• Title/Summary/Keyword: Above-Ground Parking

Search Result 11, Processing Time 0.017 seconds

A study on the correction of the connection part of the underground facility 3D model and the correction of irregularities (지하시설물 3차원 모델 연결부 보정 및 요철보정에 관한 연구)

  • Kim, Sung Su;Han, Kyu Won;Heo, Sung Seo;Han, Sang Hoon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.6
    • /
    • pp.429-435
    • /
    • 2021
  • The integrated underground space map shows the underground facility(water supply, sewage, gas, electric power, communication, heating), underground structures (subway, underpass, underground walkway, underground parking lot, underground shopping mall, common ward), ground(drilling, coffin, geology) refers to a map constructed so that a total of 15 types of underground information can be checked at a glance on a three-dimensional basis. The purpose of this study is to develop a technology to correct the problem of curved surface processing and the unevenness of underground facility pipelines that occur in converting 2D underground facility data into 3D-based underground space integrated map(3D underground facility model). do it with. To this end, we first investigated and reviewed the domestic and foreign status of technologies that generate data on underground facilities based on three dimensions, and developed a surface correction algorithm and an unevenness correction algorithm to solve practical problems. Algorithms to verify the developed algorithm This applied correction program was developed. Based on the above process, the three-dimensional model of the underground facility could be produced identically to reality. This study is judged to have significance as a basic study to improve the utilization of the underground spatial integration map.