around the wedge. Even though the theoretical background is proposed, in-situ application requires high-level mechanical design. Hence, the required parts have been carefully improved and are composed of anchor body, anchor cap, connection brackets, cutter vanes, open-close ring, support elements and grouting system. Besides, stretcher element made of aramid fabric, interior grouting system, guide tube and cable-locking apparatus are the unique parts of this design. The production and placement steps of real sized anchors are explained in detail. Experimental results of 52 pullout tests on the weak dry soils and 12 in-situ tests inside natural soil indicate that the proposed approach is conservative and its peak pullout value is directly limited by a maximum strength of anchored soil layer if other failure possibilities are eliminated. Umbrella anchor is an alternative to conventional anchor applications used in all types of soils. It not only provides time and workmanship benefits, but also a high level of economic gain and safe design.

淸州 및 報恩地方의 頭首工洪水災害에 關한 調査硏究(II) -災害原因 및 對策方案을 中心으로- (A Study on the Damages of Head Works by the Storm Flood in the Area of Cheong Ju and Boeun -Emphasis onFactors Influenced on the Disasters and their Countermeasures-)

  • 남성우;김철기
    • 한국농공학회지
    • /
    • 제24권2호
    • /
    • pp.49-55
    • /
    • 1982
  • The purpose of this study is to classify the factors influenced on the damages of head works suffered from the storm flood occurred on July 22 1980 in both Musim and Bochong rivers and to find out an integral counter measures against the causes influenced on the disaster of head works in the engineering aspect of planning, design, construction and maintenance. In this survey, number of samples was taken 25 head Works, and the counter measures against the causes of their disasters summarized was as follows, 1. In the aspect of planning a. As the flood water level after the establishment of head works is more increased than the level before setting of head works owing to having more gentle slope of river bed between the head works than nature slope of river bed. Number of head works should be reduced for the appropriate annexation of them b. In the place where head works is established on the curved point of levee, the destruction of levee becomes severe by the strong deflective current. Therefore the setting of head works on the curved point should be kept off as long as possible and in case of unavoidable circumstances the construction method such as reinforced concrete wall or stone wall filed with concrete and anchored bank revetments should be considered. 2. In the aspect of design a. As scoring phenomena at up stream is serious around the weir Where the concentration of strong current is present in such a place, up stream apron having impermeability should be designed to resist and prevent scoring. b. As the length of apron and protected bed is too short to prevent scoring as down stream bed, the design length should be taken somewhat more than the calculated value, but in the case the calculated length becomes too long to be profitable, a device of water cushion should be considered. c. The structure of protected river bed should be improved to make stone mesh bags fixed to apron and to have vinyl mattress laid on river bed together with the improvement for increasing the stability of stone mesh bags and preventing the sucked sand from the river bed. d. As the shortage of cut-off length, especialy in case of the cutoffs conneting both shore sides of river makes the cause of destruction of embankment and weir body, the culculation of cut-off length should be taken enough length based on seepage length. 3. In the aspect of design and constructions a. The overturing destruction of weir by piping action was based on the jet water through cracks at the construction and expansion joints. therefore the expansion joint should be designed and constructed with the insertion of water proof plate and asphalt filling, and the construction joint, with concaved shape structure and steel reinforcement. b. As the wrong design and construction of the weep holes on apron will cause water piping and weir destruction, the design and construction of filter based on the rule of filter should be kept for weep holes. c. The wrong design and construction of bank revetment caused the severe destruction of levee and weir body resulting from scoring and impulse by strong current and formation of water route behind the revetment. Therefore bank revetment should be designod and constructed with stone wall filled with concrete and anchored, or reinforced concrete wall to prevent the formation of water flow route behind the wall and to resist against the scoring and impulse of strong stream. 4. In the aspect of maintenance When the damaged parts occurred at head works the authorities and farmers concerned should find and mend them as soon as possible with mutual cooperation, and on the other hand public citizen should be guided for good use of public property.

  • PDF

전단파와 전자기파를 이용한 연약 지반의 실내 압밀 특성 평가 (Evaluation of Consolidation Properties in Soft Soils Using Elastic and Electromagnetic Waves)

  • 이창호;윤형구;김준한;이종섭
    • 한국지반공학회논문집
    • /
    • 제24권8호
    • /
    • pp.25-34
    • /
    • 2008
  • 연약 지반의 거동 특성 평가를 위하여 전단파 속도와 전기저항을 측정할 수 있는 새로운 압밀셀을 개발하였다. 전단파의 발진과 수신을 위한 벤더엘리먼트는 압밀셀의 상 하부판 및 벽면에 설치하였다. 국부적인 간극비 변화를 평가하기 위하여 이중 쐐기 형식의 전기저항 탐침을 적용하였다. 벤더 엘리먼트와 전기저항 탐침은 나일론 재질의 스크류 안에 고정하였다. 나일론 재질의 스크류는 압밀셀과의 임피던스 차이로 인하여 압밀셀을 통한 파의 직접적 전달을 최소화하며, 고장난 벤더 엘리먼트와 전기저항 탐침을 쉽게 교환하게 해준다. 전기저항-대수 시간 곡선의 기울기 및 전단파 속도의 변화로부터 일차 압밀 시간을 평가하였다. 교란 효과가 적을 경우, 입자 배열은 전단파 속도에 영향을 미치며 이로부터 흙의 고유 이방성을 평가할 수 있었다. 압밀 실험동안 침하량으로 산정한 간극비와 전기저항으로부터 계산된 간극비는 거의 유사한 것으로 나타났다. 본 연구는 전단퐈 속도와 전기저항이 일차 압밀, 고유 이방성, 간극비 등 연약 지반의 압밀 특성 파악을 위한 보완적인 정보를 제공해 줌을 보여준다.