• Title/Summary/Keyword: Additional Costs

Search Result 553, Processing Time 0.04 seconds

Image-guided surgery and craniofacial applications: mastering the unseen

  • Wang, James C.;Nagy, Laszlo;Demke, Joshua C.
    • Maxillofacial Plastic and Reconstructive Surgery
    • /
    • v.37
    • /
    • pp.43.1-43.5
    • /
    • 2015
  • Image-guided surgery potentially enhances intraoperative safety and outcomes in a variety of craniomaxillofacial procedures. We explore the efficiency of one intraoperative navigation system in a single complex craniofacial case, review the initial and recurring costs, and estimate the added cost (e.g., additional setup time, registration). We discuss the potential challenges and benefits of utilizing image-guided surgery in our specific case and its benefits in terms of educational and teaching purposes and compare this with traditional osteotomies that rely on a surgeon's thorough understanding of anatomy coupled with tactile feedback to blindly guide the osteotome during surgery. A 13-year-old presented with untreated syndromic multi-suture synostosis, brachycephaly, severe exorbitism, and midface hypoplasia. For now, initial costs are high, recurring costs are relatively low, and there are perceived benefits of imaged-guided surgery as an excellent teaching tool for visualizing difficult and often unseen anatomy through computerized software and multi-planar real-time images.

A Study on the Delivery Policy of Internet Bookstores (인터넷 서점의 배송정책에 관한 연구)

  • Kim, Ji-Pyo;Hong, Soon-Hyuk
    • IE interfaces
    • /
    • v.16 no.spc
    • /
    • pp.33-38
    • /
    • 2003
  • In this paper we study the delivery policy of internet bookstores and recommend the improved policy to increase customer satisfaction and sales revenue. We classify customers into two, the price-sensitive and the delivery time-sensitive, and develop a new shipping method, the unhurried shipping, for the price-sensitive who are reluctant to pay shipping fee for the small purchase but willing to wait extra time for the ordered goods. The customers could get discount on shipping fee by the unhurried shipping but have to accept the longer delivery lead-time. We investigate the possible ways to reduce costs with the prolonged delivery time and show that some costs regarding shipmentand inventory could be saved in order to make up for additional shipping costs for the price-sensitive.

Economic Analysis of Zero Energy Building in South Korea - focusing on Cost-Benefit analysis considering Social Cost - (공사비 변화에 따른 제로에너지건축물 경제성 분석 - 사회적비용을 고려한 비용편익 분석을 중심으로 -)

  • Kim, Jae-Moon
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.147-157
    • /
    • 2020
  • With the increasing obligation to reduce greenhouse gas emissions to the building sector, the government has been gradually expanding its obligation to zero-energy buildings since 2020. Since the ZEB certification took effect in 2017, 48 preliminary and main certifications have been completed as of March 2019, and most of them are public buildings or even certified, but have earned Grade 5 of ZEB. This means that compared with the number of annual building permits registered in Korea, the figure is insignificant, and that it receives little if not mandatory. Therefore, this study investigated empirical cases of ZEB additional construction cost and conducted cost benefit analysis according to changes in ZEB additional construction cost based on a preliminary feasibility analysis project recently conducted by the KDI. In addition, considering the public buildings, the social costs were considered, and the cost-benefit analysis method was the same as the KDI's preliminary feasibility analysis method. The analysis shows that if the ratio of ZEB additional construction cost is more than 5 percent, it is analyzed that there is no economic feasibility, and considering that the ratio of additional construction cost in the cases of ZEB in Korea is 17 percent to 38 percent, it will not be easy to obtain ZEB certification in terms of cost. Finally, to narrow these differences in cost and economic aspects, the overseas low energy and ZEB incentive examples proposed measures such as the concept of subsidy payment in Illinois and the compensation of social costs to private ZEB.

Cost-benefit Analysis of Mandatory Prescription in Korea (의약분업의 비용-편익 분석)

  • Kim, Han-Joong;Park, Eun-Cheol;Kang, Hye-Young;Jee, Young-Keon
    • Journal of Preventive Medicine and Public Health
    • /
    • v.33 no.4
    • /
    • pp.484-494
    • /
    • 2000
  • Objective : To evaluate the relative benefits and the costs associated with the introduction of the new pharmaceutical provision called 'Mandatory Prescription System' which separates the role of physicians from that of pharmacists with respect to the prescription and dispensation of from the perspective of consumers (i.e., patients). Methods : The costs of the system were measured by considering both direct and indirect costs. Direct costs included additional payments for ambulatory care and dispensing fees that occurred under the new system. indirect costs consisted of transportation expenses and costs related to time spent for physician consultation, waiting for the prescriptions to be filled, and extra traveling. Benefits identified in this study were the reduction of drug misuse and overuse, and the overall decrease in drug consumption among the Korean population. Sensitivity analysis was peformed for the inclusion of benefits for outpatients of hospitals, price elasticity, and increased fees for established patients. Results : The net benefit was estimated to be about minus 1,862 billion won and the benefit-cost ratio was 0.478. This indicates that the costs of 'Mandatory Prescription' outweigh its benefits, relative to the previous system. The sensitivity analysis results for all the variables considered in this study consistently showed the benefit-cost ratio to be less than 1. Conclusion : The results of this study suggest that implementing Mandatory Prescription System in Korea might be inefficient from the consumer's perspective. The results of this study do not coincide with the results of previous studies, presumably because of the differences in study design and in which items of costs and benefits were considered.

  • PDF

Study on the inventory level of repair parts for tanks (전차부품 재고관리 연구)

  • Won Un-Sang;Jung Chang-Yong
    • Journal of the military operations research society of Korea
    • /
    • v.4 no.1
    • /
    • pp.57-68
    • /
    • 1978
  • In forecasting the demand rate of repair parts for old tank types under the limited historical data, this reportan alyzes which techniques give the smallest forecasting error, also economic repair limits and the return for additional repair costs are formulated as a mathematical model

  • PDF

The effects of construction related costs on the optimization of steel frames

  • Choi, Byoung-Han;Gupta, Abhinav;Baugh, John W. Jr.
    • Structural Engineering and Mechanics
    • /
    • v.43 no.1
    • /
    • pp.31-51
    • /
    • 2012
  • This paper presents a computational study that explores the design of rigid steel frames by considering construction related costs. More specifically, two different aspects are investigated in this study focusing on the effects of (a) reducing the number of labor intensive rigid connections within a frame of given geometric layout, and (b) reducing the number of different member section types used in the frame. A genetic algorithm based optimization framework searches design space for these objectives. Unlike some studies that express connection cost as a factor of the entire frame weight, here connections and their associated cost factors are explicitly represented at the member level to evaluate the cost of connections associated with each beam. In addition, because variety in member section types can drive up construction related costs, its effects are evaluated implicitly by generating curves that show the trade off between cost and different numbers of section types used within the frame. Our results show that designs in which all connections are considered to be rigid can be excessively conservative: rigid connections can often be eliminated without any appreciable increase in frame weight, resulting in a reduction in overall cost. Eliminating additional rigid connections leads to further reductions in cost, even as frame weight increases, up to a certain point. These complex relationships between overall cost, rigid connections, and member section types are presented for a representative five-story steel frame.

Product-Mix Decision Using Lean Production and Activity-Based Costing: An Integrated Model

  • MOHSIN, Nidhal Mohammed Ridha;AL-BAYATI, Hossam Ahmed Mohamed;OLEIWI, Zahra Hasan
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.4
    • /
    • pp.517-527
    • /
    • 2021
  • While the two principles of lean manufacturing and time-driven activity-based costing (TDABC) have been established out of multiple incentives and do not follow the same particular targets, there is substantial commonality between them. In these conditions, the supply management of a multi-product system needs a rigorous production model to minimize costs. In this sense, this paper proposes an interactive model with the consideration of optimizing product-mix decisions using both lean development tools and TDABC. This paper proposes a qualitative approach using the case study of the Iraqi state company for battery production. The suggested model decreased manufacturing time and costs, along with some substantial reduction in idle production capacity by 26 percent in 2019, based on the findings of the case study. On the other hand, the proposed model gives two side advantages: an efficient division of costs on goods due to the use of time spent as a cost factor for products and cost savings due to the introduction of the lean manufacturing approach that reduces all additional costs and increases product-mix decisions. Furthermore, the analytical data gathered here suggests that the incorporation of lean management concepts and TDABC has a strong and important influence on product-mix decisions.

U-City Service Classification Standard & Cost Sharing Plan through the Case Studies of U-City Construction

  • Yun, Jeong-Ran;Lee, Sang-Hun;Yang, Dong-Suk
    • Land and Housing Review
    • /
    • v.2 no.2
    • /
    • pp.101-109
    • /
    • 2011
  • Recently, the construction of U-City or of U-City service (U-service) in many kinds of urban development projects becomes the general trend. However, as the construction of U-city comes into the spotlight like the trend of the times, various service constructions are being indiscreetly implemented since it's processed focusing on local specialized projects or local landmark project by a local autonomous entity or an institute in charge being off the original purpose of the improvement of living quality of residents and the efficiency of urban management, which causes a number of problems on the process, maintenance, operation and management of those projects. Therefore, this study is to derive the standard pattern of U-service construction through the analysis of patterns and numbers of U-service and problems during the process of construction in domestic U-City construction case district, and is aimed to suggest the reasonable direction of service construction based on this. 11 projects areas in which data related to U-service are available among U-City construction project areas were selected for the subjects of this study, and it's standardized with 228 detailed unit services that were suggested by U-Eco City R&D and with 11 service domains that are regulated in "the Act of ubiquitous city construction etc.", and it is limited to services that were suggested in U-City case area of which design was completed by July, 2010 based on this. The actual state of various U-service construction is analyzed through case studies as well as reviews on the legal and theoretical concept and the method of pattern classification of U-service, the plan for the standardization (pattern classification) of U-service and the plan for the construction body of service and to share the costs are suggested as the plan to construct reasonable U-service based on this for the method and the procedure of this study For the method to construct U-service, the plan to classify the pattern of U-service into the basic service and additional service is suggested, and whether it has the publicity, whether urban infrastructure is included, whether utilities are included, the body of realization, the recipients, the urgency, the importance and the spreading, etc. are suggested for the index to determine the pattern of service. The method to get the executor of a project to construct the basic service, the method to get the executor of a project to construct the most basic service among the group classification of service and to get a private entity and a local autonomous entity to perform additional service in the future, and the method to construct the whole service and to distribute the construction costs were suggested, and the first one that determines the body of construction after dividing U-service into the basic service and the additional service was evaluated to be the most reasonable one. And the plan to solve the problem that the excessive construction costs of U-service are shifted onto the executor of a project through benefit principle, balanced distribution principle and consultation and mediation between the interested parties was suggested for the criteria to share the costs.

Performance Evaluation of Left-Comer and Look-Ahead Chart Parsing for Small-Sized Context Free Grammar (소규모 문맥 자유 문법에 대한 Left-Corner / Look-Ahead 차트 파싱 알고리즘의 성능 평가)

  • Shim, Kwang-Seob
    • Journal of KIISE:Software and Applications
    • /
    • v.36 no.7
    • /
    • pp.571-579
    • /
    • 2009
  • A left-comer and look-ahead chart parsing algorithm suppresses the generation of meaningless intermediate structures, and thus, gains parsing speed-ups. However, the algorithm requires additional costs to maintain left-comer and look-ahead information throughout the parsing process. Albeit the additional costs, previous research shows that significant parsing speed-ups have been achieved for large-sized context-free grammars. In this paper, we perform similar experiments with a small-sized grammar. We still get parsing speed-ups, but relatively low. We also find that left-comer information has rather negative effects on parsing speed-ups.

The Impact of GHG Emission Trading System on Air Transport Industry and Implication in View of Regulatory Policy (규제정책의 관점에서 바라본 온실가스(GHG) 배출권거래제가 국내 항공운송산업에 미치는 영향)

  • Kim, Kwang-Ok;Park, Sung-Sik
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.27 no.1
    • /
    • pp.57-68
    • /
    • 2019
  • The emission trading system implemented in Korea is a system in which the government allocates or sells emission rights by setting the emission allowable amount to economic players subject to the emission trading system, allowing companies to freely trade shortfall or extra money through the emission trading market. Korea also had implemented its first emission trading system scheme period of time from 2015 to 2017. As a result of the first planning period in which total of seven Korean airlines were targeted, the emission amount was about 5.51 million KAU, while the quota amount was only about 4.85 million KAU, about 116% of the actual quota was emitted and Domestic airlines have incurred additional costs of about 10.7 billion won. Due to ICAO's implementation of CORSIA, the airlines are expected to have to shoulder additional costs because purchasing exceed quota will be increased in order to offset excess emissions not only on domestic but also on international routes. Thus, this paper had analyzed the characteristics of the carbon trading system of air transport industry and suggested a mix of regulatory policies as an improvement method.