우리나라 농어촌 지역은 경제 발전과 함께 식생활의 개선 및 주택 개량, 수세식 화장실 보급 확대등으로 생활 오수 발생량이 크게 늘고 있는 실정이다. 이에 1994년부터 정부는 하수도법에 의한 수질개선 대책 사업등으로 마을 하수도 사업이 진행되어 왔으나, 현재 몇몇 농어촌 지역의 마을하수도 시설의 노후화 및 처리용량 부적합 등으로 현재 질소, 인의 처리효율이 방류수 수질기준에 적합하지 못하여 주변 수역의 수질개선을 위한 고도처리개선이 필요한 실정이다. 따라서, 본 연구는 소규모 마을하수도처리시설에 적용하고자 하는 고도처리개선공정을 GPS-X(General Purpose Simulator) 시뮬레이션으로 계획수질을 추정하여 대상시설에 적합한 고도처리개선공정을 설계하였다. 측정결과, 각 반응조별 시뮬레이션에서 혐기조, 무산소조, SBR1, SBR2 모두 일정한 처리형태를 보였으며, 시뮬레이션을 통한 유출수 예측결과, SS의 경우 97.3%, BOD 97.5%, TCOD 87.3%, TP 81.1%, TN 74.5%의 제거효율을 보여, 안정적인 고도처리효과를 나타내는 것으로 판단된다.
KSCE Journal of Civil and Environmental Engineering Research
/
v.42
no.4
/
pp.481-491
/
2022
This study investigates the characteristics of the GAC adsorption behavior during the operation of a multi-stage cross-flow filtration and GAC adsorption process for the purpose of devising an advanced treatment of combined sewer overflows (CSOs) and evaluates the regeneration efficiency of spent GAC that has reached the design breakpoint. During the filtration process, suspended substances are easily removed, but dissolved organic substances are not removed, necessitating a process capable of removing dissolved organic substances for the advanced treatment of CSOs. In general, GAC adsorption has been applied under low-concentration organic conditions, such as for water purification and tertiary treatments of sewage, and has rarely been applied under conditions with high organic concentrations, such as with sewage or CSOs. Accordingly, this study will provide a new and interesting experience. Also in this study, the continuous operation and breakthrough characteristics of GAC according to the strength of the inflow organic matter were investigated, electrochemical regeneration was applied to the used GAC, and the regeneration efficiency was evaluated through desorption and re-adsorption tests. The results showed that the breakthrough period was 21 days under high concentration conditions, 28 days at medium concentrations, and 32 days under low concentration conditions. The desorption of adsorbed organic matter through electrolysis occurred in the range of 188 to 609 mgCOD/L depending on the electrolysis conditions, and the effect of the electrolyte type led to the finding that NaOH was slightly higher than H2O2.
A quantitative survey of the protozoa microfauna at bioreactor of advanced sewage treatment plant was carried out during a period of 11 months. In this study, 32 genera were identified, including 17 ciliates. The abundance of the important protozoa were compared with the operating parameters and water quality of the effluent of the plant using statistical procedure. Statistical analysis revealed a relationship between the abundance of some genera and removal rate. In particular, correlation analysis on the quality of effluent and protozoa indicated that Lepadella may be used as the bioindicator of TP removal and Trochilia, Entosiphon, Colepus may be used as the bioindicator of TN removal when water temperature was below $20^{\circ}C$.
In this study, a newly developed agitator with hydrofoil impeller applied to actual biological process in advanced wastewater treatment plant was evaluated. Several series of experiments were conducted in two different wastewater treatment plants where actual problems have been occurred such as the production of scums and sludge settling. For more effective evaluation, computational fluid dynamics (CFD) and measurements of MLSS (Mixed Liquor Suspended Solids) and DO (Dissolved Oxygen) were used with other measuring equipments. After the installation of one unit of vertical hydrofoil agitator in plant A, scum and sludge settling problems were solved and more than seventy percent of operational energy was saved. In case of plant B, there were three cells of each anoxic and anaerobic tanks, and each cell had one unit of submersible horizontal agitator. After the integration of three cells to one cell in each tank, and installation of one vertical hydrofoil agitator per tank, all the problems caused by improper mixing were solved and more than eighty percent of operational energy was found to be saved. Simple change of agitator applied to biological process in wastewater treatment plant was proved to be essential to eliminate scum and sludge settling problems and to save input energy.
Lab scale experimental study was carried out for SBR process, to investigate the effects of influent ship sewage organic compound removal and Bacillus sp. state on design parameters. This process was able to remove nitrogen and phosphorus as well as organic matter efficiently. More than $92.0\%$ of chemical oxygen demand(COD) were removed. In addition, about $84.0\%$ of total nitrogen (T-N) was reduced. The total phosphorus(T-P) reduction averaged $93\%$. The performance load of SBR process was shown to be $0.095kg{\cdot}TOC/m3{\cdot}day$. The pH was decreased from 8.1 to 7.0 within 30 min and increased to 7.3 at the end of anoxic stage, and these phenomena were explained. The sludge produced in the SBR process is characterized by low generation rate (about $0.36kg{\cdot}MLSS/kg{\cdot}TOC$) and excellent settleability. The number of Bacillus sp. in the SBR was $24.2\%$, indicating that Bacillus sp. was a predominant species in the reactor.
Demand for lithium-based secondary batteries is greatly increasing with the explosive growth of related industries, such as mobile devices and electric vehicles. In Korea, there are several top-rated global lithium-ion battery manufacturers accounting for 40% of the global secondary battery business. Most discarded lithium secondary batteries are recycled as scrap to recover valuable metals, such as Nickel and Cobalt, but residual wastes are disposed of according to the residual lithium-ion concentration. Furthermore, there has not been an attempt on the possibility of water discharge system contamination due to the concentration of lithium ions, and the effluent water quality standards of public sewage treatment facilities are becoming stricter year after year. In this study, the as-received waste water generated from the cathode electrode coating process in the manufacturing of high-nickel-based NCM cathode material used for high-performance and long-term purposes was analyzed. We suggested a facile recycling process chart for waste water treatment. We revealed a correlation between lithium-ion concentration and pH effect according to the proposed waste water of each recycling process through analyzing standard water quality tests and daphnia ecological toxicity. We proposed a realistic waste water treatment plan for lithium electrode manufacturing plants via comparison with other industries' ecotoxicology.
Currently an increase in domestic sewage and industrial wastewater causes serious water pollution in Korea. To solve water pollution problems, conventional activated sludge (CAS) system is generally used in wastewater treatment plant but this process is so ineffective in nitrogen and phosphorus. Even if CAS system is the major process, it must be improved instantly so as to remove nitrogen and phosphorus. Otherwise, the serious water pollution problems can't be resolved with CAS system. Therefore this study focused on the comparison of the treatment characteristics between ASA system and CAS system. And also the mass balance of each process of ASA system. The results from operating advanced step aeration (ASA) system indicated that the removal efficiency of BOD, COD, and SS was 89.9%, 74.5%, and 89.0% respectively. In comparison, the removal efficiency of BOD, COD, and SS for CAS system was 89.5%, 71.8%, and 89.5% respectively. In addition to the results, the TN removal efficiency of ASA system was 76.5% comparing to 32.7% of CAS system. It was concluded that the TN removal efficiency of ASA system was 44% higher than CAS system. And the TP removal efficiency was 81.4% in ASA system comparing to 25.2% in CAS system. It also means that over 56% of TP was removed in ASA system comparing to CAS system.
The objective of this study is to propose an alternative process for the small sewage treatment plants in rural communities. A biofilter has been used for biological wastewater treatment, which is becoming the alternative to the conventional activated sludge system. The proposed process used in this study, which is packed with floating media (i.e. expanded polystylene), has advantages of biofilter system and alternative flow system and they are incorporated into one process. Pilot and bench scale studies were performed using domestic wastewater. In the results of pilot plant study, it was observed that the stable effluent water quality was achieved and it met the present effluent criteria of suspended solid (SS), organic matters, T-N and T-P. In the study for determination of the cycle of backwashing, it was observed that the cycle of backwashing depended on BOD loading rates of influents. In the BOD loading rates of $0.5kg\;BOD/m^3{\cdot}day$ and $1.0kg\;BOD/m^3{\cdot}day$, the backwashing cycle of 28 hour and 16 hour were needed, respectively. The optimum backwashing time was 120~80 seconds at the media expansion rate of 50%. In the removal of SS, organic matters, T-N and T-P, SS removal was rather achieved by physical filtration than biological mechanism and the removal of organic matters except for SS, T-N and T-P were mainly rather achieved by biological mechanism than physical filtration. In bench-scale study, the effects of recirculation rate was investigated on removal of SS, TCOD, T-N and T-P. It was observed that the recirculation made removal efficiencies of SS, TCOD, T-N and T-P increased. Especially, in T-N removal, the increase of T-N removal efficiency of 40% was observed in the reicirculation rate of 1Q compared with 0Q.
Background: When developing water quality improvement strategies for eutrophic lakes, questions may arise about the relative importance of point sources and nonpoint sources of phosphorus. For example, there is some skepticism regarding the effectiveness of partial reductions in phosphorus loading; because phosphorus concentrations are too high in hypertrophic lakes, in-lake phosphorus concentrations might still remain within typical range for eutrophic lakes even after the reduction of phosphorus loading. For this study, water quality and the phytoplankton and zooplankton communities were monitored in a hypertrophic reservoir (Lake Wangsong) before and after the reduction of phosphorus loading from a point source (a sewage treatment plant) by the installation of a chemical phosphorus-removal process. Results: Before phosphorus removal, Lake Wangsong was classified as hypertrophic with a median phosphorus concentration of $0.232mg\;L^{-1}$ and a median chlorophyll-a concentration of $112mg\;L^{-1}$. The dominant phytoplankton were filamentous cyanobacteria for the most of the ice-free season. Following the installation of the advanced treatment process, phosphorus concentrations were reduced to $81mg\;L^{-1}$, and the N/P atomic ratio increased from 42 to 102. Chlorophyll-a concentrations decreased to $42{\mu}g\;L^{-1}$, and the duration of cyanobacterial dominance was confined to the summer season. Cyanobacteria in spring and autumn were replaced by diatoms and cryptomonads. Filamentous cyanobacteria in summer were replaced by colony-forming unicellular Microcystis spp. It was remarkable that zooplankton biomass increased despite the decrease in phytoplankton biomass, and especially cladoceran zooplankton which increased drastically. These responses to the reduction of point source P loading to Lake Wangsong imply that reducing the point source P loading can have a big impact even when nonpoint sources account for a large fraction of the total annual phosphorus loading. Conclusions: Our results also show that the phytoplankton community can shift to decreased cyanobacterial dominance and the zooplankton community can shift to higher cladoceran dominance, even when phosphorus concentrations remain within the typical range for eutrophic lakes following the reduction of phosphorus loading.
Han, Mideok;Park, Bae Kyung;Park, Ji Hyoung;Kim, Yong Seok;Rhew, Doug Hee
Journal of Korean Society of Environmental Engineers
/
v.37
no.9
/
pp.533-541
/
2015
We investigate the Japan's Master Plan of Comprehensive Sewerage System (JMPS) and Lake Biwa basin sewerage and suggest future development direction of the Watershed Sewerage System Maintenance Plan in Korea enforced on February 2, 2013. The JMPS is designed for compliance with the environmental standard for water quality under the Environmental Policy Act. The effluent standards applied in the master plan of Lake Biwa's Sewerage Plan for the Lake Biwa is tougher than the national standards. Therefore the Lake Biwa Baisn Sewerage System was the first in Japan to adopt facilities that perform advanced treatment for nitrogen and phosphorus removal. BOD, SS, T-N and T-P concentrations of discharge water of sewage are 0.9, 0.6, 5.5, 0.06 mg/L, respectively. Especially removal efficiency for BOD is 99.5 percent. It is necessary to study the diversification of the evaluation criteria, cost minimization approach, subsidy system improvement, economic concept of discharge load adjustment system and establishment of basin sewerage concept for the development of the basin sewerage plan in Korea.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.