• Title/Summary/Keyword: Analytical Hierarchy Proces

Search Result 2, Processing Time 0.015 seconds

Determining Key Ecological Indicators for Urban Land Consolidation

  • Kuo-Liang Lin
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.513-524
    • /
    • 2009
  • Urban land consolidation, which is to reform land parcels to remove fragmentation and produce ideal blocks, is an effective means for urban renewal. Successful urban land consolidation brings out great benefits to the city officials as well as general public, such as improved city image, increased land value, and more effective land use. However, urban land consolidation can be detrimental to environment, especially in the ecological aspects, while the execution of land consolidation has been focused solely on development for the sake of human benefits. To remove negative effects of urban land consolidation to the ecological system, this paper is intended to establish a set of criteria for evaluating ecological impacts of an urban land consolidation plan. Firstly, key ecological indicators are identified using a special group decision-making process called "habitual domain analysis" and then individual weighting of each indicator is recorded by analytical hierarchy process. An urban ecological evaluation model with 4 levels and 23 indicators is thus developed.

  • PDF

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.