• Title/Summary/Keyword: Accumulated Cost

Search Result 233, Processing Time 0.026 seconds

A study of improving filtration efficiency through SiC whisker synthesis on carbon felt by CVD VS method

  • Kim, Gwang-Ju;Choe, Du-Jin
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2016.02a
    • /
    • pp.150-150
    • /
    • 2016
  • Mankind is enjoying a great convenience of their life by the rapid growth of secondary industry since the Industrial Revolution and it is possible due to the invention of huge power such as engine. The automobile which plays the important role of industrial development and human movement is powered by the Engine Module, and especially Diesel engine is widely used because of mechanical durability and energy efficiency. The main work mechanism of the Diesel engine is composed of inhalation of the organic material (coal, oil, etc.), combustion, explosion and exhaust Cycle process then the carbon compound emissions during the last exhaust process are essential which is known as the major causes of air pollution issues in recent years. In particular, COx, called carbon oxide compound which is composed of a very small size of the particles from several ten to hundred nano meter and they exist as a suspension in the atmosphere. These Diesel particles can be accumulated at the respiratory organs and cause many serious diseases. In order to compensate for the weak point of such a Diesel Engine, the DPF(Diesel Particulate Filter) post-cleaning equipment has been used and it mainly consists of ceramic materials(SiC, Cordierite etc) because of the necessity for the engine system durability on the exposure of high temperature, high pressure and chemical harsh environmental. Ceramic Material filter, but it remains a lot of problems yet, such as limitations of collecting very small particles below micro size, high cost due to difficulties of manufacturing process and low fuel consumption efficiency due to back pressure increase by the small pore structure. This study is to test the possibility of new structure by direct infiltration of SiC Whisker on Carbon felt as the next generation filter and this new filter is expected to improve the above various problems of the Ceramic DPF currently in use and reduction of the cost simultaneously. In this experiment, non-catalytic VS CVD (Vapor-Solid Chemical Vaporized Deposition) system was adopted to keep high mechanical properties of SiC and MTS (Methyl-Trichloro-Silane) gas used as source and H2 gas used as dilute gas. From this, the suitable whisker growth for high performance filter was observed depending on each deposition conditions change (input gas ratio, temperature, mass flow rate etc.).

  • PDF

An Analysis of the Management of a Tertiary General Hospital (2011 to 2013)

  • Park, Hyun-Suk
    • Journal of Korean Clinical Health Science
    • /
    • v.3 no.1
    • /
    • pp.276-289
    • /
    • 2015
  • Purpose. To efficiently manage hospitals, this study aims to analyze the general characteristics, common-type balance sheet, common-type profit and loss statement and financial ratio of a tertiary general hospital and use the results as basic data for future hospital development by comprehending causes for problems and analyzing hospital management. Methods. By using information about a tertiary general hospital, located in A Metropolitan City, provided through Alio (www.alio.go.kr), a public organization information provider, Health Insurance Review & Assessment Service, and Ministry of Health and Welfare, this study used data during 3 years(2011 to 2013) by analyzing the general characteristics, common-type balance sheet, common-type profit and loss statement, industrial mean ratio and financial ratio of hospitals. Results. This study came to the following conclusions through the general characteristics, common-type balance sheet, common-type profit and loss statement, industrial mean ratio, financial ratio, circular chart and ROI by analyzing the data from 2011 to 2013. Conclusions. Overall, A Tertiary General Hospital showed an increase in fixed cost due to the construction of J Hospital and even in the size of capital and assets. It also showed an increase in medical profit, but the increase of its medical cost was higher, resulting in a financial loss. Especially, this hospital showed a slight decrease in net profit, featuring a reduction in inventory turnover. When the management of A Tertiary General Hospital was predicted based on such features, this hospital is expected to improve its profit structure through the opening of J Hospital, and it is necessary for this hospital to increase and sustain the turnover rate of inventories accumulated by managing them better.

The credit card approval information management using WIPI (WIPI를 이용한 신용카드 결제 정보 관리)

  • Kim, Won-Kyum;Han, Jae-Yong;Park, Hyo-Won;Lee, Sun-Heum
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.4
    • /
    • pp.824-829
    • /
    • 2009
  • SMS service is widely used for providing the approval information of a credit card when the payment is made by a credit card. But the message contained in the SMS is very simple and includes one time approval information. Although detailed approval informations could be retrieved by means of wire-network or mobile network services, the wire-network service could not be used on moving and the mobile network service requires high cost. In this paper, a WIPI application program managing the approval informations of a credit card based on the accumulated SMS messages in the cell phone has been developed. A cell phone user can conveniently can get the useful information such as the approval list on last month, the approval list on this month, the total amount on this month and the information about payment by installment from the developed program without any cost.

An Analysis of the Time-Lag Effects on the Investment of G4C E-Government System by analysing DB Data (운영 DB데이터 분석을 통한 G4C 전자정부 정보화 사업 투자 시차효과 분석)

  • Cho, Nam-Jae;Lim, Gyoo-Gun;Lee, Dae-Chul
    • Journal of Information Technology Applications and Management
    • /
    • v.16 no.4
    • /
    • pp.205-222
    • /
    • 2009
  • Considering time-lag in the performance evaluation of information system (IS) investment is important because its effect reveals after certain period of time passed. Particularly it is more in the systems of e-government informatization projects which the amount of investment and the scale of business are huge. Many methods to solve this issue have been proposed such as system dynamics methods, simulations, structural equations etc. However, it is still difficult and unsolved problem because collecting practical data for time-lag analysis is very hard. In this paper, we analyze IS time-lag effect through factor analysis using the accumulated practical operational DB data. For the performance evaluation of the G4C system, the representative e-government web portal, we selected eleven factors reflecting time passing in G4C DB data. With these factors this paper conduct time-lag analysis in four view points. First, we conducted 'Stabilizing of G4C system' and got a result that IS is needed about three years for the stabilization. Second, we conducted 'Utilization of G4C system' and got a result that the utilization reaches appropriate level after in three years later after the introduction of G4C system. Third, we conducted 'Cost reduction effect' and got a result that cost reduction is stable in the third year after the introduction of G4C system. Lastly, we conducted 'System maturity effect' and got a result that the system reaches to the quality level that users expect after third to fourth years. According to the results of this research, we found that performance of IS improv continuously not immediately, and it needs three or four years of time-lag.

  • PDF

A Study on the Improvement Method for Preventing Lift Stop Position Error using Double Sensor Based Lift Stop Sensing Device (Double Sensor Type 감지장치를 통한 리프트 정지위치 오차누적 개선 방안 제안)

  • Lee, Jong-Hyun;Kwon, Soon-Wook;Park, Sung-Ung;Lee, Mi-Na
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.110-119
    • /
    • 2012
  • The Plan and equipment of vertical lifting are very important in high-rise building construction site, and unmanned lifts usage is increasing for financial and efficient reason. However if lift stop position error occur, It can be accumulated. And the lift can not be available during an engineer fix the problem. So loss of time and cost will occur when lifts have problems. This paper reports an improved lift stop position sensing device for preventing loss of time and cost from lift stop position error. The result of tests showed that the system has a correction function of lift stop position error, and the accuracy of device which was developed in this paper was about 9.75mm better than existing equipment.

A management Strategy of Eating-Outdoors Besiness for Recovering IMF (IMF 극복을 위한 외식산업 경영전략)

  • 박명업
    • Journal of Applied Tourism Food and Beverage Management and Research
    • /
    • v.10
    • /
    • pp.187-202
    • /
    • 1999
  • We desperately recognize from the economic situation in IMF crisis that only competive goods and serviced. It is anticipated that this difficult situation will probably be continued till 1999. Therefore, it is necessary to think over real aspects of eating=outdoors in IMF period and to provide an opportunity to confront with this crisis. Analysis a recent tendency of domestic eating-outdoors business, there appears, first of all, dual types of eating-outdoors; the one is a sort of 'Cost Sale', which provides some special menu with lowest prices, and the other is a type of 'Family Restaurant', which regards the atmosphere of the place as one of the most essential elements. Both types are getting more popular today. As the result, neither of the alternative cannot recover the current Depression. It is natural that no other conditions can compete with good tastes, fancy atmosphere, and good prices. As a matter of fact, however, it is quite difficult to run this type of bussiness adjusted the above whole conditions. Therefore owners of eating-house must decide to run either ' Cost Sale' or 'Family Restaurant' first and investigate some problems and conditions accordingly. In ane way, the owner intensively visits to some eating houses which is similar style in size and management to that of his style in size and management to that of his and look over what is good and what is bad Right after this investigation, it is efficient for he or she to improve his or her business style in size and management in a short period. It is helpful to check some complements; improvement of signboards, cleaning up of the interior, selecting suitable menu, adjusted prices, tastes, and service quality etc. Although eating-outdoors business is hard hit by IMF, We hope that it would rapidly be brisk in 2000, becaused by that time the basis of each industry would be high qualified, and rich technology would be accumulated.

  • PDF

Project Schedule Risk Assessment Based on Bayesian Nets (베이지안넷 기반의 프로젝트 일정리스크 평가)

  • Sung, Hongsuk;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.9-16
    • /
    • 2016
  • The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.

Impact of Selective Health Benefit on Medical Expenditure and Provider Behavior: Case of Gastric Cancer Surgery (선별급여 도입이 위암수술의 건강보험 진료비 및 진료행태에 미치는 영향)

  • Cho, Su-Jin;Ko, Jung-Ae;Choi, Yeonmi
    • Health Policy and Management
    • /
    • v.26 no.1
    • /
    • pp.63-70
    • /
    • 2016
  • Background: Selective health benefit was introduced for decreasing economic burden of patients. Medical devices with economic uncertainty have been covered as selective health benefit by National Health Insurance since December 2013. We aimed to analyze impact of selective health benefit to medical expenditure and provider behavior focused on electrosurgery (ultrasonic shears, electrothermal bipolar vessel sealers) for gastric cancer patients covered since December 2014. Methods: We used the National Health Insurance claims data of 2,698 patients underwent gastric cancer surgery between August 2014 and March 2015. Medical cost and patient sharing per inpatient day were analyzed to verify that covering electrosurgery increased medical expenditure and changed provider behavior from open surgery to endoscopic or laparoscopic surgery. Additionally, we analyzed the claim rate of medical device or goods relating gastric endoscopic and laparoscopic surgery. Results: Medical cost and patient sharing per inpatient day were increased after covering electosurgery as selective health benefit (39,724/1,421 won). However, there were no medical expenditure increases after adjusting claim of electosurgery and patient sharing was decreased 1,057 won especially. The coverage of selective health benefit did not increase the claim rate of medical device or goods related endoscopic or laparoscopic surgery, either. Conclusion: Covering electosurgery decreased patient economic burden and did not change of provider behavior. Expanding selective health benefit is needed to decrease economic burden of severe patients. Further study should evaluate the long term effect with accumulated data.

A Study on Development of Hypermedia Couseware for Fashion Design Education (의상디자인 교육용 하이퍼미디어 코스웨어 개발 연구)

  • 조진숙;한명숙
    • The Research Journal of the Costume Culture
    • /
    • v.8 no.5
    • /
    • pp.629-637
    • /
    • 2000
  • This paper focuses on the development of a fashion design educational program that will foster the talent and aesthetic consciousness of fashion design students. The goal of progressive educational methods with cutting edge technology is to elevate educational efficiency, and ultimately rear creative designers. To fulfill its objective, this paper presents a courseware program on fashion design education utilizing hyper media that include animation, photographs, pictures, sounds and characters. By the utilization of such comprehensive source of information media, a hypermedia courseware was developed for elementary education in fashion design with the following conclusions : 1. The program enables the students to customize their fashion design education. The students of fashion design education programs are able to choose and adjust their own programs to suit their requirements and intellectual level. 2. The program effectively motivates. Much like a constant sequence of various images on a screen that can provoke profound heart-felt emotions and inspire creativity, the program can stimulate and motivate the students. 3. The program provides a consistent education. To advance the overall quality of fashion design education, the problem of dissonance in educational content should be resolved and possible individual errors in delivery rectified. The present program will solve such problems, and establish coherent standards that will withstand the test of time regardless of time or place. 4. The program is cost effective. Since the present program frees the teacher from the time consuming drudgery of preparing various texts and lesson plans, have the materials delivered and handled, it reduces the time and cost previously required. 5. The program has the capability to be upgraded. The accumulated know-how of teachers and the total experience of the program can be linked with other programs for limitless expansion.

  • PDF

Design of Large-scale Drilled Shaft (대구경 현장타설말뚝의 설계 사례)

  • Im, Chul-O;Choi, Young-Seok;Kwak, Ki-Seok;Jang, Hak-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.545-553
    • /
    • 2009
  • A lot of long-span marine bridge, which connects land to island or island to island, are being designed and constructed lately in south-west coast in South Korea. In the past, caisson foundations in marine were mainly adopted in construction and stability aspect, however, nowadays with development of pile construction technology, drilled shaft foundations are mainly adopted. As the long span cable stayed bridge and suspension bridge applied with lots of loads are being designed, the scale of pile foundations are getting larger. As the construction cost of substructure including foundation in marine bridges is too high, the appropriate evaluation of the axial bearing capacity of pile becomes a core factor to decide the construction cost of foundation if the drilled shaft is adopted as foundation type of bridge. The evaluation values of skin friction and end bearing capacity of drilled shaft in weathered rock suggested in south Korea are only to introduce the foreign specifications, and most of them are designed in a kind of hard soil layer. Also the allowable load of pile section is less than the expected bearing capacity of pile in the soil condition since the allowable capacity of pile is undervalued. Recently in order to improve this factor the bi-axial hydraulic load test of pile was taken, the data of load transfer analysis of pile, unit of skin friction and end bearing capacity are accumulated. In our country, the design of piles are made with ASD, however, LRFD considering service, strength and extreme state was adopted in Incheon Grand Bridge implemented with BTL, and the research to systematize the resistance coefficient appropriate at home country are being progressed.

  • PDF