The report of the Korean Board of Audit and Inspection(BAI) on May 2007 indicates the problems of Life Cycle Cost (LCC) analysis and evaluation in the Design-Build(Turn-Key) and alternative bidding system. The point which the report indicates is that the cost estimation system for LCC analysis has nothing in common each other and there's no consistency among the repair cycle and ratio per facilities parts. For solving these problems, BAI demands the establishment of the guidelines for LCC analysis and evaluation from the competent authority Korean Ministry of Construction And Transportation(MOCT). The objective of this study is to develop the improvement directions for LCC analysis and evaluation which are suitable to the public construction projects especially for the Design-Build and alternative bidding system in Korea. For this study, the LCC related raws and regulations, LCC analysis guidelines of public cooperations, actual condition of LCC analysis and evaluation which include, the elements of LCC, the estimation rules of the initial cost and the maintenance cost, the analysis standards of time value of money, etc. are investigated to provide the improvement directions for LCC analysis and evaluation.
Purpose While the popularity of C2C auction platforms such as eBay is gradually decreased, this domain is still undermined to explain online bidding behaviors. Online bidders sometimes engage in impulsive bidding due to some of the online auction characteristics. Therefore, this study develops and tests a model of the impulsive bidding exhibited by online bidders in C2C auction platforms. Based on S-O-R framework, our model posits that both perceived time-pressure and competition intensity affect cognitive absorption which ultimately influences the impulsive bidding. Design/methodology/approach This study collected survey data from 214 C2C auction participants, who have prior experience on impulsive bidding and tested both measurement model and structural model by using CB-SEM (covariate-based structural equation modelling) technique. In this study, by using AMOS 20.0, we tested the measurement model for its overall fit, item reliability, and validity and further conducted the structural model to test our proposed hypotheses. Findings Based on our results, we found that perceived tim-pressure and competition intensity were positively related to cognitive absorption. We also found that the cognitive absorption was positively associated with impulsive bidding behavior. In this study, by developing our research model in S-O-R framework, we provide an alternative theoretical mechanism to describe online impulsive bidding behavior.
The aim of this paper is to investigate how the public procurement policy exerts an effect upon the technology innovation of the firm and to make alternative proposals how to reinforce the effect. Although the pubic procurement process based on its monopsonic idiosyncrasy implies the means to lead the firms' supply function, the present system has contributed a little to accelerate the technology innovation. In fact, the system is lacking of the evaluation capability referring to the technological computer among the bidding films. So as to reinforce the function of technology innovation of the public procurement policy, it is necessary to improve the procurement institutions, in particular bidding and contract system. Finally, the paper propose, on the on hand, to enlarge the application range of the total bidding system in order to apply more strictly the technology evaluation standards on bidding, and on the other hand, to multiply the competitive proposal and the incentive contract type.
Purpose - The purpose of this study is to find out any potential factors for explanatory variables when calculating the virtual successful bid rate in case of no collusion. Design/methodology/approach - An empirical analysis was conducted in this study with a regression analysis that included 725 bid samples under the public construction technical type bidding. Findings - The result of the basic analysis showed that there are several factors affecting the successful bid rate. First, collusion variable; second, government variable; third, successful bidder design score variable and the number of bidder variable among bidding features; fourth, turnkey variable based on the alternative method; fifth, civil works variable and plant works variable based on building work; sixth, asset variable and the fourth-quarter performance difference variable. However, the technical proposal method variable among bidding features was found to be statistically insignificant in column(4). Research implications or Originality - The significance of this research is that new variable such as the government variable and the fourth-quarter performance difference variable were added in the regression model, which showed statistically significant research results.
찰자를 선정하는 과정에서 치열한 경쟁이 벌어지게 되며 이때 다양한 부패가 발생될 가능성이 있다. 계약체결후에도 공사금액의 결정과정에서 다양한 부패가 발생되기도 한다. 이러한 건설부패는 건전한 산업의 발전을 저해하기도 하고 그로 인해 다양한 피해를 유발시키기도 한다. 그러므로 건설공사의 투명성을 강화하여 부패를 방지하기 위한 전략을 수립할 필요성이 있다. 따라서 본 연구에서는 입찰계약제도 측면에서 건설부패를 최소화하기 위해 전문가에 의한 낙찰자 선정서비스 도입방안을 제시하고, 다양한 발주방식의 도입, 대체분쟁해결방법의 활성화 등을 제시하였다.
공공투자사업에서는 최저가낙찰제, 턴키 제도, 대안입찰제 등 다양한 방식이 사용되고 있다. 최근 가격경쟁을 통한 효율성 제고를 주목적으로 하는 최저가낙찰제가 확대되어 시행되고 있다. 본 논문은 우리나라 입 낙찰 제도의 현황과 특징을 파악하고, 대형 공공투자사업에 주로 적용되는 최저가 낙찰제, 턴키 대안 입찰제도하에서의 가격 경쟁효과가 직접적으로 드러나는 낙찰률을 비교 분석하는 것에 의미가 있다. 각 입찰제도의 성과는 경쟁의 행태에 달려 있음을 고려하여 경쟁률과 낙찰률을 중심으로 여러 입찰제도의 입 낙찰 현황을 분석하였다. 1,000억원 이상 사업의 경우 최저가낙찰제하에서 평균 입찰참여자 수는 33.75명, 평균 낙찰률은 61.18%로 나타나, 턴키 대안 입찰제의 평균 입찰참여자 수 2.94명, 평균 낙찰률 90.20%와 큰 차이를 보였다. 최저가낙찰제의 경우 규모의 차이를 고려한다 하더라도 낙찰률이 현저히 낮으며, 경쟁의 정도가 심한 것을 확인할 수 있다. 이러한 낙찰률의 차이는 근본적으로 제도의 차이로 해석할 수 있으며, 경쟁의 차이로도 일부 해석할 수 있다. 민간투자사업의 경우, 평균 입찰참여자 수는 1.88명이며, 평균 낙찰률은 90%에 이르고 있어 경쟁 활성화를 통해 효율성을 제고할 여지가 있음을 제시하였다.
Turnkey contract system is an effective ordering system for the ordering organizations that technical engineers are insufficient for their construction projects. It is possible to reduce project duration and to improve project quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system including railway projects. The result includes various methods for improving the system based on the analysis of bid price and selection procedure.
The 1th International Conference on Construction Engineering and Project Management
/
pp.731-736
/
2005
The governmental attitude toward private investment and financing for infrastructure projects has changed from the initial prohibition to the current encouragement in China, which has been embodied in the legal documents and administrative process. However, the problem of identification, bidding, and approval procedure for privately financed infrastructure projects has been observed in policies and administrative measures promulgated by different or even the same government branches, which is prohibitive factors for smooth project implementation. After analysis of the identification, bidding, and approval process of infrastructure projects, the authors proposed a simplified and alternative procedure and clarified the key points of relevant project documents.
본 연구는 기존의 조건부가치측정에서 채택하고 있는 전통적 응답메커니즘은 사실상 불확실성이 존재하지 않는 실제 거래에 적용되는 응답메커니즘이라는 점을 밝히고, 불확실성이 존재하는 실제 거래에 적용되는 실제 위험응답메커니즘과 가상 거래에 적용되는 가상 위험응답메커니즘을 제안하고 있다. 지불의사(WTP)와 제시가격(bidding price)을 단순 비교하여 구매여부를 결정하는 전통적 응답메커니즘과 달리, 실제 위험응답메커니즘은 WTP의 평균값이 제시가격보다 최소한 리스크프리미엄보다 커야만 구매하고, 그렇지 않으면 구매를 포기한다. 또한 가상 위험응답메커니즘은 실제 위험응답메커니즘과 구조는 같으나 실제 리스크프리미엄보다 적은 리스크프리미엄을 기준으로 구매의사가 결정된다. 본 연구에서는 실제 데이터를 이용하여 전통적 응답메커니즘, 실제 위험응답메커니즘 그리고 가상 위험응답메커니즘에 대응하는 WTP 추정치를 비교함으로써 가상 위험 응답메커니즘이 소위 과소평가편의와 과대평가편의를 줄일 수 있는 해결 방안이 될 수 있음을 보이고 있다.
The Seoul Housing Corporation pronounced an alternative design competition and a bidding for Eunpyeong New Town in December of 2004. At first many construction companies were interested in the first New Town Project. But at last a few companies had proposed the alternative design and construction cost. This project needed a conjunction of design ideas and technology know-hows. And the client wanted the brand power of construction company. Ultimately the Corporation hoped that the first New Town Project will end up with high quality successfully. This competition had started with the original construction drawings. Then it needed some alternative ideas and the lowest cost. There were two drawings of non changeable part and changeable part. Non changeable parts are structure like housing unit plan, underground parking lots. Changeable parts are outdoor layout, interior design and building facade. So we tried all ideas of landscape technology and design principles within limited guidelines. The author applied new technology like tilted rooftop greening and sustained container greening on high-rise apartment house. This green technology will be the first trial in Seoul and in the world as well. Daewoo Corporation have accumulated greening technology through the researches by national funding since 2002. Through this New Town Project the green technology will go forward step by step.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.